BEGIN:VCALENDAR VERSION:2.0 X-WR-CALNAME:NLR PacketNet (L3) Scheduled Maintenances PRODID:-//Apple Computer, Inc//iCal 2.0//EN X-WR-RELCALID:9F5CEEB3-53E1-4CDE-9E76-77-sched_maint X-WR-TIMEZONE:America/Indianapolis CALSCALE:GREGORIAN METHOD:PUBLISH BEGIN:VEVENT SEQUENCE:1 DTSTART:20060524T080001Z SUMMARY: 2152 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance DTEND:20060524T100001Z DESCRIPTION:TICKET NUMBER: 2152\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Wednesday, May 24, 2006, 8:35 AM (0835)\nEND TIME: Wednesday, May 24, 2006, 9:36 AM (0936)\nDESCRIPTION:Layer 1 engineers will be replacing a ORP module in Akron. Outages are expected during this maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=2152&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060523T080001Z SUMMARY: 2153 NLR Layer 3 Backbone Circuits Spanning LOSA-SEAT Maintenance DTEND:20060523T110001Z DESCRIPTION:TICKET NUMBER: 2153\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-49\nNLR-LOSA-SEAT-10GE-113\nNLR-LOSA-SEAT-10GE-115\n\n\nSTART TIME: Tuesday, May 23, 2006, 8:15 AM (0815)\nEND TIME: Tuesday, May 23, 2006, 8:51 AM (0851)\nDESCRIPTION:L1 NOC Engineering will be replacing a ORH-ELH card at Corning, CA. Outages are expected during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=2153&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060517T200201Z SUMMARY: 2156 NLR Layer 3 Backbone Circuits CHIC-STAR and CHIC-WASH Maintenance COMPLETED DTEND:20060517T200701Z DESCRIPTION:TICKET NUMBER: 2156\nMAINTENANCE TYPE: Software\nAFFECTED: \nSTART TIME: Wednesday, May 24, 2006, 8:02 AM (0802)\nEND TIME: Wednesday, May 24, 2006, 8:07 AM (0807)\nDESCRIPTION:StarLight engineers will be performing a software upgrade on the Starlight Force10 E1200. The duration of the outage should last 15 minutes, however the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=2156&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060601T050001Z SUMMARY: 2157 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance DTEND:20060602T110001Z DESCRIPTION:TICKET NUMBER: 2157\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Thursday, June 1, 2006, 6:16 AM (0616)\nEND TIME: Thursday, June 1, 2006, 7:08 AM (0708)\nDESCRIPTION:Level3 techs will be performing permanent cable restoration between HOUS and ELPA. An outage of 1 minute is expected.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=2157&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060601T040001Z SUMMARY: 6056 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance DTEND:20060601T100001Z DESCRIPTION:TICKET NUMBER: 6056\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Thursday, June 1, 2006, 4:56 AM (0456)\nEND TIME: Thursday, June 1, 2006, 4:57 AM (0457)\nDESCRIPTION:Level 3 request this maintenance window so that they can splice fibers to add a customer lateral. An outage of up-to 50ms is expected, however the whole maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6056&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060519T110001Z SUMMARY: 6000 NLR Member PSC Maintenance DTEND:20060519T180001Z DESCRIPTION:TICKET NUMBER: 6000\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member PSC\n\nSCHEDULED START TIME: Friday, May 19, 2006, 11:00 AM (1100)\nSCHEDULED END TIME: Friday, May 19, 2006, 6:00 PM (1800)\nDESCRIPTION:During the above time frame, Member PSC will be performing maintenance on their border router. \nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6000&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060519T030001Z SUMMARY: 6002 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance DTEND:20060519T040001Z DESCRIPTION:TICKET NUMBER: 6002\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-60\n\nSCHEDULED START TIME: Friday, May 19, 2006, 3:00 AM (0300)\nSCHEDULED END TIME: Friday, May 19, 2006, 4:00 AM (0400)\nDESCRIPTION:APP work on the SEAT-DENV Route, no outages are expected\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6002&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060526T030001Z SUMMARY: 6015 NLR Layer 3 Router ATLA Maintenance DTEND:20060526T040001Z DESCRIPTION:TICKET NUMBER: 6015\nMAINTENANCE TYPE: Software\nAFFECTED: atla.layer3.nlr.net;\nSTART TIME: Friday, May 26, 2006, 3:43 AM (0343)\nEND TIME: Friday, May 26, 2006, 3:51 AM (0351)\nDESCRIPTION:Back to normal. BGP sessions are up.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6015&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060718T080001Z SUMMARY: 6106 NLR Layer 3 Backbone Circuit DENV-CHIC and DENV-HOUS Maintenance Completed DTEND:20060718T100001Z DESCRIPTION:TICKET NUMBER: 6106\nMAINTENANCE TYPE: Hardware\nAFFECTED: Backbone Circuit DENV-CHIC and DENV-HOUS\n\nSTART TIME: Tuesday, July 18, 2006, 8:09 AM (0809)\nEND TIME: Tuesday, July 18, 2006, 8:15 AM (0815)\nDESCRIPTION:NLR Layer 1 Engineering and Level 3 technicians performed maintenance at the Level(3) facility in Culbertson, NE to replace a faulty OP-ELH card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6106&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070305T070001Z SUMMARY: 6640 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20070305T110001Z DESCRIPTION:TICKET NUMBER: 6640\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSTART TIME: Monday, March 5, 2007, 7:13 AM (0713)\nEND TIME: Monday, March 5, 2007, 8:22 AM (0822)\nDESCRIPTION:NLR NOC Layer 1 engineers, with the assistance of a Level (3) Communications technician, replaced a card in Albuquerque, NM. Outages were expected during the maintenance. Maintenance has been completed \nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6640&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070221T090001Z SUMMARY: 6635 NLR Layer 3 Backbone Circuits Spanning SEAT-CHIC Maintenance Completed DTEND:20070221T120001Z DESCRIPTION:TICKET NUMBER: 6635\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-SEAT-10GE-58\nNLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Wednesday, February 21, 2007, 9:00 AM (0900)\nSCHEDULED END TIME: Wednesday, February 21, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineering upgraded firmware along the routes spanning Seattle to Chicago. No outages were expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6635&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070213T100001Z SUMMARY: 6624 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070213T120001Z DESCRIPTION:TICKET NUMBER: 6624\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Tuesday, February 13, 2007, 10:14 AM (1014)\nEND TIME: Tuesday, February 13, 2007, 11:23 AM (1123)\nDESCRIPTION:NLR Layer 1 NOC Engineering with the assistance of a Level(3) Communications Technician, replaced a failed TXP card in Pensacola, Florida. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6624&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070206T100001Z SUMMARY: 6601 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070206T120001Z DESCRIPTION:TICKET NUMBER: 6601\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, February 6, 2007, 10:10 AM (1010)\nEND TIME: Tuesday, February 6, 2007, 10:16 AM (1016)\nDESCRIPTION:NLR Layer 1 NOC Engineering with the assistance of PNWGP Technicians, replaced a defective card in Seattle, WA. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6601&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061003T060001Z SUMMARY: 6319 NLR Layer 3 Backbone Circuits Spanning CHIC-DENV and CHIC-HOUS Maintenance Completed DTEND:20061003T100001Z DESCRIPTION:TICKET NUMBER: 6319\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\n\nSCHEDULED START TIME: Tuesday, October 3, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, October 3, 2006, 10:00 AM (1000)\nDESCRIPTION:NLR L1 Engineers performed firmware upgrades on 15808s along the CHIC-KANS route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6319&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061004T060001Z SUMMARY: 6320 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20061004T103001Z DESCRIPTION:TICKET NUMBER: 6320\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Wednesday, October 4, 2006, 10:21 AM (1021)\nEND TIME: Wednesday, October 4, 2006, 10:31 AM (1031)\nDESCRIPTION:NLR L1 Engineers performed firmware upgrades on 15808s along the KANS-DENV route. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6320&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070828T010001Z SUMMARY: 7128 NLR Layer 3 Peer CA*Net4 (NEWY) Maintenance Completed DTEND:20070828T035901Z DESCRIPTION:TICKET NUMBER: 7128\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net4 (NEWY)\n\nSCHEDULED START TIME: Tuesday, August 28, 2007, 1:00 AM (0100)\nSCHEDULED END TIME: Tuesday, August 28, 2007, 3:59 AM (0359)\nDESCRIPTION:NLR Peer CA*net4's will perform circuit maintenance. The maintenance is expected last up to 30 minutes, However, the entire maintenance window will be observed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7128&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070218T080001Z SUMMARY: 6619 NLR Layer 3 Backbone Circuit NEWY-WASH Maintenance Completed DTEND:20070218T120001Z DESCRIPTION:TICKET NUMBER: 6619\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSTART TIME: Sunday, February 18, 2007, 11:02 AM (1102)\nEND TIME: Sunday, February 18, 2007, 11:10 AM (1110)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications technician, replaced a card in McLean, VA. Outages were expected during the maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6619&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070213T040001Z SUMMARY: 6620 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070213T100001Z DESCRIPTION:TICKET NUMBER: 6620\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Tuesday, February 13, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, February 13, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Route JACK-PENS under went fiber maintenance in Jacksonville, FL. No impact was expected however the entire maintenance window was reserved. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6620&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070206T020001Z SUMMARY: 6615 BGP to Abilene Management ***Tracking*** DTEND:20070206T060001Z DESCRIPTION:TICKET NUMBER: 6615\nMAINTENANCE TYPE: Circuit\nAFFECTED: IXP: Starlight\nConnector: MREN\n\nSCHEDULED START TIME: Tuesday, February 6, 2007, 2:00 AM (0200)\nSCHEDULED END TIME: Tuesday, February 6, 2007, 6:00 AM (0600)\nDESCRIPTION:Internet2 Engineers will be migrating Starlight and MREN connections in Chicago. A 2-3 minute outage will occur, however the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6615&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060525T060001Z SUMMARY: 6052 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance DTEND:20060525T120001Z DESCRIPTION:TICKET NUMBER: 6052\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSCHEDULED START TIME: Thursday, May 25, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, May 25, 2006, 12:00 PM (1200)\nDESCRIPTION:Level 3 to perform circuit maintenance\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6052&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060530T120001Z SUMMARY: 6057 NLR Layer 3 Member UCAR Maintenance DTEND:20060530T130001Z DESCRIPTION:TICKET NUMBER: 6057\nMAINTENANCE TYPE: Software\nAFFECTED: \nSCHEDULED START TIME: Tuesday, May 30, 2006, 12:00 PM (1200)\nSCHEDULED END TIME: Tuesday, May 30, 2006, 1:00 PM (1300)\nDESCRIPTION:NLR Member UCAR will be bringing up their BGP connection with CSM. If the router crashed during this maintenance, their peering with NLR will be affected.\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6057&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T040001Z SUMMARY: 6058 NLR Layer 3 Backbone Circuit CHIC-WASH and NEWY-CHIC Maintenance DTEND:20060602T100001Z DESCRIPTION:TICKET NUMBER: 6058\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSCHEDULED START TIME: Friday, June 2, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, June 2, 2006, 10:00 AM (1000)\nDESCRIPTION:Level3 to perform circuit maintenance\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6058&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060621T040001Z SUMMARY: 6060 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Postponed DTEND:20060621T060001Z DESCRIPTION:TICKET NUMBER: 6060\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSCHEDULED START TIME: Wednesday, June 21, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Wednesday, June 21, 2006, 6:00 AM (0600)\nDESCRIPTION:Layer1 with assistance of level3 to perform haradware maintenance\nTIMESTAMP: Sat Nov 7 11:03:01 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6060&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060613T080001Z SUMMARY: 6077 NLR Layer 3 Backbone Circuit DENV-CHIC and DENV-HOUS Maintenance DTEND:20060613T100001Z DESCRIPTION:TICKET NUMBER: 6077\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, June 13, 2006, 8:28 AM (0828)\nEND TIME: Tuesday, June 13, 2006, 8:50 AM (0850)\nDESCRIPTION:Level3 Technicians will be replacing an ORP_ELH card in Haigler, NE. An outage of up to the entire maintenance window is possible during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6077&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T040001Z SUMMARY: 6078 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance DTEND:20060602T060001Z DESCRIPTION:TICKET NUMBER: 6078\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSCHEDULED START TIME: Friday, June 2, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, June 2, 2006, 6:00 AM (0600)\nDESCRIPTION:Level (3) will be cutting and splicing fibers for a customer lateral during the above maintenance window. This maintenance is expected to be service impacting.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6078&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070312T060001Z SUMMARY: 6683 NLR Layer 3 Backbone Circuits Spanning DENV-CHIC Maintenance Completed DTEND:20070312T120001Z DESCRIPTION:TICKET NUMBER: 6683\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36 \nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Monday, March 12, 2007, 9:14 AM (0914)\nEND TIME: Monday, March 12, 2007, 10:11 AM (1011)\nDESCRIPTION:Level(3) Technicians will perform circuit maintenance relocating fiber in Apache Flats, MO. A two hour long outage is expected, however the entire window has been reserved. A backup maintenance time has also been confirmed for March 13, over the same time frame. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6683&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070312T050001Z SUMMARY: 6685 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070312T100001Z DESCRIPTION:TICKET NUMBER: 6685\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Monday, March 12, 2007, 5:01 AM (0501)\nEND TIME: Monday, March 12, 2007, 5:08 AM (0508)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced cards in Baton Rouge, LA. A brief outage was expected, however, the entire maintenance window was reserved. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6685&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070320T040001Z SUMMARY: 6691 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Completed DTEND:20070320T070001Z DESCRIPTION:TICKET NUMBER: 6691\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, March 20, 2007, 4:59 AM (0459)\nEND TIME: Tuesday, March 20, 2007, 5:13 AM (0513)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced three cards in Cleveland, OH. Brief outages had occurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6691&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060529T230001Z SUMMARY: 6065 NLR Layer 3 Peer CA*Net4 Maintenance DTEND:20060530T010001Z DESCRIPTION:TICKET NUMBER: 6065\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSTART TIME: Monday, May 29, 2006, 11:03 PM (2303)\nEND TIME: Tuesday, May 30, 2006, 12:26 AM (0026)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 lost BGP connectivity to NLR. CA*Net 4 has been contacted and are investigating, but as of yet, no cause for outage has been provided.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6065&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070419T070001Z SUMMARY: 6785 NLR Layer 3 Backbone Circuits Spanning DENV-KANS Maintenance Completed DTEND:20070419T110001Z DESCRIPTION:TICKET NUMBER: 6785\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Thursday, April 19, 2007, 7:23 AM (0723)\nEND TIME: Thursday, April 19, 2007, 7:45 AM (0745)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have performed firmware upgrades on the circuit listed above. Brief outages have occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6785&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070425T090001Z SUMMARY: 6784 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070425T110001Z DESCRIPTION:TICKET NUMBER: 6784\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Wednesday, April 25, 2007, 9:00 AM (0900)\nSCHEDULED END TIME: Wednesday, April 25, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Technician, have upgraded firmware in Atlanta, GA. No outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6784&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070316T060001Z SUMMARY: 6698 NLR Layer 3 Backbone Circuits Spanning DENV-CHIC Emergency Maintenance Completed DTEND:20070316T110001Z DESCRIPTION:TICKET NUMBER: 6698\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Friday, March 16, 2007, 6:50 AM (0650)\nEND TIME: Friday, March 16, 2007, 6:56 AM (0656)\nDESCRIPTION:Backbone Circuits Spanning DENV-CHIC were unavailable to the community as Level(3) Technicians performed circuit maintenance. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6698&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060606T070001Z SUMMARY: 6063 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance DTEND:20060606T090001Z DESCRIPTION:TICKET NUMBER: 6063\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSTART TIME: Tuesday, June 6, 2006, 7:00 AM (0700)\nEND TIME: Tuesday, June 6, 2006, 8:34 AM (0834)\nDESCRIPTION:OPT-PRE card at SLIDLA25A reporting a Laser Bias Failure. Layer 1 with assistance from Level3 to perform hardware maintenance\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6063&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060607T090001Z SUMMARY: 6064 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance DTEND:20060607T110001Z DESCRIPTION:TICKET NUMBER: 6064\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSTART TIME: Wednesday, June 7, 2006, 9:15 AM (0915)\nEND TIME: Wednesday, June 7, 2006, 9:21 AM (0921)\nDESCRIPTION:Laser Bias Failure alarms on OPT-PRE card at LCDLMS25A(SLOT 16) MM\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6064&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T120001Z SUMMARY: 6073 NLR Layer 3 Router SEAT Maintenance DTEND:20060602T050001Z DESCRIPTION:TICKET NUMBER: 6073\nMAINTENANCE TYPE: Software\nAFFECTED: PacWave\nPNW\nCENIC\nTransPAC2\nCENIC\n\nSTART TIME: Thursday, June 1, 2006, 12:56 PM (1256)\nEND TIME: Thursday, June 1, 2006, 1:17 PM (1317)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the SEAT-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6073&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T030001Z SUMMARY: 6074 NLR Layer 3 Router NEWY Maintenance DTEND:20060602T050001Z DESCRIPTION:TICKET NUMBER: 6074\nMAINTENANCE TYPE: Software\nAFFECTED: MANLAN \nCornell\nnewy.layer3.nlr.net;\nSTART TIME: Friday, June 2, 2006, 4:30 AM (0430)\nEND TIME: Friday, June 2, 2006, 4:38 AM (0438)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the NEWY-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6074&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T030001Z SUMMARY: 6075 NLR Layer 3 Router WASH Maintenance DTEND:20060602T050001Z DESCRIPTION:TICKET NUMBER: 6075\nMAINTENANCE TYPE: Software\nAFFECTED: wash.layer3.nlr.net;\nSCHEDULED START TIME: Friday, June 2, 2006, 3:00 AM (0300)\nSCHEDULED END TIME: Friday, June 2, 2006, 5:00 AM (0500)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the WASH-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6075&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T030001Z SUMMARY: 6076 NLR Layer 3 Router CHIC Maintenance DTEND:20060602T050001Z DESCRIPTION:TICKET NUMBER: 6076\nMAINTENANCE TYPE: Software\nAFFECTED: Starlight\nUltralight/LHCnet\nCA*net4\nUSGS\nOklahoma\nchic.layer3.nlr.net;\nSTART TIME: Friday, June 2, 2006, 3:15 AM (0315)\nEND TIME: Friday, June 2, 2006, 3:23 AM (0323)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the CHIC-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6076&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060627T040001Z SUMMARY: 6067 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060627T060001Z DESCRIPTION:TICKET NUMBER: 6067\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSTART TIME: Tuesday, June 27, 2006, 4:54 AM (0454)\nEND TIME: Tuesday, June 27, 2006, 4:56 AM (0456)\nDESCRIPTION:RALE03 BOARD EXTRACTED - Opening TAC case\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6067&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060601T120001Z SUMMARY: 6068 IOS-XR code upgrades on various CRS DTEND:20060602T050001Z DESCRIPTION:TICKET NUMBER: 6068\nMAINTENANCE TYPE: Software\nAFFECTED: \nSCHEDULED START TIME: Thursday, June 1, 2006, 12:00 PM (1200)\nSCHEDULED END TIME: Friday, June 2, 2006, 5:00 AM (0500)\nDESCRIPTION:6/1 1200-1400 UTC 6/2 0300-0500 UTC\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6068&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060601T120001Z SUMMARY: 6070 NLR Layer 3 Router HOUS Maintenance DTEND:20060601T140001Z DESCRIPTION:TICKET NUMBER: 6070\nMAINTENANCE TYPE: Software\nAFFECTED: Oklahoma\nLONI\nhous.layer3.nlr.net;\nSTART TIME: Thursday, June 1, 2006, 12:56 PM (1256)\nEND TIME: Thursday, June 1, 2006, 1:17 PM (1317)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the HOUS-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6070&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060601T120001Z SUMMARY: 6071 NLR Layer 3 Router DENV Maintenance DTEND:20060601T140001Z DESCRIPTION:TICKET NUMBER: 6071\nMAINTENANCE TYPE: Software\nAFFECTED: UCAR\ndenv.layer3.nlr.net;\nSTART TIME: Thursday, June 1, 2006, 1:12 PM (1312)\nEND TIME: Thursday, June 1, 2006, 1:17 PM (1317)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the DENV-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6071&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060602T120001Z SUMMARY: 6072 NLR Layer 3 Router LOSA Maintenance DTEND:20060602T140001Z DESCRIPTION:TICKET NUMBER: 6072\nMAINTENANCE TYPE: Software\nAFFECTED: Ultralight\nCENIC\nUniv. of New Mexico\n\nSTART TIME: Thursday, June 1, 2006, 12:49 PM (1249)\nEND TIME: Thursday, June 1, 2006, 2:05 PM (1405)\nDESCRIPTION:During the above time frame, NLR Layer 3 Engineers will be performing software maintenance on the LOSA-CRS. Outage is only expected to be 20 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6072&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071126T050001Z SUMMARY: 7341 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20071126T080001Z DESCRIPTION:TICKET NUMBER: 7341\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Monday, November 26, 2007, 5:31 AM (0531)\nEND TIME: Monday, November 26, 2007, 5:35 AM (0535)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Jacksonville, FL. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7341&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060808T060001Z SUMMARY: 6222 NLR Layer 3 Backbone Circuits Spanning ALBU-DENV and DENV-LOSA Maintenance Completed DTEND:20060808T120001Z DESCRIPTION:TICKET NUMBER: 6222\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-LOSA-10GE-90\nNLR-ALBU-DENV-10GE-95\n\nSCHEDULED START TIME: Tuesday, August 8, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, August 8, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 Engineers will be upgrading the 15454s along this path to software version 7.0.1. No traffic interruption is expected, however outages are possible.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6222&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060804T110001Z SUMMARY: 6225 NLR Layer 3 Member PSC Emergency Maintenance Completed DTEND:20060804T140001Z DESCRIPTION:TICKET NUMBER: 6225\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-PITT-WASH-10GE-66\n\nSTART TIME: Friday, August 4, 2006, 11:39 AM (1139)\nEND TIME: Friday, August 4, 2006, 2:14 PM (1414)\nDESCRIPTION:NLR Member PSC performed emergency maintenance on their DWDM metro connections. There were outages; however their NLR traffic re-routed.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6225&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060808T040001Z SUMMARY: 6224 NLR Layer 3 Backbone Circuit CHIC-WASH and NEWY-CHIC Maintenance Completed DTEND:20060808T060001Z DESCRIPTION:TICKET NUMBER: 6224\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, August 8, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, August 8, 2006, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 engineering and Level 3 technicians performed maintenance at the Level(3) facility in Dexter, MI to replace a faulty ORP-ELH-1 card. No outage was detected.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6224&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060524T050001Z SUMMARY: 6043 Layer 3 Peer CA*net 4 Winnipeg Maintenance DTEND:20060524T110001Z DESCRIPTION:TICKET NUMBER: 6043\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSTART TIME: Wednesday, May 24, 2006, 5:16 AM (0516)\nEND TIME: Wednesday, May 24, 2006, 5:32 AM (0532)\nDESCRIPTION:Member CA*net will rolling their fiber to a new location because of construction being done in the area. Multiple 15 minute outages are expected. All L3 traffic will be re-routed and all lightpaths will be unavailable during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6043&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060616T040001Z SUMMARY: 6080 NLR Layer 3 Backbone Circuit CHIC-WASH and NEWY-CHIC Maintenance DTEND:20060616T100001Z DESCRIPTION:TICKET NUMBER: 6080\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSCHEDULED START TIME: Friday, June 16, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, June 16, 2006, 10:00 AM (1000)\nDESCRIPTION:Level(3) to perform circuit maintenance on fibers 69 and 70 on the CHIC-CLEV route.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6080&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060614T040001Z SUMMARY: 6082 NLR Layer 3 Backbone Circuit CHIC-WASH and NEWY-CHIC Maintenance DTEND:20060614T060001Z DESCRIPTION:TICKET NUMBER: 6082\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\n\nSTART TIME: Wednesday, June 14, 2006, 4:20 AM (0420)\nEND TIME: Wednesday, June 14, 2006, 5:00 AM (0500)\nDESCRIPTION:Layer1 with assistance of level3 to perform hadware maintenance\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6082&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060607T040001Z SUMMARY: 6084 NLR Layer 3 Backbone Circuit DENV-CHIC and CHIC-HOUS Maintenance DTEND:20060607T060001Z DESCRIPTION:TICKET NUMBER: 6084\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\n\n\nSTART TIME: Tuesday, June 20, 2006, 5:44 AM (0544)\nEND TIME: Tuesday, June 20, 2006, 5:59 AM (0559)\nDESCRIPTION:NLR eneineers woth the assistance of Level3 will perform hardware maintenance.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6084&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060620T110001Z SUMMARY: 6085 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance DTEND:20060620T130001Z DESCRIPTION:TICKET NUMBER: 6085\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSCHEDULED START TIME: Tuesday, June 20, 2006, 11:00 AM (1100)\nSCHEDULED END TIME: Tuesday, June 20, 2006, 1:00 PM (1300)\nDESCRIPTION:Layer1 with the assistance of Level3 replaced an ORP ELH card in Ontario, OR. No outage was detected during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6085&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060615T050001Z SUMMARY: 6094 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance/Outage DTEND:20060615T060001Z DESCRIPTION:TICKET NUMBER: 6094\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSTART TIME: Thursday, June 15, 2006, 5:00 AM (0500)\nEND TIME: Thursday, June 15, 2006, 4:57 PM (1657)\nDESCRIPTION:Layer1 engineers to perform circuit maintenance.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6094&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060607T060001Z SUMMARY: 6087 NLR Layer 3 Backbone Circuits Spanning LOSA-SEAT Maintenance DTEND:20060607T120001Z DESCRIPTION:TICKET NUMBER: 6087\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\nNLR-LOSA-SEAT-10GE-113\nNLR-LOSA-SEAT-10GE-115\n\nSCHEDULED START TIME: Wednesday, June 7, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Wednesday, June 7, 2006, 12:00 PM (1200)\nDESCRIPTION:A local vendor in Suisun City, CA will be performing a hot cut to resplice fibers. An outage of up to 1 hour is expected, however the whole maintenance window will be reserved.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6087&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060614T080001Z SUMMARY: 6088 NLR Layer 3 Backbone Circuit DENV-CHIC and CHIC-HOUS Maintenance DTEND:20060614T100001Z DESCRIPTION:TICKET NUMBER: 6088\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSTART TIME: Wednesday, June 14, 2006, 8:02 AM (0802)\nEND TIME: Wednesday, June 14, 2006, 8:28 AM (0828)\nDESCRIPTION:layer1 with the assistance of level3 will perform hardware maintenance\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6088&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060608T060001Z SUMMARY: 6089 NLR PORT-SUNN Route Maintenance Complete DTEND:20060608T080001Z DESCRIPTION:TICKET NUMBER: 6089\nMAINTENANCE TYPE: Circuit\nAFFECTED: Backbone Circuit LOSA-SEAT\n\nSCHEDULED START TIME: Thursday, June 8, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, June 8, 2006, 8:00 AM (0800)\nDESCRIPTION:A local vendor in Suisun City, CA performed a hot cut to resplice fibers. An outage of up to 1 hour is expected, however, no outage detected.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6089&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060628T050001Z SUMMARY: 6092 NLR Layer 3 Backbone Circuit DENV-CHIC and DENV-HOUS Maintenance Completed DTEND:20060628T070001Z DESCRIPTION:TICKET NUMBER: 6092\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSTART TIME: Wednesday, June 28, 2006, 5:00 AM (0500)\nEND TIME: Wednesday, June 28, 2006, 5:15 AM (0515)\nDESCRIPTION:Layer1 with the assistance of Level3 will replace an ORP ELH card in Lancaster, KS. An outage of up to the entire maintenance window is possible during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6092&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060612T010001Z SUMMARY: 6093 NLR Layer 3 Router WASH Maintenance DTEND:20060612T020001Z DESCRIPTION:TICKET NUMBER: 6093\nMAINTENANCE TYPE: Software\nAFFECTED: \nSTART TIME: Monday, June 12, 2006, 1:34 AM (0134)\nEND TIME: Monday, June 12, 2006, 1:52 AM (0152)\nDESCRIPTION:Layer3 engineers will perform a code upgrade on the WASH CRS\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6093&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060627T110001Z SUMMARY: 6098 NLR Layer 3 Backbone Circuits Spanning LOSA-SEAT Maintenance DTEND:20060627T130001Z DESCRIPTION:TICKET NUMBER: 6098\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-49\nNLR-LOSA-SEAT-10GE-113\nNLR-LOSA-SEAT-10GE-115\n\nSTART TIME: Tuesday, June 27, 2006, 11:12 AM (1112)\nEND TIME: Tuesday, June 27, 2006, 11:43 AM (1143)\nDESCRIPTION:Level 3 Technicians will be replacing an OA-ELH-OR card in Portland, OR. A brief outage is possible during this maintenance, however the whole maintenance window is reserved. Maintenance completed. Closing.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6098&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060712T100001Z SUMMARY: 6099 NLR Layer 3 Backbone Circuits Spanning PORT-SUNN Maintenance Completed DTEND:20060712T120001Z DESCRIPTION:TICKET NUMBER: 6099\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-113\nNLR-LOSA-SEAT-10GE-115\nNLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 12, 2006, 10:47 AM (1047)\nEND TIME: Wednesday, July 12, 2006, 11:41 AM (1141)\nDESCRIPTION:*Please note rescheduled maintenance window* Level3 Technicians will be replacing an OECP card in Sunnyvale, CA. This maintenance is expected to be service impacting.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6099&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060705T110001Z SUMMARY: 6100 Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060705T130001Z DESCRIPTION:TICKET NUMBER: 6100\nMAINTENANCE TYPE: Hardware\nAFFECTED: Layer 3 Backbone Circuit DENV-SEAT\n\nSCHEDULED START TIME: Wednesday, July 5, 2006, 11:00 AM (1100)\nSCHEDULED END TIME: Wednesday, July 5, 2006, 1:00 PM (1300)\nDESCRIPTION:Level 3 Technicians will be replacing an OSCM card in North Bend, WA. An outage of up to the entire maintenance window is possible during this maintenance. No Outage detected.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6100&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060615T050001Z SUMMARY: 6101 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance DTEND:20060615T110001Z DESCRIPTION:TICKET NUMBER: 6101\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Thursday, June 15, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, June 15, 2006, 11:00 AM (1100)\nDESCRIPTION:During the above time frame, NLR Layer 1 engineering will be upgrading the Cisco 15454s along this path to software version 7.0.1.\nTIMESTAMP: Sat Nov 7 11:03:02 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6101&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060621T120001Z SUMMARY: 6102 NLR Layer 3 Member UCAR Maintenance DTEND:20060621T130001Z DESCRIPTION:TICKET NUMBER: 6102\nMAINTENANCE TYPE: Software\nAFFECTED: \nSTART TIME: Wednesday, June 21, 2006, 12:01 PM (1201)\nEND TIME: Wednesday, June 21, 2006, 12:06 PM (1206)\nDESCRIPTION:NLR Layer 3 Member UCAR will be converting their 6509 to Native IOS in an effort to resolve a BGP issue they are having. The BGP connection of Member UCAR will be down during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6102&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060621T110001Z SUMMARY: 6108 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance DTEND:20060621T120001Z DESCRIPTION:TICKET NUMBER: 6108\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, June 21, 2006, 12:02 PM (1202)\nEND TIME: Wednesday, June 21, 2006, 12:05 PM (1205)\nDESCRIPTION:During the above time frame, NLR engineers will perform maintenance on the DENV-SEAT Backbone Circuit.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6108&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060619T050001Z SUMMARY: 6110 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance DTEND:20060619T110001Z DESCRIPTION:TICKET NUMBER: 6110\nMAINTENANCE TYPE: Software\nAFFECTED: \nSTART TIME: Monday, June 19, 2006, 2:51 AM (0251)\nEND TIME: Monday, June 19, 2006, 5:11 AM (0511)\nDESCRIPTION:layer 1 Engineers will be upgrading the Cisco 15454s along this path to software version 7.0.1.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6110&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060705T070001Z SUMMARY: 6111 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060705T090001Z DESCRIPTION:TICKET NUMBER: 6111\nMAINTENANCE TYPE: Hardware\nAFFECTED: Backbone Circuit DENV-SEAT\n\nSTART TIME: Wednesday, July 5, 2006, 8:10 AM (0810)\nEND TIME: Wednesday, July 5, 2006, 8:21 AM (0821)\nDESCRIPTION:NLR Layer 1 engineering and Level 3 technicians performed maintenance at the Level(3) facility in Ogden, UT to replace a faulty ORP-ELH card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6111&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060620T040101Z SUMMARY: 6113 NLR Layer 3 Member NCLR Maintenance/Routing Changes DTEND:20060620T060001Z DESCRIPTION:TICKET NUMBER: 6113\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSCHEDULED START TIME: Tuesday, June 20, 2006, 4:01 AM (0401)\nSCHEDULED END TIME: Tuesday, June 20, 2006, 6:00 AM (0600)\nDESCRIPTION:Monitoring issue seems to be gone, this can be closed\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6113&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060622T010001Z SUMMARY: 6114 NLR Layer 3 Backbone Circuits DENV-CHIC and DENV-HOUS Maintenance DTEND:20060622T030001Z DESCRIPTION:TICKET NUMBER: 6114\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Thursday, June 22, 2006, 1:21 AM (0121)\nEND TIME: Thursday, June 22, 2006, 1:26 AM (0126)\nDESCRIPTION:Level 3 technicians will be replacing an ORP-ELH-2 card that is failing in Haigler, NE. Outages are expected during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6114&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060623T080001Z SUMMARY: 6118 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance DTEND:20060623T100001Z DESCRIPTION:TICKET NUMBER: 6118\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Friday, June 23, 2006, 7:14 AM (0714)\nEND TIME: Friday, June 23, 2006, 7:19 AM (0719)\nDESCRIPTION:During the above time, Level (3)Technicians and layer1 engineers will be performing maintenance on the above circuit to troubleshoot circuit errors.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6118&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060623T120001Z SUMMARY: 6121 NLR Layer 3 Peer TransPAC2 Emergency Maintenance DTEND:20060623T130001Z DESCRIPTION:TICKET NUMBER: 6121\nMAINTENANCE TYPE: Software\nAFFECTED: \nSTART TIME: Friday, June 23, 2006, 12:48 PM (1248)\nEND TIME: Friday, June 23, 2006, 12:52 PM (1252)\nDESCRIPTION:NLR Layer 3 Peer TransPAC2 will be performing software maintenance on their router. An outage of 10 minutes is expected; however, the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6121&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060712T040001Z SUMMARY: 6124 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20060712T060001Z DESCRIPTION:TICKET NUMBER: 6124\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Wednesday, July 12, 2006, 4:09 AM (0409)\nEND TIME: Wednesday, July 12, 2006, 4:11 AM (0411)\nDESCRIPTION:During the above time frame, NLR Layer 1 engineering and Level 3 technicians will be performing maintenance at the Level(3) facility in Folkston, Georgia to replace a faulty OBA-LH card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6124&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060718T040001Z SUMMARY: 6125 NLR Layer 3 Backbone Circuits Spanning CHIC-WASH and CHIC-NEWY Maintenance Completed DTEND:20060718T060001Z DESCRIPTION:TICKET NUMBER: 6125\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, July 18, 2006, 4:18 AM (0418)\nEND TIME: Tuesday, July 18, 2006, 4:23 AM (0423)\nDESCRIPTION:NLR Layer 1 engineering and Level 3 technicians replaced an OA-ELH card in Akron, OH. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6125&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060629T080001Z SUMMARY: 6126 NLR Layer 3 Backbone Circuits Spanning ELPA-LOSA Maintenance Completed DTEND:20060629T100001Z DESCRIPTION:TICKET NUMBER: 6126\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSCHEDULED START TIME: Thursday, June 29, 2006, 8:00 AM (0800)\nSCHEDULED END TIME: Thursday, June 29, 2006, 10:00 AM (1000)\nDESCRIPTION:Level3 technicians will be replacing a defective card in the 15454 in Phoenix, AZ. Outages are expected, however, traffic will re-route during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6126&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060627T230001Z SUMMARY: 6127 NLR Layer 3 Member OneNet Maintenance DTEND:20060628T030001Z DESCRIPTION:TICKET NUMBER: 6127\nMAINTENANCE TYPE: Circuit\nAFFECTED: OneNet\n\nSTART TIME: Tuesday, June 27, 2006, 11:07 PM (2307)\nEND TIME: Tuesday, June 27, 2006, 11:13 PM (2313)\nDESCRIPTION:Member OneNet will be testing their connections to verify fiber handoff to Level 3. An outage of between 10-20 minutes is expected on each of their links to NLR.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6127&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060629T040101Z SUMMARY: 6128 NLR Layer 3 Member NCLR Maintenance Completed DTEND:20060629T050001Z DESCRIPTION:TICKET NUMBER: 6128\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member NCLR\n\nSTART TIME: Thursday, June 29, 2006, 4:04 AM (0404)\nEND TIME: Thursday, June 29, 2006, 4:04 AM (0404)\nDESCRIPTION:NLR Member NCLR will be replacing a XENPAK in Raleigh, NC. No outage is expected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6128&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060705T200001Z SUMMARY: 6129 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20060705T220001Z DESCRIPTION:TICKET NUMBER: 6129\nMAINTENANCE TYPE: Hardware\nAFFECTED: Layer 3 Backbone Circuit ATLA-HOUS\n\nSCHEDULED START TIME: Wednesday, July 5, 2006, 8:00 PM (2000)\nSCHEDULED END TIME: Wednesday, July 5, 2006, 10:00 PM (2200)\nDESCRIPTION:Level3 Technicians replaced a TCC2 card in Pensacola, FL. This maintenance was non-service impacting.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6129&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060808T080001Z SUMMARY: 6130 NLR Layer 3 Backbone Circuits DENV-CHIC and DENV-HOUS Maintenance Completed DTEND:20060808T100001Z DESCRIPTION:TICKET NUMBER: 6130\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, August 8, 2006, 8:07 AM (0807)\nEND TIME: Tuesday, August 8, 2006, 8:14 AM (0814)\nDESCRIPTION:NLR Engineers working with Level3 Technicians replaced an unequipped BCS-ELH card and CMP card in Heartwell, NE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6130&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060627T060001Z SUMMARY: 6132 NLR Layer 3 Peer Ultralight Maintenance Completed DTEND:20060627T164501Z DESCRIPTION:TICKET NUMBER: 6132\nMAINTENANCE TYPE: Software\nAFFECTED: Ultralight\n\nSTART TIME: Tuesday, June 27, 2006, 6:06 AM (0606)\nEND TIME: Tuesday, June 27, 2006, 4:42 PM (1642)\nDESCRIPTION:NLR Layer 3 Peer Ultralight will be performing software maintenance on their switch in Los Angeles. Peer Ultralight reports maintenance was extended because of faulty hardware that was replaced and service has since been restored.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6132&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060629T040001Z SUMMARY: 6134 NLR Layer 3 Backbone Circuits CHIC-WASH and NEWY-CHIC Maintenance Completed DTEND:20060629T100001Z DESCRIPTION:TICKET NUMBER: 6134\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Thursday, June 29, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, June 29, 2006, 10:00 AM (1000)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outage was detected\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6134&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060629T050001Z SUMMARY: 6135 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20060629T110001Z DESCRIPTION:TICKET NUMBER: 6135\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Thursday, June 29, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, June 29, 2006, 11:00 AM (1100)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outage was detected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6135&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060711T090001Z SUMMARY: 6138 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060711T110001Z DESCRIPTION:TICKET NUMBER: 6138\nMAINTENANCE TYPE: Hardware\nAFFECTED: Layer 3 Backbone Circuit DENV-SEAT\n\nSTART TIME: Tuesday, July 11, 2006, 9:07 AM (0907)\nEND TIME: Tuesday, July 11, 2006, 9:12 AM (0912)\nDESCRIPTION:NLR Layer 1 Engineering worked with Level3 technicians to replace an OA-ELH card in Cle Elum, WA. A brief outage happened during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6138&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060629T050001Z SUMMARY: 6139 NLR Layer 3 Backbone Circuit DENV-HOUS Maintenance Completed DTEND:20060629T110001Z DESCRIPTION:TICKET NUMBER: 6139\nMAINTENANCE TYPE: Software\nAFFECTED: Layer 3 Backbone Circuit DENV-HOUS\n\nSCHEDULED START TIME: Thursday, June 29, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, June 29, 2006, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 Engineering upgraded the Cisco 14545s along this path to software version 7.0.1. No outage was detected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6139&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060710T040001Z SUMMARY: 6141 NLR Layer 3 Backbone Circuits CHIC-WASH and CHIC-NEWY Maintenance Completed DTEND:20060710T070001Z DESCRIPTION:TICKET NUMBER: 6141\nMAINTENANCE TYPE: Hardware\nAFFECTED: Layer 3 Backbone Circuit CHIC-WASH\nLayer 3 Backbone Circuit CHIC-NEWY\n\nSTART TIME: Monday, July 10, 2006, 4:15 AM (0415)\nEND TIME: Monday, July 10, 2006, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 Engineers worked with Level3 Technicians to replace an OA-ELH card in Dexter, MI. Outages were expected during this maintenance. Maintenance has been completeded.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6141&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060708T030001Z SUMMARY: 6144 NLR Layer 3 Backbone Circuit NEWY-WASH Maintenance Completed DTEND:20060708T110001Z DESCRIPTION:TICKET NUMBER: 6144\nMAINTENANCE TYPE: Circuit\nAFFECTED: Backbone Circuit NEWY-WASH\n\nSCHEDULED START TIME: Saturday, July 8, 2006, 3:00 AM (0300)\nSCHEDULED END TIME: Saturday, July 8, 2006, 11:00 AM (1100)\nDESCRIPTION:A Level (3) Off-network carrier performed an emergency fiber optic cable repair. Maintenance will take place over multiple nights. Expected impact is up to a 2 hour outage. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6144&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060709T030001Z SUMMARY: 6145 NLR Layer 3 Backbone Circuit NEWY-WASH Maintenance Completed DTEND:20060709T110001Z DESCRIPTION:TICKET NUMBER: 6145\nMAINTENANCE TYPE: Circuit\nAFFECTED: Backbone Circuit NEWY-WASH\n\nSCHEDULED START TIME: Sunday, July 9, 2006, 3:00 AM (0300)\nSCHEDULED END TIME: Sunday, July 9, 2006, 11:00 AM (1100)\nDESCRIPTION:A Level (3) Off-network carrier was be performing an emergency fiber optic cable repair. Maintenance window is for second day of maintenance 6144:77, if needed. No outage detected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6145&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060706T023001Z SUMMARY: 6147 NLR Layer 3 Backbone Circuits Spanning CHIC-HOUS Maintenance Completed DTEND:20060706T053001Z DESCRIPTION:TICKET NUMBER: 6147\nMAINTENANCE TYPE: Power\nAFFECTED: Layer 3 Backbone Circuits Spanning CHIC-HOUS\n\nSCHEDULED START TIME: Thursday, July 6, 2006, 2:30 AM (0230)\nSCHEDULED END TIME: Thursday, July 6, 2006, 5:30 AM (0530)\nDESCRIPTION:NLR Layer 1 Engineering was running power provisioning across Routes Spanning JACK-PITT to support Cisco Research Wave transponder installations. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6147&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060708T070001Z SUMMARY: 6148 NLR Layer 3 Backbone Circuits Spanning LOSA-DENV Maintenance Completed DTEND:20060708T080001Z DESCRIPTION:TICKET NUMBER: 6148\nMAINTENANCE TYPE: Power\nAFFECTED: Backbone Circuits Spanning LOSA-DENV\n\nSCHEDULED START TIME: Saturday, July 8, 2006, 7:00 AM (0700)\nSCHEDULED END TIME: Saturday, July 8, 2006, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 Engineering ran power provisioning across the SUNN-BOIS spans to support Cisco Research Wave transponder installations. The maintenance was on-service impacting. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6148&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060706T040001Z SUMMARY: 6151 NLR Layer 3 Backbone Circuit CHIC-WASH and PITT-WASH Maintenance Completed DTEND:20060706T100001Z DESCRIPTION:TICKET NUMBER: 6151\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSCHEDULED START TIME: Thursday, July 6, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, July 6, 2006, 10:00 AM (1000)\nDESCRIPTION:Layer 1 engineering was upgrading the Cisco 15454s on this path to software version 7.0.1. No outages were detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6151&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060706T040001Z SUMMARY: 6152 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060706T100001Z DESCRIPTION:TICKET NUMBER: 6152\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Thursday, July 6, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, July 6, 2006, 10:00 AM (1000)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outages were detected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6152&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060706T040001Z SUMMARY: 6153 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060706T100001Z DESCRIPTION:TICKET NUMBER: 6153\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Thursday, July 6, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, July 6, 2006, 10:00 AM (1000)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outages were detected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6153&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060801T110001Z SUMMARY: 6155 NLR Layer 3 Backbone Circuits LOSA-SEAT Maintenance Complete DTEND:20060801T130001Z DESCRIPTION:TICKET NUMBER: 6155\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, August 1, 2006, 12:15 PM (1215)\nEND TIME: Tuesday, August 1, 2006, 12:48 PM (1248)\nDESCRIPTION:NLR Layer1 Engineers working with Level3 Technicians will replace an OP_ELH card in Palo Cedro, CA. An outage is expected during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6155&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060706T050001Z SUMMARY: 6156 NLR Layer 3 Backbone Circuit CHIC-STAR Maintenance Completed DTEND:20060706T110001Z DESCRIPTION:TICKET NUMBER: 6156\nMAINTENANCE TYPE: Software\nAFFECTED: Layer 3 Backbone Circuit CHIC-STAR\n\nSCHEDULED START TIME: Thursday, July 6, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, July 6, 2006, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 Engineering was upgrading the Cisco 14545s on this path to software version 7.0.1. No outage was detected. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6156&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060712T040001Z SUMMARY: 6159 NLR Layer 3 Routes Circuits Spanning LOSA-SEAT Maintenance Completed DTEND:20060712T100001Z DESCRIPTION:TICKET NUMBER: 6159\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-LOSA-SEAT-10GE-113\nNLR-LOSA-SEAT-10GE-115\n\nSCHEDULED START TIME: Wednesday, July 12, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Wednesday, July 12, 2006, 10:00 AM (1000)\nDESCRIPTION:Layer 1 Engineering will be upgrading the Cisco 15454s along this path to software version 7.0.1. No traffic interruption is expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6159&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060713T060001Z SUMMARY: 6160 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20060713T120001Z DESCRIPTION:TICKET NUMBER: 6160\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuit DENV-LOSA\n\nSCHEDULED START TIME: Thursday, July 13, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, July 13, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 Engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No traffic interruption was experienced.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6160&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060711T060001Z SUMMARY: 6161 NLR Layer 3 Backbone Circuits Spanning HOUS-DENV Maintenance Completed DTEND:20060711T120001Z DESCRIPTION:TICKET NUMBER: 6161\nMAINTENANCE TYPE: Software\nAFFECTED: Backbone Circuits Spanning HOUS-DENV\n\nSCHEDULED START TIME: Tuesday, July 11, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, July 11, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 Engineers upgraded most of the Cisco 15454s along this path to software version 7.0.1. The 15454 in Silver City, NM will be upgraded at a later time. No outages were detected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6161&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060711T070001Z SUMMARY: 6162 NLR Layer 3 Backbone Circuit Spanning HOUS-DENV Maintenance Completed DTEND:20060711T130001Z DESCRIPTION:TICKET NUMBER: 6162\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuit Spanning HOUS-DENV\n\nSCHEDULED START TIME: Tuesday, July 11, 2006, 7:00 AM (0700)\nSCHEDULED END TIME: Tuesday, July 11, 2006, 1:00 PM (1300)\nDESCRIPTION:Layer 1 engineering will be upgrading the Cisco 15454s along this path to software version 7.0.1. No traffic interruption is expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6162&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060713T050001Z SUMMARY: 6163 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20060713T110001Z DESCRIPTION:TICKET NUMBER: 6163\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuit HOUS-LOSA\n\nSCHEDULED START TIME: Thursday, July 13, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, July 13, 2006, 11:00 AM (1100)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No traffic interruption was experienced.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6163&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060718T050001Z SUMMARY: 6164 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Complete DTEND:20060718T120001Z DESCRIPTION:TICKET NUMBER: 6164\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuit HOUS-LOSA\n\nSCHEDULED START TIME: Tuesday, July 18, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, July 18, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. There was no interruption to traffic.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6164&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060718T050001Z SUMMARY: 6165 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Complete DTEND:20060718T120001Z DESCRIPTION:TICKET NUMBER: 6165\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuit ATLA-HOUS\n\nSCHEDULED START TIME: Tuesday, July 18, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, July 18, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. There was no interruption to traffic.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6165&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060717T120001Z SUMMARY: 6166 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance DTEND:20060717T200001Z DESCRIPTION:TICKET NUMBER: 6166\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR Layer 3 Backbone Circuit ATLA-HOUS\n\nSCHEDULED START TIME: Monday, July 17, 2006, 12:00 PM (1200)\nSCHEDULED END TIME: Monday, July 17, 2006, 8:00 PM (2000)\nDESCRIPTION:NLR Layer 1 Engineering will be installing DWDM hardware in Jacksonville, FL to support additional circuit deployments. No Interruption Expected.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6166&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060720T060001Z SUMMARY: 6168 NLR Layer 3 Backbone Circuits Spanning DENV-LOSA Maintenance Completed DTEND:20060720T120001Z DESCRIPTION:TICKET NUMBER: 6168\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuits Spanning DENV-LOSA\n\nSCHEDULED START TIME: Thursday, July 20, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, July 20, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6168&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060720T060001Z SUMMARY: 6167 NLR Layer 3 Backbone Circuits Spanning DENV-LOSA Maintenance Completed DTEND:20060720T120001Z DESCRIPTION:TICKET NUMBER: 6167\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuits Spanning DENV-LOSA\n\nSCHEDULED START TIME: Thursday, July 20, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, July 20, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 Engineering upgraded the Cisco 15454s along this path to software version 7.0.1. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6167&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060713T170001Z SUMMARY: 6169 NLR Layer 3 Backbone Circuits CHIC-HOUS and DENV-HOUS Maintenance Completed DTEND:20060714T010001Z DESCRIPTION:TICKET NUMBER: 6169\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR Layer 3 Backbone Circuits CHIC-HOUS and DENV-HOUS\n\nSCHEDULED START TIME: Thursday, July 13, 2006, 5:00 PM (1700)\nSCHEDULED END TIME: Friday, July 14, 2006, 1:00 AM (0100)\nDESCRIPTION:NLR Layer 1 Engineering installed hardware in Dallas, TX to support additional circuit deployments. No Interruptions were experienced.\nTIMESTAMP: Sat Nov 7 11:03:03 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6169&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060713T130001Z SUMMARY: 6170 NLR Layer 3 Backbone Circuits NEWY-CHIC and NEWY-WASH Maintenance Complete DTEND:20060713T210001Z DESCRIPTION:TICKET NUMBER: 6170\nMAINTENANCE TYPE: Circuit\nAFFECTED: Layer 3 Backbone Circuit NEWY-CHIC\nLayer 3 Backbone Circuit NEWY-WASH\n\nSCHEDULED START TIME: Thursday, July 13, 2006, 1:00 PM (1300)\nSCHEDULED END TIME: Thursday, July 13, 2006, 9:00 PM (2100)\nDESCRIPTION:NLR Layer 1 Engineers worked with Level3 technicans to install hardware to support additional circuit deployments. There was no service impact. \nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6170&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071107T050001Z SUMMARY: 7311 NLR Layer 3 Backbone Circuit CHIC-WASH Emergency Maintenance Cancelled DTEND:20071107T110001Z DESCRIPTION:TICKET NUMBER: 7311\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSCHEDULED START TIME: Wednesday, November 7, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, November 7, 2007, 11:00 AM (1100)\nDESCRIPTION:Due to internal miscommunication, NLR's fiber provider has announced emergency circuit maintenance will be taking place in Pittsburgh, PA. A two (2) hour outage is expected; however, the entire maintenance window is reserved. ***Per Level(3) Communications, this maintenance has just been cancelled. We apologize for any inconvenience***\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7311&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060711T070001Z SUMMARY: 6175 NLR Layer 3 Backbone Circuits LOSA-SEAT Maintenance Completed DTEND:20060711T130001Z DESCRIPTION:TICKET NUMBER: 6175\nMAINTENANCE TYPE: Circuit\nAFFECTED: Layer 3 Backbone Circuit LOSA-SEAT \nLayer 3 Backbone Circuit LOSA-SEAT \nLayer 3 Backbone Circuit LOSA-SEAT\n\nSTART TIME: Tuesday, July 11, 2006, 10:07 AM (1007)\nEND TIME: Tuesday, July 11, 2006, 12:54 PM (1254)\nDESCRIPTION:NLR Layer 3 Backbone Circuits LOSA-SEAT experience a loss of connectivity as circuit circuit maintenance was being performed in San Luis Obispo, CA. An outage of up to the entire maintenance window was possible during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6175&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060725T060001Z SUMMARY: 6177 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060725T080001Z DESCRIPTION:TICKET NUMBER: 6177\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Tuesday, July 25, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, July 25, 2006, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1engineering and Level 3 technicians performed maintenance at the Level(3) facility in Reverse, ID to replace a faulty OP-ELH card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6177&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060712T120001Z SUMMARY: 6178 NLR Layer 3 Backbone Circuits Spanning LOSA-SEAT Maintenance Completed DTEND:20060712T130001Z DESCRIPTION:TICKET NUMBER: 6178\nMAINTENANCE TYPE: Software\nAFFECTED: Layer 3 Backbone Circuit LOSA-SEAT (49)\nLayer 3 Backbone Circuit LOSA-SEAT (113)\nLayer 3 Backbone Circuit LOSA-SEAT (115)\n\nSCHEDULED START TIME: Wednesday, July 12, 2006, 12:00 PM (1200)\nSCHEDULED END TIME: Wednesday, July 12, 2006, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 Engineering will be running power provisioning across the SUNN-LOSA path to support CRW transponder installations. This maintenance isn't expected to be service impacting.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6178&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060715T020001Z SUMMARY: 6179 NLR Layer 3 Backbone Circuits Spanning LOSA-SEAT Maintenance Update DTEND:20060715T050001Z DESCRIPTION:TICKET NUMBER: 6179\nMAINTENANCE TYPE: Power\nAFFECTED: Layer 3 Backbone Circuit LOSA-SEAT\nLayer 3 Backbone Circuit LOSA-SEAT\nLayer 3 Backbone Circuit LOSA-SEAT\n\nSCHEDULED START TIME: Saturday, July 15, 2006, 2:00 AM (0200)\nSCHEDULED END TIME: Saturday, July 15, 2006, 5:00 AM (0500)\nDESCRIPTION:This maintenance will be re-scheduled due to hardware issues experienced in Sacramento.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6179&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060717T050001Z SUMMARY: 6180 NLR Layer 3 Backbone Circuit STAR-CHIC Maintenance Completed DTEND:20060717T070001Z DESCRIPTION:TICKET NUMBER: 6180\nMAINTENANCE TYPE: Software\nAFFECTED: Layer 3 Backbone Circuit STAR-CHIC\n\nSCHEDULED START TIME: Monday, July 17, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Monday, July 17, 2006, 7:00 AM (0700)\nDESCRIPTION:Layer 1 engineering upgraded the Canal Cisco 15454 to software version 7.0.1. No traffic interruption was experienced.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6180&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060714T040001Z SUMMARY: 6183 NLR Layer 3 Backbone Circuits DENV-LOSA and HOUS-LOSA Maintenance Completed DTEND:20060714T080001Z DESCRIPTION:TICKET NUMBER: 6183\nMAINTENANCE TYPE: Hardware\nAFFECTED: Layer 3 Backbone Circuit DENV-LOSA\nLayer 3 Backbone Circuit HOUS-LOSA\n\nSCHEDULED START TIME: Friday, July 14, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, July 14, 2006, 8:00 AM (0800)\nDESCRIPTION:Layer1 Engineers were installing hardware to support future circuit installations. No interruption was experienced during the maintenance.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6183&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060719T120001Z SUMMARY: 6185 NLR Layer 3 Backbone Cirsuits Spanning ATLA-NEWY Maintenance DTEND:20060719T200001Z DESCRIPTION:TICKET NUMBER: 6185\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\nNLR-NEWY-WASH-10GE-98\n\nSCHEDULED START TIME: Wednesday, July 19, 2006, 12:00 PM (1200)\nSCHEDULED END TIME: Wednesday, July 19, 2006, 8:00 PM (2000)\nDESCRIPTION:NLR Layer 1 Engineering will be installing DWDM hardware in Washington, DC to support additional circuit deployments. No Interruption is Expected.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6185&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060725T100001Z SUMMARY: 6187 NLR Layer 3 Backbone Circuits DENV-CHIC and DENV-HOUS Maintenance Completed DTEND:20060725T130001Z DESCRIPTION:TICKET NUMBER: 6187\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36 NLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, July 25, 2006, 11:00 AM (1100)\nEND TIME: Tuesday, July 25, 2006, 11:07 AM (1107)\nDESCRIPTION:NLR Layer 1 Engineering will be working with remote hands to replace a card in Otis, Colorado. Loss of service is expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6187&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060802T040001Z SUMMARY: 6188 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060802T060001Z DESCRIPTION:TICKET NUMBER: 6188\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, August 2, 2006, 5:05 AM (0505)\nEND TIME: Wednesday, August 2, 2006, 5:48 AM (0548)\nDESCRIPTION:Level 3 technicians replaced an ORP-ELH-2 card that was failing in Greensboro, NC.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6188&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060726T040001Z SUMMARY: 6189 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Complete DTEND:20060726T110001Z DESCRIPTION:TICKET NUMBER: 6189\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, July 26, 2006, 5:41 AM (0541)\nEND TIME: Wednesday, July 26, 2006, 5:42 AM (0542)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. An outage of less than a minute occurred.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6189&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060727T060001Z SUMMARY: 6190 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Complete DTEND:20060727T120001Z DESCRIPTION:TICKET NUMBER: 6190\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Thursday, July 27, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, July 27, 2006, 12:00 PM (1200)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outage occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6190&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060728T050001Z SUMMARY: 6191 NLR Layer 3 Backbone Circuit CHIC-HOUS and DENV-HOUS Maintenance Completed DTEND:20060728T110001Z DESCRIPTION:TICKET NUMBER: 6191\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Friday, July 28, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, July 28, 2006, 11:00 AM (1100)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outage happened.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6191&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060726T040001Z SUMMARY: 6192 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Complete DTEND:20060726T110001Z DESCRIPTION:TICKET NUMBER: 6192\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Wednesday, July 26, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Wednesday, July 26, 2006, 11:00 AM (1100)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No traffic interruption occurred.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6192&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060728T050001Z SUMMARY: 6193 NLR Layer 3 Backbone Circuits CHIC-HOUS and DENV-HOUS Maintenance Completed DTEND:20060728T110001Z DESCRIPTION:TICKET NUMBER: 6193\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Friday, July 28, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, July 28, 2006, 11:00 AM (1100)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No traffic interruption was detected.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6193&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060728T050001Z SUMMARY: 6195 NLR Layer 3 Backbone Circuits Spanning CHIC-HOUS and DENV-HOUS Maintenance Completed DTEND:20060728T110001Z DESCRIPTION:TICKET NUMBER: 6195\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Friday, July 28, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, July 28, 2006, 11:00 AM (1100)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No traffic interruption was detected.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6195&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060727T040001Z SUMMARY: 6197 NLR Layer 3 Backbone Circuit NEWY-WASH Maintenance Completed DTEND:20060727T100001Z DESCRIPTION:TICKET NUMBER: 6197\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSCHEDULED START TIME: Thursday, July 27, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, July 27, 2006, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outage was detected.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6197&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060801T040001Z SUMMARY: 6196 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20060801T100001Z DESCRIPTION:TICKET NUMBER: 6196\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer 3 Backbone Circuit ATLA-HOUS\n\nSTART TIME: Tuesday, August 1, 2006, 9:10 AM (0910)\nEND TIME: Tuesday, August 1, 2006, 9:26 AM (0926)\nDESCRIPTION:Layer 1 engineering upgraded the Cisco 15454s along this path to software version 7.0.1. No outage was expected. Maintenance has been completed\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6196&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060723T110001Z SUMMARY: 6201 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20060723T130001Z DESCRIPTION:TICKET NUMBER: 6201\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Sunday, July 23, 2006, 11:36 AM (1136)\nEND TIME: Sunday, July 23, 2006, 12:58 PM (1258)\nDESCRIPTION:Layer 1 Engineers replaced an Optical Pre-Amplifier to regain monitoring capabilities. Maintenance has been completed and monitoring has been restored.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6201&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060726T070001Z SUMMARY: 6202 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Complete DTEND:20060726T130001Z DESCRIPTION:TICKET NUMBER: 6202\nMAINTENANCE TYPE: Circuit\nAFFECTED: Backbone Circuit LOSA-SEAT\n\nSTART TIME: Wednesday, July 26, 2006, 7:22 AM (0722)\nEND TIME: Wednesday, July 26, 2006, 12:55 PM (1255)\nDESCRIPTION:NLR Layer 3 Backbone Circuit LOSA-SEATexperienced a loss of connectivity as Layer 1 Engineers relocated optical fibers in San Luis Obispo, CA. An outage lasting most of the maintenance window occurred.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6202&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060724T040001Z SUMMARY: 6205 NLR Layer 3 Backbone Circuit NEWY-WASH and NEWY-CHIC Maintenance Completed DTEND:20060724T060001Z DESCRIPTION:TICKET NUMBER: 6205\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\nNLR-NEWY-WASH-10GE-98\n\nSTART TIME: Monday, July 24, 2006, 5:10 AM (0510)\nEND TIME: Monday, July 24, 2006, 6:00 AM (0600)\nDESCRIPTION:Layer1 technicians performed circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6205&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060803T050001Z SUMMARY: 6215 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20060803T100001Z DESCRIPTION:TICKET NUMBER: 6215\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Thursday, August 3, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, August 3, 2006, 10:00 AM (1000)\nDESCRIPTION:NLR L1 Engineers performed firmware upgrades on all 15808s along the ATLA-JACK route. No outage was detected.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6215&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060731T070001Z SUMMARY: 6208 NLR Layer 3 Backbone Circuit SEAT-DENV Maintenance Completed DTEND:20060731T090001Z DESCRIPTION:TICKET NUMBER: 6208\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, July 31, 2006, 7:00 AM (0700)\nEND TIME: Monday, July 31, 2006, 7:08 AM (0708)\nDESCRIPTION:NLR Layer 1 Engineers worked with Level3 Technicians to replace a ORP_ELH in Denver, CO. This maintenance was expected to be service impacting. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6208&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060727T040001Z SUMMARY: 6211 NLR Layer 3 Member NCLR Maintenance Completed DTEND:20060727T080001Z DESCRIPTION:TICKET NUMBER: 6211\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member NCLR (ATLA & WASH)\n\nSTART TIME: Thursday, July 27, 2006, 4:04 AM (0404)\nEND TIME: Thursday, July 27, 2006, 4:41 AM (0441)\nDESCRIPTION:Member NCLR performed circuit maintenance. The entire window was reserved.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6211&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060801T040001Z SUMMARY: 6220 NLR Layer 3 Backbone Circuit PITT-WASH and CHIC-WASH Maintenance Completed DTEND:20060801T060001Z DESCRIPTION:TICKET NUMBER: 6220\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-PITT-WASH-10GE-66\nNLR-CHIC-WASH-10GE-59\n\nSTART TIME: Tuesday, August 1, 2006, 4:27 AM (0427)\nEND TIME: Tuesday, August 1, 2006, 5:36 AM (0536)\nDESCRIPTION:Layer 1 engineers with the assistance of level3 replaced a OPA-C card in Fedrick, MD. Outages were expected during this maintenance window. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6220&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060805T093001Z SUMMARY: 6228 NLR Layer 3 Router CHIC Maintenance Completed DTEND:20060805T100001Z DESCRIPTION:TICKET NUMBER: 6228\nMAINTENANCE TYPE: Hardware\nAFFECTED: StarLight\nESnet\nUSGS\nCA*Net4\nUltralight/LHCnet\nOklahoma \nDREN\nchic.layer3.nlr.net;\nSTART TIME: Saturday, August 5, 2006, 9:42 AM (0942)\nEND TIME: Saturday, August 5, 2006, 9:43 AM (0943)\nDESCRIPTION:NLR Layer 3 Engineers will perform hardware maintenance on the CHIC-CRS. Outage is expected to be less than 5 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6228&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060803T143001Z SUMMARY: 6236 NLR Layer 3 Peer Ultralight Emergency Maintenance Completed DTEND:20060803T153001Z DESCRIPTION:TICKET NUMBER: 6236\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-STAR-JACK-10GE-37\n\nSTART TIME: Thursday, August 3, 2006, 2:33 PM (1433)\nEND TIME: Thursday, August 3, 2006, 2:38 PM (1438)\nDESCRIPTION:NLR Layer 3 Peer Ultralight will be performing software maintenance on their switch in Chicago. Downtime is expected. \nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6236&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060812T090001Z SUMMARY: 6229 NLR Layer 3 Router ATLA Maintenance Completed DTEND:20060812T093001Z DESCRIPTION:TICKET NUMBER: 6229\nMAINTENANCE TYPE: Hardware\nAFFECTED: NCLR\nSLR\natla.layer3.nlr.net;chic.layer3.nlr.net;denv.layer3.nlr.net;hous.layer3.nlr.net;losa.layer3.nlr.net;newy.layer3.nlr.net;seat.layer3.nlr.net;wash.layer3.nlr.net;\nSTART TIME: Saturday, August 12, 2006, 5:06 AM (0506)\nEND TIME: Saturday, August 12, 2006, 5:11 AM (0511)\nDESCRIPTION:NLR Layer 3 Engineers, worked with remote hands, to perform hardware maintenance. Outage was expected to be less than 5 minutes. However, the entire window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6229&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060824T100001Z SUMMARY: 6230 NLR Layer 3 Router DENV Maintenance Completed DTEND:20060824T110001Z DESCRIPTION:TICKET NUMBER: 6230\nMAINTENANCE TYPE: Hardware\nAFFECTED: UCAR\nUNM\ndenv.layer3.nlr.net;\nSCHEDULED START TIME: Thursday, August 24, 2006, 10:00 AM (1000)\nSCHEDULED END TIME: Thursday, August 24, 2006, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 3 Engineers, worked with remote hands, to perform hardware maintenance. Outage is expected to be less than 5 minutes, however the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6230&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060818T080001Z SUMMARY: 6231 NLR Layer 3 Router HOUS Maintenance Completed DTEND:20060818T083001Z DESCRIPTION:TICKET NUMBER: 6231\nMAINTENANCE TYPE: Hardware\nAFFECTED: Oklahoma\nLEARN\nLONI\nhous.layer3.nlr.net;\nSTART TIME: Friday, August 18, 2006, 4:16 AM (0416)\nEND TIME: Friday, August 18, 2006, 4:19 AM (0419)\nDESCRIPTION:NLR Layer 3 Engineers, worked with remote hands, to perform hardware maintenance. Outage is expected to be less than 5 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6231&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060818T090001Z SUMMARY: 6232 NLR Layer 3 Router LOSA Maintenance Completed DTEND:20060818T100001Z DESCRIPTION:TICKET NUMBER: 6232\nMAINTENANCE TYPE: Hardware\nAFFECTED: CENIC\nUltralight\nUNM\natla.layer3.nlr.net;chic.layer3.nlr.net;denv.layer3.nlr.net;hous.layer3.nlr.net;losa.layer3.nlr.net;newy.layer3.nlr.net;seat.layer3.nlr.net;wash.layer3.nlr.net;\nSTART TIME: Friday, August 18, 2006, 5:46 AM (0546)\nEND TIME: Friday, August 18, 2006, 5:58 AM (0558)\nDESCRIPTION:NLR Layer 3 Engineers, worked with remote hands, to perform hardware maintenance. Outage is expected to be less than 5 minutes. However, the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6232&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060810T090001Z SUMMARY: 6233 NLR Layer 3 Router NEWY Maintenance Completed DTEND:20060810T110001Z DESCRIPTION:TICKET NUMBER: 6233\nMAINTENANCE TYPE: Hardware\nAFFECTED: MAN LAN\nESnet\nCornell\natla.layer3.nlr.net;chic.layer3.nlr.net;denv.layer3.nlr.net;hous.layer3.nlr.net;losa.layer3.nlr.net;newy.layer3.nlr.net;seat.layer3.nlr.net;wash.layer3.nlr.net;\nSTART TIME: Thursday, August 10, 2006, 9:56 AM (0956)\nEND TIME: Thursday, August 10, 2006, 10:37 AM (1037)\nDESCRIPTION:NLR Layer 3 Engineers, working with remote hands, performed hardware maintenance. An outage of less than 5 minutes was to be expected. However, the entire window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6233&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060811T080001Z SUMMARY: 6234 NLR Layer 3 Router SEAT Maintenance Completed DTEND:20060811T083001Z DESCRIPTION:TICKET NUMBER: 6234\nMAINTENANCE TYPE: Hardware\nAFFECTED: PNW\nDREN\nTransPAC\nPacific Wave\nCENIC\natla.layer3.nlr.net;chic.layer3.nlr.net;denv.layer3.nlr.net;hous.layer3.nlr.net;losa.layer3.nlr.net;newy.layer3.nlr.net;seat.layer3.nlr.net;wash.layer3.nlr.net;\nSTART TIME: Friday, August 11, 2006, 8:04 AM (0804)\nEND TIME: Friday, August 11, 2006, 8:21 AM (0821)\nDESCRIPTION:NLR Layer 3 Engineers, worked with remote hands to perform hardware maintenance. Outage was expected to be less than 5 minutes. However, the entire window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6234&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060817T090001Z SUMMARY: 6235 NLR Layer 3 Router WASH Maintenance Completed DTEND:20060817T093001Z DESCRIPTION:TICKET NUMBER: 6235\nMAINTENANCE TYPE: Hardware\nAFFECTED: MATP\nPSC\nNCLR\natla.layer3.nlr.net;chic.layer3.nlr.net;denv.layer3.nlr.net;hous.layer3.nlr.net;losa.layer3.nlr.net;newy.layer3.nlr.net;seat.layer3.nlr.net;wash.layer3.nlr.net;\nSTART TIME: Thursday, August 17, 2006, 5:18 AM (0518)\nEND TIME: Thursday, August 17, 2006, 5:21 AM (0521)\nDESCRIPTION:NLR Layer 3 Engineers, worked with remote hands to perform hardware maintenance. Maintenance complete.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6235&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060809T080001Z SUMMARY: 6244 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20060809T090001Z DESCRIPTION:TICKET NUMBER: 6244\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Wednesday, August 9, 2006, 8:10 AM (0810)\nEND TIME: Wednesday, August 9, 2006, 8:19 AM (0819)\nDESCRIPTION:NLR Layer 1 engineering and Level 3 technicians performed maintenance at the Level(3) facility in Tomillo, TX to replace a faulty OSC-CSM card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6244&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060811T000001Z SUMMARY: 6243 NLR Layer 3 Router CHIC Maintenance Completed DTEND:20060811T000001Z DESCRIPTION:TICKET NUMBER: 6243\nMAINTENANCE TYPE: Hardware\nAFFECTED: StarLight\nESnet\nUSGS\nCA*Net4\nUltralight/LHCnet\nOklahoma\nDREN\nchic.layer3.nlr.net;\nSCHEDULED START TIME: Friday, August 11, 2006, 12:00 AM (0000)\nSCHEDULED END TIME: Friday, August 11, 2006, 12:00 AM (0000)\nDESCRIPTION:NLR Layer 3 Engineers successfully completed hardware maintenance on the CHIC-CRS. There was no impact to service.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6243&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070311T070001Z SUMMARY: 6656 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20070311T110001Z DESCRIPTION:TICKET NUMBER: 6656\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSTART TIME: Sunday, March 11, 2007, 8:19 AM (0819)\nEND TIME: Sunday, March 11, 2007, 8:35 AM (0835)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced several cards in Raton, NM. Outages were expected during the maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6656&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060810T040001Z SUMMARY: 6251 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060810T090001Z DESCRIPTION:TICKET NUMBER: 6251\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Thursday, August 10, 2006, 7:52 AM (0752)\nEND TIME: Thursday, August 10, 2006, 9:26 AM (0926)\nDESCRIPTION:NLR L1 Engineers upgraded firmware on all 15808s along the routes spanning ATLA-WASH. Outages were expected during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6251&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060809T050001Z SUMMARY: 6254 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Cancelled DTEND:20060809T110001Z DESCRIPTION:TICKET NUMBER: 6254\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59 \nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Wednesday, August 9, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, August 9, 2006, 11:00 AM (1100)\nDESCRIPTION:***Maintenance below has been cancelled*** Level 3 Communications will perform maintenance to splice the Gary LH 108ct foc that was rerouted along the CSS Railroad's property and for the Gary LH 108ct foc that was rerouted in the freight tunnels. Dark fiber services will experience an outage up to 30 minutes.\nTIMESTAMP: Sat Nov 7 11:03:04 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6254&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060811T033001Z SUMMARY: 6256 NLR Layer 3 SEAT Router Emergency Maintenance Completed DTEND:20060811T040001Z DESCRIPTION:TICKET NUMBER: 6256\nMAINTENANCE TYPE: Hardware\nAFFECTED: PNW\nDREN\nTransPAC\nPacific Wave\nCENIC\n\nSTART TIME: Friday, August 11, 2006, 3:33 AM (0333)\nEND TIME: Friday, August 11, 2006, 3:35 AM (0335)\nDESCRIPTION:NLR Engineers performed emergency maintenance on the Seattle Router. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6256&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060822T070001Z SUMMARY: 6257 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed (1st window) DTEND:20060822T130001Z DESCRIPTION:TICKET NUMBER: 6257\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, August 22, 2006, 9:13 AM (0913)\nEND TIME: Tuesday, August 22, 2006, 11:39 AM (1139)\nDESCRIPTION:Level3 technicians rolled fiber back to the original location. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6257&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060823T070001Z SUMMARY: 6258 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance (2nd window) Completed DTEND:20060823T130001Z DESCRIPTION:TICKET NUMBER: 6258\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, August 23, 2006, 7:00 AM (0700)\nSCHEDULED END TIME: Wednesday, August 23, 2006, 1:00 PM (1300)\nDESCRIPTION:Level3 technicians rolled fiber back to its original location between Sacramento to Suisun. No outage detected.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6258&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060824T070001Z SUMMARY: 6259 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Cancelled (3rd window) DTEND:20060824T130001Z DESCRIPTION:TICKET NUMBER: 6259\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Thursday, August 24, 2006, 7:00 AM (0700)\nSCHEDULED END TIME: Thursday, August 24, 2006, 1:00 PM (1300)\nDESCRIPTION:Level3 has cancelled this maintenance window. Level3 technicians will be rolling fiber back to its original location between Sacramento to Suisun An outage up to 30 minutes is to be expected, however the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6259&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060822T060001Z SUMMARY: 6278 NLR Layer 3 Routes Spanning CHIC-KANS Emergency Maintenance Completed DTEND:20060822T080001Z DESCRIPTION:TICKET NUMBER: 6278\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-TULS-CHIC-10GE-97\nNLR-CHIC-HOUS-10GE-67\nNLR-DENV-CHIC-10GE-36\n\n\nSTART TIME: Tuesday, August 22, 2006, 6:50 AM (0650)\nEND TIME: Tuesday, August 22, 2006, 7:07 AM (0707)\nDESCRIPTION:NLR Layer 3 Backbone Circuits spanning CHIC-KANS were unavailable to the NLR Layer 3 community. NLR L1 NOC Engineering, working with Level(3) Technicians, replaced a bad OP_ELH card in the NLR 15808 in Tipton, MO.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6278&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060822T040001Z SUMMARY: 6267 NLR Layer 3 Routes Spanning WASH-PITT Maintenance Completed DTEND:20060822T150001Z DESCRIPTION:TICKET NUMBER: 6267\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-PITT-WASH-10GE-66\nNLR-CHIC-WASH-10GE-59\n\nSTART TIME: Tuesday, August 22, 2006, 7:37 AM (0737)\nEND TIME: Tuesday, August 22, 2006, 8:08 AM (0808)\nDESCRIPTION:NLR Route WASH-PITT was unavailable as NLR Layer 1 NOC Engineering performed firmware upgrades. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6267&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060823T040001Z SUMMARY: 6274 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060823T060001Z DESCRIPTION:TICKET NUMBER: 6274\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, August 23, 2006, 4:01 AM (0401)\nEND TIME: Wednesday, August 23, 2006, 4:45 AM (0445)\nDESCRIPTION:NLR Engineers worked with Level3 Technicans and replaced a faulty OA_ELH card in McLean, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6274&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060830T050001Z SUMMARY: 6283 NLR Layer 3 Backbone Circuit TULS-CHIC, CHIC-HOUS and DENV-CHIC Maintenance Completed DTEND:20060830T070001Z DESCRIPTION:TICKET NUMBER: 6283\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-TULS-CHIC-10GE-97\nNLR-CHIC-HOUS-10GE-67\nNLR-DENV-CHIC-10GE-36\n\nSCHEDULED START TIME: Wednesday, August 30, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, August 30, 2006, 7:00 AM (0700)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced a PLF card in Springfield, IL. No outage was detected.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6283&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060830T060001Z SUMMARY: 6281 NLR Layer 3 Backbone Circuits Spanning CHIC-PITT Maintenance Completed DTEND:20060830T110001Z DESCRIPTION:TICKET NUMBER: 6281\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, August 30, 2006, 7:27 AM (0727)\nEND TIME: Wednesday, August 30, 2006, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-PITT underwent maintenance as NLR Layer 1 NOC Engineers performed firmware upgrades. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6281&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060901T060001Z SUMMARY: 6282 NLR Layer 3 Routes Spanning CHIC-PITT Maintenance Completed DTEND:20060901T110001Z DESCRIPTION:TICKET NUMBER: 6282\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Friday, September 1, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Friday, September 1, 2006, 11:00 AM (1100)\nDESCRIPTION:NLR L1 NOC Engineering upgraded firmware on the 15808s at the OLA sites along this route. Outages are expected during this maintenance. This maintenance is the 2nd part of 6281:77.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6282&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060825T193001Z SUMMARY: 6284 NLR Layer 3 Member LONI Maintenance Completed DTEND:20060825T220001Z DESCRIPTION:TICKET NUMBER: 6284\nMAINTENANCE TYPE: Hardware\nAFFECTED: Layer 3 Member LONI\n\nSTART TIME: Friday, August 25, 2006, 7:24 PM (1924)\nEND TIME: Friday, August 25, 2006, 8:17 PM (2017)\nDESCRIPTION:Member LONI performed maintenance on their BGP connection to NLR. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6284&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060830T050001Z SUMMARY: 6290 NLR Layer 3 Backbone Circuits Spanning DALL-HOUS Emergency Maintenance Completed DTEND:20060830T110001Z DESCRIPTION:TICKET NUMBER: 6290\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Wednesday, August 30, 2006, 5:25 AM (0525)\nEND TIME: Wednesday, August 30, 2006, 7:52 AM (0752)\nDESCRIPTION:Level(3) performed emergency circuit maintenance between Navasota and Waller, TX. Outage time during window was only 8 minutes.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6290&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060919T040001Z SUMMARY: 6291 NLR Layer 3 Backbone Circuit NEWY-CHIC and CHIC-WASH Maintenance Completed DTEND:20060919T060001Z DESCRIPTION:TICKET NUMBER: 6291\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, September 19, 2006, 4:20 AM (0420)\nEND TIME: Tuesday, September 19, 2006, 4:33 AM (0433)\nDESCRIPTION:Layer1 with the assistance of Level3, replaced a BSC-ELH card in Gary, IN. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6291&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060831T180001Z SUMMARY: 6295 NLR Layer 3 Member TransPAC2 Maintenance Completed DTEND:20060831T200001Z DESCRIPTION:TICKET NUMBER: 6295\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member TransPAC2\n\nSTART TIME: Thursday, August 31, 2006, 6:09 PM (1809)\nEND TIME: Thursday, August 31, 2006, 6:59 PM (1859)\nDESCRIPTION:TransPAC2 Engineers performed circuit maintenance. Loss of connectivity lasted less than an hour.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6295&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060906T100001Z SUMMARY: 6297 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060906T120001Z DESCRIPTION:TICKET NUMBER: 6297\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, September 6, 2006, 10:15 AM (1015)\nEND TIME: Wednesday, September 6, 2006, 10:24 AM (1024)\nDESCRIPTION:NLR L1 NOC Engineering with the assistance of Level3 replaced an ORP_ELH_1 card in Medicine Bow, WY. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6297&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060906T060001Z SUMMARY: 6299 NLR Layer 3 Backbone Circuits Spanning CHIC-PITT Maintenance Completed DTEND:20060906T120001Z DESCRIPTION:TICKET NUMBER: 6299\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Wednesday, September 6, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Wednesday, September 6, 2006, 12:00 PM (1200)\nDESCRIPTION:NLR L1 NOC Engineers upgraded firmware on the 15808's along this span. No Outage was detected during the transponder modules reset. \nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6299&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060911T030001Z SUMMARY: 6300 (Enlightened computing project) Maintenance Freeze DTEND:20060913T053001Z DESCRIPTION:TICKET NUMBER: 6300\nMAINTENANCE TYPE: Maintenance-Freeze\nAFFECTED: \nSCHEDULED START TIME: Monday, September 11, 2006, 3:00 AM (0300)\nSCHEDULED END TIME: Wednesday, September 13, 2006, 5:30 AM (0530)\nDESCRIPTION:This ticket has been created to document and track the maintenance freeze for (Enlightened computing project)\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6300&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060903T050001Z SUMMARY: 6302 NLR Layer 3 Router WASH Maintenance Completed DTEND:20060903T053001Z DESCRIPTION:TICKET NUMBER: 6302\nMAINTENANCE TYPE: Software\nAFFECTED: MATP\nPSC\nDUKE\nCornell (backup)\n\nSTART TIME: Sunday, September 3, 2006, 5:25 AM (0525)\nEND TIME: Sunday, September 3, 2006, 5:29 AM (0529)\nDESCRIPTION:NLR Layer 3 NOC Engineers will be performed a reboot of the Washington CRS router.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6302&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060920T050001Z SUMMARY: 6305 NLR Layer 3 Backbone Circuits Spanning CHIC-DENV, CHIC-HOUS & CHIC-TULS Maintenance Completed DTEND:20060920T070001Z DESCRIPTION:TICKET NUMBER: 6305\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Wednesday, September 20, 2006, 5:13 AM (0513)\nEND TIME: Wednesday, September 20, 2006, 5:28 AM (0528)\nDESCRIPTION:NLR L1 NOC Engineering, working with Level(3) Technicians, replaced an OA-ELH card in Centerview, MO. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6305&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061003T050001Z SUMMARY: 6339 NLR Layer 3 Backbone Circuits Spanning CHIC-NEWY Maintenance Completed DTEND:20061003T070001Z DESCRIPTION:TICKET NUMBER: 6339\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, October 3, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, October 3, 2006, 7:00 AM (0700)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an ORP-ELH card in Detroit, Michigan. No outage is detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6339&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060908T113001Z SUMMARY: 6310 NLR Layer 3 Member Cornell Maintenance Completed DTEND:20060908T120001Z DESCRIPTION:TICKET NUMBER: 6310\nMAINTENANCE TYPE: Hardware\nAFFECTED: Cornell\n\nSTART TIME: Friday, September 8, 2006, 11:29 AM (1129)\nEND TIME: Friday, September 8, 2006, 11:32 AM (1132)\nDESCRIPTION:Cornell will be rebooting the 6500 switch in New York and will be unavailable to the NLR community. The outage should only be 10 minutes but the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6310&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060912T110001Z SUMMARY: 6313 NLR Layer 3 Router DENV Maintenance Completed DTEND:20060912T120001Z DESCRIPTION:TICKET NUMBER: 6313\nMAINTENANCE TYPE: Hardware\nAFFECTED: DENV - CHIC\nDENV - HOUS\nDENV - LOSA\nDENV - SEAT\n\nSTART TIME: Tuesday, September 12, 2006, 11:02 AM (1102)\nEND TIME: Tuesday, September 12, 2006, 11:07 AM (1107)\nDESCRIPTION:NLR Layer 2 engineers worked with remote hands to replace faulty hardware. There was a possibility that this maintenance could cause various backbone connectivity issues as a result of cards resetting. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6313&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060920T110001Z SUMMARY: 6322 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20060920T130001Z DESCRIPTION:TICKET NUMBER: 6322\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, September 20, 2006, 11:00 AM (1100)\nSCHEDULED END TIME: Wednesday, September 20, 2006, 1:00 PM (1300)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an ORP-ELH card in Sacramento, CA. An outage of up to the entire window was possible during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6322&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060919T070001Z SUMMARY: 6318 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20060919T090001Z DESCRIPTION:TICKET NUMBER: 6318\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Tuesday, September 19, 2006, 7:00 AM (0700)\nSCHEDULED END TIME: Tuesday, September 19, 2006, 9:00 AM (0900)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an ORP-ELH card in Salisbury, NC. No outage was detected. Maintenance has now been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6318&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070827T110001Z SUMMARY: 7112 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070827T130001Z DESCRIPTION:TICKET NUMBER: 7112\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, August 27, 2007, 11:10 AM (1110)\nEND TIME: Monday, August 27, 2007, 11:33 AM (1133)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, performed maintenance on a card in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7112&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070828T070001Z SUMMARY: 7113 NLR Layer 3 Backbone Circuits Spanning DENV-KANS Maintenance Completed DTEND:20070828T090001Z DESCRIPTION:TICKET NUMBER: 7113\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, August 28, 2007, 6:57 AM (0657)\nEND TIME: Tuesday, August 28, 2007, 7:01 AM (0701)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Grafton, NE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7113&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060920T080001Z SUMMARY: 6327 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20060920T100001Z DESCRIPTION:TICKET NUMBER: 6327\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Wednesday, September 20, 2006, 8:08 AM (0808)\nEND TIME: Wednesday, September 20, 2006, 8:53 AM (0853)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced 15454-10E-L1-C card in Baton Rouge, LA. Maintenance has been completed\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6327&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060926T110001Z SUMMARY: 6325 NR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060926T130001Z DESCRIPTION:TICKET NUMBER: 6325\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, September 26, 2006, 11:20 AM (1120)\nEND TIME: Tuesday, September 26, 2006, 11:28 AM (1128)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an ORP-ELH-2 card in Durkee, OR. A brief outage happened during this maintenance window..\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6325&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060926T070001Z SUMMARY: 6331 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20060926T090001Z DESCRIPTION:TICKET NUMBER: 6331\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, September 26, 2006, 7:35 AM (0735)\nEND TIME: Tuesday, September 26, 2006, 7:49 AM (0749)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), was replaced an OA-ELH card in Rieth, Oregon. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6331&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061018T080001Z SUMMARY: 6353 NLR Layer 3 Backbone Circuits Spanning DENV- HOUS Maintenance Completed DTEND:20061018T100001Z DESCRIPTION:TICKET NUMBER: 6353\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\n NLR-DENV-HOUS-10GE-82\n\nSTART TIME: Wednesday, October 18, 2006, 8:23 AM (0823)\nEND TIME: Wednesday, October 18, 2006, 8:36 AM (0836)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an ORP-ELH card in Heartwell, NE Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6353&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061205T090001Z SUMMARY: 6469 NLR Layer 3 Backbone Circuits Spanning ATLA-JACK Maintenance Completed DTEND:20061205T100001Z DESCRIPTION:TICKET NUMBER: 6469\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-HOUS-10GE-70\nNLR-ATLA-JACK-10GE-151\n\nSCHEDULED START TIME: Tuesday, December 5, 2006, 9:00 AM (0900)\nSCHEDULED END TIME: Tuesday, December 5, 2006, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed a firmware upgrade on a recent replaced card in Soperton, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6469&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20060929T163001Z SUMMARY: 6341 NLR Layer 3 Member PNWGP Maintenance Extended DTEND:20060929T193001Z DESCRIPTION:TICKET NUMBER: 6341\nMAINTENANCE TYPE: Hardware\nAFFECTED: PNWGP\n\nSCHEDULED START TIME: Friday, September 29, 2006, 4:30 PM (1630)\nSCHEDULED END TIME: Friday, September 29, 2006, 7:30 PM (1930)\nDESCRIPTION:Member PNWGP will be relocating hardware in Seattle. Their peering to NLR is expected to be affected during this maintenance. Please note maintenance has been extended.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6341&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061017T070001Z SUMMARY: 6351 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20061017T103001Z DESCRIPTION:TICKET NUMBER: 6351\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, October 17, 2006, 9:27 AM (0927)\nEND TIME: Tuesday, October 17, 2006, 9:58 AM (0958)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an OA-ELH card in Tulelake, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6351&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061013T060001Z SUMMARY: 6349 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20061014T120001Z DESCRIPTION:TICKET NUMBER: 6349\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Friday, October 13, 2006, 10:10 AM (1010)\nEND TIME: Friday, October 13, 2006, 10:49 AM (1049)\nDESCRIPTION:Level(3) technicians will be splicing a new fiber cable from an existing splice point to repair a fiber cut, this work is to permanently repair the temporary splicing done to restore a fiber cable cut. Two nights will be required to complete this restoration. Maintenace has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6349&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061010T040001Z SUMMARY: 6345 NLR Layer 3 Backbone Circuit WASH-ATLA Maintenance Completed DTEND:20061010T060001Z DESCRIPTION:TICKET NUMBER: 6345\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Tuesday, October 10, 2006, 4:15 AM (0415)\nEND TIME: Tuesday, October 10, 2006, 4:38 AM (0438)\nDESCRIPTION:NLR L1 Engineering, with the assistance of Level(3), replaced an OA-ELH card in Richmond, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6345&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061005T020001Z SUMMARY: 6346 NLR Layer3 Peer CA*net(CHIN) Emergency Maintenance Extended DTEND:20061005T073001Z DESCRIPTION:TICKET NUMBER: 6346\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CA*net\n\nSTART TIME: Thursday, October 5, 2006, 5:25 AM (0525)\nEND TIME: Thursday, October 5, 2006, 7:14 AM (0714)\nDESCRIPTION:Peer CA*net will perform maintenance. The maximum down time could be up to 3 hours, however the entire window will be reserved. Traffic will be re-routed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6346&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061007T120001Z SUMMARY: 6350 NLR Layer 3 Member LONI Maintenance DTEND:20061007T123001Z DESCRIPTION:TICKET NUMBER: 6350\nMAINTENANCE TYPE: Software\nAFFECTED: Layer 3 Peer LONI\n\nSTART TIME: Saturday, October 7, 2006, 12:10 PM (1210)\nEND TIME: Saturday, October 7, 2006, 12:24 PM (1224)\nDESCRIPTION:Member LONI was unavailable. LONI Engineers reported that this was due to a maintenance.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6350&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061018T040001Z SUMMARY: 6352 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed. DTEND:20061018T060001Z DESCRIPTION:TICKET NUMBER: 6352\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, October 18, 2006, 4:51 AM (0451)\nEND TIME: Wednesday, October 18, 2006, 5:20 AM (0520)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of Level(3), replaced an OP-ELH card in Bogart, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6352&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061129T113001Z SUMMARY: 6467 NLR Layer 3 Member PSC Maintenance Completed DTEND:20061129T123001Z DESCRIPTION:TICKET NUMBER: 6467\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-PITT-WASH-10GE-66\n\nSCHEDULED START TIME: Wednesday, November 29, 2006, 11:30 AM (1130)\nSCHEDULED END TIME: Wednesday, November 29, 2006, 12:30 PM (1230)\nDESCRIPTION:PSC Engineers performed hardware maintenance in Washington D.C. Traffic was re-routed through Chicago during this maintenance period. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6467&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061214T060001Z SUMMARY: 6465 NLR Layer 3 Backbone Circuits Spanning CHIC-HOUS Maintenance Completed DTEND:20061214T120001Z DESCRIPTION:TICKET NUMBER: 6465\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Thursday, December 14, 2006, 7:31 AM (0731)\nEND TIME: Thursday, December 14, 2006, 11:02 AM (1102)\nDESCRIPTION:NLR circuits spanning CHIC-HOUS underwent a maintenance due to a road widening project in Osage County, Oklahoma. Level(3) completed a fiber move. An outage of up to 2 hours window was to be expected, however the entire maintenance window was reserved.\nTIMESTAMP: Sat Nov 7 11:03:05 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6465&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061014T040001Z SUMMARY: 6357 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Cancelled DTEND:20061014T100001Z DESCRIPTION:TICKET NUMBER: 6357\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Saturday, October 14, 2006, 4:00 AM (0400)\nSCHEDULED END TIME: Saturday, October 14, 2006, 10:00 AM (1000)\nDESCRIPTION:Level(3) has cancelled this maintenance. Level(3) technicians will perform Fiber optic fusion splicing inclusive to a fiber optic cable section. A 2 hour outage is to be expected.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6357&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061023T040001Z SUMMARY: 6358 NLR Layer 3 Backbone Circuit CLEV-NEWY Maintenance Completed DTEND:20061023T100001Z DESCRIPTION:TICKET NUMBER: 6358\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, October 23, 2006, 5:23 AM (0523)\nEND TIME: Monday, October 23, 2006, 6:43 AM (0643)\nDESCRIPTION:Level(3) Technicians performed fiber splicing near Utica, NY. An outage of 41 minutes was incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6358&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061103T060001Z SUMMARY: 6360 NLR Layer 3 Backbone Circuits CHIC-WASH and CHIC-NEWY Maintenance Cancelled DTEND:20061103T120001Z DESCRIPTION:TICKET NUMBER: 6360\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Friday, November 3, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Friday, November 3, 2006, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 Backbone Circuits CHIC-WASH and CHIC-NEWY will be temporarily unavailable to the NLR community due to fiber splicing in Chicago for the CSS Railroad Project. A 30 minute outage is expected however the entire maintenance window is reserved. ***Please note this maintenance was cancelled***\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6360&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061107T060001Z SUMMARY: 6362 NLR Layer 3 Backbone Circuit HOUS-LOSA and DENV-LOSA Maintenance Cancelled DTEND:20061107T120001Z DESCRIPTION:TICKET NUMBER: 6362\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSCHEDULED START TIME: Tuesday, November 7, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, November 7, 2006, 12:00 PM (1200)\nDESCRIPTION:NLR Route ELPA-HOUS will be temporarily unavailable due to fiber splicing and maintenance by Level(3) in Socorro, NM. While the entire time may not be needed during maintenance it has still been reserved. ***Maintenance has been cancelled***\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6362&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061025T050001Z SUMMARY: 6367 NLR Layer 3 Backbone Circuit DENV-CHIC Maintenance Completed DTEND:20061025T100001Z DESCRIPTION:TICKET NUMBER: 6367\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\n\nSTART TIME: Wednesday, October 25, 2006, 5:40 AM (0540)\nEND TIME: Wednesday, October 25, 2006, 5:41 AM (0541)\nDESCRIPTION:NLR L1 NOC Engineers upgraded firmware on the 15808 in Chicago, IL. Outage incurred was under 1 minute.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6367&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061101T110001Z SUMMARY: 6368 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20061101T130001Z DESCRIPTION:TICKET NUMBER: 6368\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, November 1, 2006, 11:05 AM (1105)\nEND TIME: Wednesday, November 1, 2006, 11:12 AM (1112)\nDESCRIPTION:NLR Layer 1 NOC engineers with the assistance of Level(3) technicians replaced an ORP ELH card in Sacramento, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6368&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061023T190001Z SUMMARY: 6369 Layer 3 Member MAN LAN Maintenance Completed DTEND:20061023T230001Z DESCRIPTION:TICKET NUMBER: 6369\nMAINTENANCE TYPE: Hardware\nAFFECTED: MAN LAN Peers CA*net4 and ESnet\n\nSTART TIME: Monday, October 23, 2006, 8:13 PM (2013)\nEND TIME: Monday, October 23, 2006, 10:32 PM (2232)\nDESCRIPTION:Member MAN LAN performed hardware, software, and circuit maintenance. Outages were expected and could have possibly encompassed the entire maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6369&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061025T070001Z SUMMARY: 6375 NLR Layer 3 Backbone Circuit LOSA-SUNN Maintenance Completed DTEND:20061025T130001Z DESCRIPTION:TICKET NUMBER: 6375\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, October 25, 2006, 8:48 AM (0848)\nEND TIME: Wednesday, October 25, 2006, 12:00 PM (1200)\nDESCRIPTION:Circuits on NLR Routes Spanning SUNN-SEAT were intermittently unavailable while Level(3) performs circuit maintenance (fiber splicing) in Suisun City, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6375&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061026T070001Z SUMMARY: 6378 NLR Layer 3 Peer CA*Net4-Winnipeg (CHIC) Emergency Maintenance Extended Update DTEND:20061030T210001Z DESCRIPTION:TICKET NUMBER: 6378\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*Net4-Winnipeg (CHIC)\n\n\nSTART TIME: Thursday, October 26, 2006, 7:25 AM (0725)\nEND TIME: Monday, October 30, 2006, 5:56 PM (1756)\nDESCRIPTION:Peer CA*Net4 performed emergency maintenance. CA*Net4 reports that their circuit provider has identified the problem , a faulty card in Chicago. CA*Net4 reports their circuit will remain down until the card can be replaced. The card is expected to arrive today.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6378&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061206T130001Z SUMMARY: 6474 NLR Layer 3 Member PSC Maintenance Completed DTEND:20061206T150001Z DESCRIPTION:TICKET NUMBER: 6474\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member PSC\n\nSCHEDULED START TIME: Wednesday, December 6, 2006, 1:00 PM (1300)\nSCHEDULED END TIME: Wednesday, December 6, 2006, 3:00 PM (1500)\nDESCRIPTION:Member PSC vendor performed network maintenance within the Pittsburgh metronetwork. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6474&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061113T060001Z SUMMARY: 6443 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20061113T120001Z DESCRIPTION:TICKET NUMBER: 6443\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, November 13, 2006, 6:59 AM (0659)\nEND TIME: Monday, November 13, 2006, 9:43 AM (0943)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV were intermittently unavailable while Level(3) spliced fiber in Chicago, IL.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6443&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061128T050001Z SUMMARY: 6446 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Cancelled DTEND:20061128T070001Z DESCRIPTION:TICKET NUMBER: 6446\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Tuesday, November 28, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, November 28, 2006, 7:00 AM (0700)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), will replace an OP-ELH card in King George, VA Outages can be expected during the maintenance window. ***Maintenance has been cancelled***\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6446&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061129T230001Z SUMMARY: 6451 NLR Layer 3 Backbone Circuits Spanning CHIC-WASH Maintenance Completed DTEND:20061130T050001Z DESCRIPTION:TICKET NUMBER: 6451\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66 \nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Wednesday, November 29, 2006, 11:00 PM (2300)\nSCHEDULED END TIME: Thursday, November 30, 2006, 5:00 AM (0500)\nDESCRIPTION:NLR Layer 3 backbone circuits spanning CHIC-WASH underwent maintenance to complete APP (Automatic Power Provisioning). No interruption of service is expected, however the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6451&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061129T100001Z SUMMARY: 6463 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20061129T120001Z DESCRIPTION:TICKET NUMBER: 6463\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, November 29, 2006, 10:19 AM (1019)\nEND TIME: Wednesday, November 29, 2006, 10:32 AM (1032)\nDESCRIPTION:NLR Layer 1 Engineers, with the assistance of Level(3), replaced 3 cards in Rawlins, Wyoming. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6463&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061128T060001Z SUMMARY: 6456 NLR Layer 3 Peer CA*Net4 Winnipeg (CHIC) Maintenance Completed DTEND:20061128T120001Z DESCRIPTION:TICKET NUMBER: 6456\nMAINTENANCE TYPE: Circuit\nAFFECTED: CA*Net4\n\nSTART TIME: Tuesday, November 28, 2006, 9:08 AM (0908)\nEND TIME: Tuesday, November 28, 2006, 9:10 AM (0910)\nDESCRIPTION:NLR Peer CA*Net4 carrier performed circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6456&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061106T050101Z SUMMARY: 6414 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Completed DTEND:20061106T070001Z DESCRIPTION:TICKET NUMBER: 6414\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, November 6, 2006, 6:03 AM (0603)\nEND TIME: Monday, November 6, 2006, 7:02 AM (0702)\nDESCRIPTION:NLR L1 NOC Engineers, with the assistance of Level(3), replaced a transponder card in both Syracuse, NY and Cleveland, OH simultaneously. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6414&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061107T160001Z SUMMARY: 6413 NLR Layer 3 Peer University of New Mexico Maintenance Completed DTEND:20061107T180001Z DESCRIPTION:TICKET NUMBER: 6413\nMAINTENANCE TYPE: Circuit\nAFFECTED: University of New Mexico\n\nSCHEDULED START TIME: Tuesday, November 7, 2006, 4:00 PM (1600)\nSCHEDULED END TIME: Tuesday, November 7, 2006, 6:00 PM (1800)\nDESCRIPTION:NLR Layer 3 Peer University of New Mexico performed local fiber testing which may cause route flapping to occur. The entire maintenance window was reserved.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6413&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061121T050001Z SUMMARY: 6421 NLR Layer 3 Backbone Circuits Spanning ATLA-JACK Maintenance Completed DTEND:20061121T070001Z DESCRIPTION:TICKET NUMBER: 6421\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\nNLR-ATLA-JACK-10GE-151\n\nSTART TIME: Tuesday, November 21, 2006, 6:23 AM (0623)\nEND TIME: Tuesday, November 21, 2006, 6:36 AM (0636)\nDESCRIPTION:NLR Layer 1 NOC Engineering worked with Level(3) technicians to replace failing hardware in Soperton, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6421&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061107T050001Z SUMMARY: 6406 NLR Layer 3 Backbone Circuit DENV-CHIC Maintenance Completed DTEND:20061107T070001Z DESCRIPTION:TICKET NUMBER: 6406\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\n\nSTART TIME: Tuesday, November 7, 2006, 5:10 AM (0510)\nEND TIME: Tuesday, November 7, 2006, 5:38 AM (0538)\nDESCRIPTION:NLR L1 NOC Engineering, working with Level(3) technicians, performed firmware upgrades in Kansas City, Missouri. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6406&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061115T070001Z SUMMARY: 6405 NLR Layer 3 Backbone Circuits Spanning LOSA-HOUS Maintenance Completed DTEND:20061115T130001Z DESCRIPTION:TICKET NUMBER: 6405\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\nNLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Wednesday, November 15, 2006, 8:55 AM (0855)\nEND TIME: Wednesday, November 15, 2006, 11:09 AM (1109)\nDESCRIPTION:Circuits on NLR Routes Spanning PHOE-HOUS were intermittently unavailable while Level(3) performed circuit maintenance (fiber splicing) in Phoenix, AZ. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6405&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061102T020001Z SUMMARY: 6408 NLR Layer 3 Peer Ultralight Emergency Maintenance Completed DTEND:20061102T040001Z DESCRIPTION:TICKET NUMBER: 6408\nMAINTENANCE TYPE: Hardware\nAFFECTED: Ultralight\n\nSTART TIME: Thursday, November 2, 2006, 2:38 AM (0238)\nEND TIME: Thursday, November 2, 2006, 2:48 AM (0248)\nDESCRIPTION:NLR Layer 3 Peer Ultralight will be performing emergency maintenance in Los Angeles. Maintenance should cause a one hour outage however the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6408&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061107T143001Z SUMMARY: 6409 NLR Layer 3 Peer NREN Maintenance DTEND:20061107T153001Z DESCRIPTION:TICKET NUMBER: 6409\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer NREN\n\nSTART TIME: Tuesday, November 7, 2006, 2:30 PM (1430)\nEND TIME: Tuesday, November 7, 2006, 3:26 PM (1526)\nDESCRIPTION:Peer NREN will be performing hardware maintenance. A brief outage is expected, however the entire window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6409&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061108T050001Z SUMMARY: 6425 NLR IXP Starlight (CHIN) Maintenance Cancelled DTEND:20061108T060001Z DESCRIPTION:TICKET NUMBER: 6425\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR IXP Starlight\n\nSCHEDULED START TIME: Wednesday, November 8, 2006, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, November 8, 2006, 6:00 AM (0600)\nDESCRIPTION:NLR IXP Starlight will be performing maintenance. A brief outage is expected, however the entire window has been reserved. ***Please note maintenance has been cancelled***\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6425&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061107T080001Z SUMMARY: 6423 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Completed DTEND:20061107T100001Z DESCRIPTION:TICKET NUMBER: 6423\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, November 7, 2006, 8:26 AM (0826)\nEND TIME: Tuesday, November 7, 2006, 9:38 AM (0938)\nDESCRIPTION:NLR L1 NOC Engineers, with the assistance of Level(3), performed maintenance in both Syracuse, NY and Cleveland, OH simultaneously. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6423&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061129T050001Z SUMMARY: 6477 NLR Layer 3 Backbone Circuit WASH-ATLA Maintenance Completed DTEND:20061129T070001Z DESCRIPTION:TICKET NUMBER: 6477\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, November 29, 2006, 10:18 AM (1018)\nEND TIME: Wednesday, November 29, 2006, 10:26 AM (1026)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an OP-ELH-L card in Dinwiddie,VA Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6477&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061121T010001Z SUMMARY: 6449 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20061121T070001Z DESCRIPTION:TICKET NUMBER: 6449\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Tuesday, November 21, 2006, 1:00 AM (0100)\nSCHEDULED END TIME: Tuesday, November 21, 2006, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 2 DENV-SEAT Backbone Circuit underwent maintenance to do APP (Automatic Power Provisioning). No interruption of service was incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6449&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061128T100001Z SUMMARY: 6437 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20061128T120001Z DESCRIPTION:TICKET NUMBER: 6437\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, November 28, 2006, 10:08 AM (1008)\nEND TIME: Tuesday, November 28, 2006, 10:20 AM (1020)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an OP-ELH card in Fort Bridger, Wyoming. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6437&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061109T110001Z SUMMARY: 6429 NLR Layer 3 Peer NREN Maintenance DTEND:20061109T230001Z DESCRIPTION:TICKET NUMBER: 6429\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer NREN\n\nSCHEDULED START TIME: Thursday, November 9, 2006, 11:00 AM (1100)\nSCHEDULED END TIME: Thursday, November 9, 2006, 11:00 PM (2300)\nDESCRIPTION:NLR Layer 3 Peer NREN will be performing maintenance in NASA Langley. The outage is scheduled to allow Verizon/ELite to do service on the Langley circuit. The entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6429&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061122T000001Z SUMMARY: 6450 NLR Layer 3 Backbone Circuits Spanning DENV-CHIC Maintenance Completed DTEND:20061122T060001Z DESCRIPTION:TICKET NUMBER: 6450\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Wednesday, November 22, 2006, 12:00 AM (0000)\nSCHEDULED END TIME: Wednesday, November 22, 2006, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning DENV-CHIC underwent APP (Automatic Power Provisioning). No outage was incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6450&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061120T080001Z SUMMARY: 6432 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Canceled DTEND:20061120T140001Z DESCRIPTION:TICKET NUMBER: 6432\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Monday, November 20, 2006, 8:00 AM (0800)\nSCHEDULED END TIME: Monday, November 20, 2006, 2:00 PM (1400)\nDESCRIPTION:NLR Layer 3 Backbone Circuit LOSA-SEAT will be unavailable due to a Level(3) power upgrade in Suisun City. A six hour maintenance window is scheduled. ***This maintenance has been canceled.***\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6432&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061121T080001Z SUMMARY: 6433 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20061121T140001Z DESCRIPTION:TICKET NUMBER: 6433\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, November 21, 2006, 8:00 AM (0800)\nSCHEDULED END TIME: Tuesday, November 21, 2006, 2:00 PM (1400)\nDESCRIPTION:Level(3) technicians performed a power upgrade in San Martin. No outage was incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6433&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061214T060001Z SUMMARY: 6461 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Canceled DTEND:20061214T120001Z DESCRIPTION:TICKET NUMBER: 6461\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSCHEDULED START TIME: Thursday, December 14, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, December 14, 2006, 12:00 PM (1200)\nDESCRIPTION:Level(3) technicians will perform a backbone Relocation in Socorro, NM. Up to a 2 hour outage can be expected, however the entire window has been reserved. This maintenance has been canceled\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6461&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061205T050001Z SUMMARY: 6460 NLR Layer 3 Backbone Circuits Spanning CHIC-WASH Maintenance Completed DTEND:20061205T070001Z DESCRIPTION:TICKET NUMBER: 6460\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Tuesday, December 5, 2006, 5:12 AM (0512)\nEND TIME: Tuesday, December 5, 2006, 6:42 AM (0642)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an OPA-C card in Uniontown, PA Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6460&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061118T080001Z SUMMARY: 6455 PacketNET ATLA & WDC OOB Maintenance DTEND:20061118T110001Z DESCRIPTION:TICKET NUMBER: 6455\nMAINTENANCE TYPE: Circuit\nAFFECTED: OOB access in Atlanta, GA; New York, NY; & Washington DC\natla.oob.nlr.net;newy.oob.nlr.net;wash.oob.nlr.net;\nSCHEDULED START TIME: Saturday, November 18, 2006, 8:00 AM (0800)\nSCHEDULED END TIME: Saturday, November 18, 2006, 11:00 AM (1100)\nDESCRIPTION:Monitoring will be unstable during the maintenance window. Unstable monitoring will be less than 30 minutes.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6455&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061111T010001Z SUMMARY: 6439 NLR Layer 3 Peer SURFnet Emergency Maintenance Completed DTEND:20061111T020001Z DESCRIPTION:TICKET NUMBER: 6439\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer SURFnet\n\nSTART TIME: Saturday, November 11, 2006, 1:13 AM (0113)\nEND TIME: Saturday, November 11, 2006, 1:52 AM (0152)\nDESCRIPTION:NLR Layer 3 Peer SURFnet is performing emergency maintenance. An brief outage is expected, however the entire maintenance window will be reserved.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6439&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061206T050101Z SUMMARY: 6468 NLR Layer 3 Peer CA*Net4 Toronto (CHIC) Maintenance Completed DTEND:20061206T110001Z DESCRIPTION:TICKET NUMBER: 6468\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*Net4\n\nSCHEDULED START TIME: Wednesday, December 6, 2006, 5:01 AM (0501)\nSCHEDULED END TIME: Wednesday, December 6, 2006, 11:00 AM (1100)\nDESCRIPTION:NLR Peer CA*Net4 carrier performed hardware maintenance to replace a faulty OC192 card on the longhaul system. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6468&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061118T080001Z SUMMARY: 6457 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20061118T140001Z DESCRIPTION:TICKET NUMBER: 6457\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Saturday, November 18, 2006, 8:00 AM (0800)\nSCHEDULED END TIME: Saturday, November 18, 2006, 2:00 PM (1400)\nDESCRIPTION:Level 3 Communications must perform emergency cable restoration due to cable being crushed by a bucket loader in Olympia and Ostrander, Washington. Outages can be expected during maintenance period. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6457&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061120T060001Z SUMMARY: 6458 NLR Layer 3 Backbone Circuit Spanning CHIC-HOUS Maintenance Completed DTEND:20061120T120001Z DESCRIPTION:TICKET NUMBER: 6458\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Monday, November 20, 2006, 6:00 AM (0600)\nSCHEDULED END TIME: Monday, November 20, 2006, 12:00 PM (1200)\nDESCRIPTION:Level(3) performed emergency repair and maintenance to fiber cable in Houston, Texas. An outage of up to an hour was expected. Maintenance was completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6458&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061206T050001Z SUMMARY: 6481 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20061206T070001Z DESCRIPTION:TICKET NUMBER: 6481\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, December 6, 2006, 5:11 AM (0511)\nEND TIME: Wednesday, December 6, 2006, 5:16 AM (0516)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of Level(3), replaced an OP-ELH card in King George, VA Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6481&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070222T060001Z SUMMARY: 6621 NLR Layer 3 Backbone Circuits Spanning DENV-CHIC Maintenance Completed DTEND:20070222T120001Z DESCRIPTION:TICKET NUMBER: 6621\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-TULS-CHIC-10GE-97\nNLR-CHIC-HOUS-10GE-67\nNLR-DENV-CHIC-10GE-36\n\nSCHEDULED START TIME: Thursday, February 22, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, February 22, 2007, 12:00 PM (1200)\nDESCRIPTION:Level(3) Technicians spliced fiber in Chicago, IL. An hour long outage was expected, however no outages was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6621&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070220T060001Z SUMMARY: 6638 NLR Layer 3 Backbone Circuit DENV-HOUS Emergency Maintenance Completed DTEND:20070220T080001Z DESCRIPTION:TICKET NUMBER: 6638\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-HOUS-10GE-82\nNLR-DENV-CHIC-10GE-36\n\nSTART TIME: Tuesday, February 20, 2007, 6:06 AM (0606)\nEND TIME: Tuesday, February 20, 2007, 6:09 AM (0609)\nDESCRIPTION:NLR Layer 3 Backbone Circuit DENV-HOUS has undergone an emergency maintenance to install a new card in Bellevue, Nebraska. Outages were expected during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:06 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6638&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070220T061201Z SUMMARY: 6639 NLR Layer 3 Peer DREN Maintenance Completed DTEND:20070220T061901Z DESCRIPTION:TICKET NUMBER: 6639\nMAINTENANCE TYPE: Software\nAFFECTED: Peer DREN (CHIC)\n\nSTART TIME: Tuesday, February 20, 2007, 6:12 AM (0612)\nEND TIME: Tuesday, February 20, 2007, 6:19 AM (0619)\nDESCRIPTION:Peer DREN was briefly unavailable due to software maintenance.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6639&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061205T000001Z SUMMARY: 6499 NLR Layer 3 Peer Ultralight Monitoring turndown DTEND:20061205T000001Z DESCRIPTION:TICKET NUMBER: 6499\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSCHEDULED START TIME: Tuesday, December 5, 2006, 12:00 AM (0000)\nSCHEDULED END TIME: Tuesday, December 5, 2006, 12:00 AM (0000)\nDESCRIPTION:old ultralight sessions and interfaces admin shut down as previously arranged. close.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6499&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070807T040001Z SUMMARY: 7040 NLRLayer 3 Backbone Circuits Spanning CHIC-WASH Maintenance Completed DTEND:20070807T100001Z DESCRIPTION:TICKET NUMBER: 7040\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSCHEDULED START TIME: Tuesday, August 7, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, August 7, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 3's Fiber Provider spliced fiber along these routes. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7040&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070614T230001Z SUMMARY: 6922 NLR Layer 3 Peer DREN (CHIC) Maintenance DTEND:20070615T000001Z DESCRIPTION:TICKET NUMBER: 6922\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer DREN (CHIC)\n\nSTART TIME: Thursday, June 14, 2007, 11:42 PM (2342)\nEND TIME: Thursday, June 14, 2007, 11:52 PM (2352)\nDESCRIPTION:Peer DREN was briefly unavailable to the NLR Layer 3 Community. DREN Engineers report the outage was due to scheduled maintenance. Maintenance has been completed and service has been restored.DREN is multi-homed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6922&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061222T020001Z SUMMARY: 6527 NLR Layer 3 Peer CA*Net4 (SEAT) Maintenance Completed DTEND:20061222T040001Z DESCRIPTION:TICKET NUMBER: 6527\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CA*Net4 (SEAT)\n\nSTART TIME: Friday, December 22, 2006, 3:26 AM (0326)\nEND TIME: Friday, December 22, 2006, 3:29 AM (0329)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4 will perform JUNOS upgrades on their routers. The maintenance will last up to 2 hours, however traffic will reroute.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6527&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061212T030001Z SUMMARY: 6511 NLR Layer 3 Peer SURFnet Maintenace Completed DTEND:20061212T050001Z DESCRIPTION:TICKET NUMBER: 6511\nMAINTENANCE TYPE: Software\nAFFECTED: Peers SURFnet (NYCN)\n\nSTART TIME: Tuesday, December 12, 2006, 4:34 AM (0434)\nEND TIME: Tuesday, December 12, 2006, 4:37 AM (0437)\nDESCRIPTION:SURFnet performed a router upgrade. SURFnet is multihomed. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6511&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061215T130001Z SUMMARY: 6507 NLR Layer 3 Member PSC Maintenance Completed DTEND:20061215T140001Z DESCRIPTION:TICKET NUMBER: 6507\nMAINTENANCE TYPE: Software\nAFFECTED: Member PSC\n\nSCHEDULED START TIME: Friday, December 15, 2006, 1:00 PM (1300)\nSCHEDULED END TIME: Friday, December 15, 2006, 2:00 PM (1400)\nDESCRIPTION:Member PSC will be performing software upgrades on their Site Border Router. Brief outages are expected, however the entire maintenance window has been reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6507&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061213T192701Z SUMMARY: 6516 NLR Layer3 Member Case Western Emergency Maintenance Completed DTEND:20061214T220001Z DESCRIPTION:TICKET NUMBER: 6516\nMAINTENANCE TYPE: Software\nAFFECTED: NLR Layer3 Member Case Western\n\nSTART TIME: Wednesday, December 13, 2006, 7:27 PM (1927)\nEND TIME: Thursday, December 14, 2006, 4:31 AM (0431)\nDESCRIPTION:NLR Layer3 Member Case Western is performing emergency maintenance. The maintenance will be ongoing throughout the day. No ETA is currently available.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6516&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061206T080001Z SUMMARY: 6490 NLR Layer 3 CHIC-WASH and NEWY-CHIC Maintenance Completed DTEND:20061206T100001Z DESCRIPTION:TICKET NUMBER: 6490\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, December 6, 2006, 8:34 AM (0834)\nEND TIME: Wednesday, December 6, 2006, 8:40 AM (0840)\nDESCRIPTION:NLR L1 NOC Engineers worked with Level(3) technicians to replace a failing hardware at Chicago. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6490&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061221T140001Z SUMMARY: 6531 NLR Layer 3 Member Case Western Emergency Maintenance Completed DTEND:20061221T220001Z DESCRIPTION:TICKET NUMBER: 6531\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member Case Western (CHIC & NEWY)\n\nSCHEDULED START TIME: Thursday, December 21, 2006, 2:00 PM (1400)\nSCHEDULED END TIME: Thursday, December 21, 2006, 10:00 PM (2200)\nDESCRIPTION:Member Case Western will be performing emergency maintenance on their router. Case Western does not expect to be unavailable during the entire maintenance window. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6531&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061214T140001Z SUMMARY: 6512 NLR Layer3 Member UCAR Maintenance Completed DTEND:20061214T150001Z DESCRIPTION:TICKET NUMBER: 6512\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR Layer3 Member UCAR\n\nSCHEDULED START TIME: Thursday, December 14, 2006, 2:00 PM (1400)\nSCHEDULED END TIME: Thursday, December 14, 2006, 3:00 PM (1500)\nDESCRIPTION:NLR Layer3 Member UCAR will perform maintenance. A down time of 10 minutes is expected, however the entire window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6512&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061219T020001Z SUMMARY: 6518 NLR Layer 3 Peer CA*Net4 Maintenance Extended DTEND:20061219T043001Z DESCRIPTION:TICKET NUMBER: 6518\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Tuesday, December 19, 2006, 3:41 AM (0341)\nEND TIME: Tuesday, December 19, 2006, 3:44 AM (0344)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4 will perform JUNOS upgrades on all their backbone routers. A 3 minute outage per router is expected. ***Please note maintenance has been extended 30 minutes.***\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6518&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061220T113001Z SUMMARY: 6519 NLR Layer 3 Member PSC Maintenance Completed DTEND:20061220T123001Z DESCRIPTION:TICKET NUMBER: 6519\nMAINTENANCE TYPE: Software\nAFFECTED: Member PSC\n\nSTART TIME: Wednesday, December 20, 2006, 11:30 AM (1130)\nEND TIME: Wednesday, December 20, 2006, 11:39 AM (1139)\nDESCRIPTION:Member PSC vendor will be performing network maintenance on their site border router. Downtime can be expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6519&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061219T080001Z SUMMARY: 6525 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20061219T140001Z DESCRIPTION:TICKET NUMBER: 6525\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, December 19, 2006, 8:00 AM (0800)\nEND TIME: Tuesday, December 19, 2006, 11:14 AM (1114)\nDESCRIPTION:NLR backbone circuit LOSA-SEAT is undergoing emergency maintenance to move a fiber strand at UCSB. This should result in an entire outage of the route. The outage is expected to last three hours but the entire maintenance window is reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6525&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20061228T113001Z SUMMARY: 6526 NLR Layer 3 Member PSC Maintenance DTEND:20061228T123001Z DESCRIPTION:TICKET NUMBER: 6526\nMAINTENANCE TYPE: Software\nAFFECTED: Member PSC\n\nSTART TIME: Thursday, December 28, 2006, 11:41 AM (1141)\nEND TIME: Pending\nDESCRIPTION:Member PSC vendor will be performing network maintenance on their site border router. Downtime can be expected.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6526&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070112T060001Z SUMMARY: 6532 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Cancelled DTEND:20070112T120001Z DESCRIPTION:TICKET NUMBER: 6532\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSCHEDULED START TIME: Friday, January 12, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Friday, January 12, 2007, 12:00 PM (1200)\nDESCRIPTION:***Please Note This Maintenance Has Been Cancelled*** Level(3) technicians will be performing fiber splicing in Bernardo, NM. An outage of up to two hours is expected, however the entire maintenance window has been reserved. An alternate date of January 12th has also been reserved.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6532&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070111T080001Z SUMMARY: 6549 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070111T130001Z DESCRIPTION:TICKET NUMBER: 6549\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Thursday, January 11, 2007, 9:12 AM (0912)\nEND TIME: Thursday, January 11, 2007, 9:53 AM (0953)\nDESCRIPTION:NLR engineers, with the assistance of Level(3) will be performing a firmware upgrade. Outages can be expected. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6549&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070113T070001Z SUMMARY: 6539 NLR Layer 3 Backbone Circuits Spanning LOSA-DENV-HOUS Maintenance Completed DTEND:20070113T130001Z DESCRIPTION:TICKET NUMBER: 6539\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSTART TIME: Saturday, January 13, 2007, 7:03 AM (0703)\nEND TIME: Saturday, January 13, 2007, 7:05 AM (0705)\nDESCRIPTION:***Maintenance Completed*** NLR circuits spanning LOSA-DENV-HOUS will undergo maintenance. Level(3) will be splicing fibers in Tucson, AZ. No customer impact or service outages are expected.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6539&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070118T050001Z SUMMARY: 6543 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20070118T110001Z DESCRIPTION:TICKET NUMBER: 6543\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Thursday, January 18, 2007, 7:46 AM (0746)\nEND TIME: Thursday, January 18, 2007, 8:50 AM (0850)\nDESCRIPTION:NLR Route PITT-CLEV underwent maintenance. Level(3) spliced fibers in Pittsburgh PA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6543&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070110T060001Z SUMMARY: 6541 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20070110T120001Z DESCRIPTION:TICKET NUMBER: 6541\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSTART TIME: Wednesday, January 10, 2007, 7:45 AM (0745)\nEND TIME: Wednesday, January 10, 2007, 8:23 AM (0823)\nDESCRIPTION:NLR performed circuit maintenance (fiber cable relocation) in Socorro, NM. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6541&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070119T080001Z SUMMARY: 6544 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070119T140001Z DESCRIPTION:TICKET NUMBER: 6544\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Friday, January 19, 2007, 8:15 AM (0815)\nEND TIME: Friday, January 19, 2007, 8:47 AM (0847)\nDESCRIPTION:NLR Route PORT-SUNN underwent maintenance. Level(3) spliced fibers in Corning CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6544&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070118T080001Z SUMMARY: 6545 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070118T140001Z DESCRIPTION:TICKET NUMBER: 6545\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Thursday, January 18, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Thursday, January 18, 2007, 2:00 PM (1400)\nDESCRIPTION:NLR Route PORT-SUNN underwent maintenance. Level(3) spliced fibers in Corning CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6545&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070606T040001Z SUMMARY: 6890 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070606T080001Z DESCRIPTION:TICKET NUMBER: 6890\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, June 6, 2007, 5:46 AM (0546)\nEND TIME: Wednesday, June 6, 2007, 5:54 AM (0554)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Gluck, SC. A brief outage was expected. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6890&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070107T000101Z SUMMARY: 6547 NLR Layer 3 Member NCLR Resolved DTEND:20070107T030001Z DESCRIPTION:TICKET NUMBER: 6547\nMAINTENANCE TYPE: Software\nAFFECTED: Member NCLR\n\nSTART TIME: Sunday, January 7, 2007, 5:15 AM (0515)\nEND TIME: Sunday, January 7, 2007, 5:21 AM (0521)\nDESCRIPTION:NLR Layer 3 Member NCLR was briefly unavailable. NCLR Engineers report that the outage was due to scheduled maintenance.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6547&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070116T020001Z SUMMARY: 6555 NLR Layer 3 Backbone Circuit DENV-HOUS Maintenance Cancelled DTEND:20070116T090001Z DESCRIPTION:TICKET NUMBER: 6555\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Tuesday, January 16, 2007, 2:00 AM (0200)\nSCHEDULED END TIME: Tuesday, January 16, 2007, 9:00 AM (0900)\nDESCRIPTION:***Maintenance has been cancelled*** NLR Layer 1 engineering and Level 3 technicians will be performing maintenance at the Level(3) facility in Denver, CO to replace a faulty OP ELH card. The entire maintenance window has been reserved. \nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6555&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070117T100001Z SUMMARY: 6557 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070117T120001Z DESCRIPTION:TICKET NUMBER: 6557\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, January 17, 2007, 10:11 AM (1011)\nEND TIME: Wednesday, January 17, 2007, 10:13 AM (1013)\nDESCRIPTION:Level(3) technicians with the assistance of Layer 1 engineers replaced a malfunctioning card in Suisun City, Ca. Outages spanning the two hour maintenance window were expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6557&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070201T080001Z SUMMARY: 6577 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070201T130001Z DESCRIPTION:TICKET NUMBER: 6577\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Thursday, February 1, 2007, 8:16 AM (0816)\nEND TIME: Thursday, February 1, 2007, 8:33 AM (0833)\nDESCRIPTION:NLR L1 NOC Engineers, with the assistance of Level(3) technicians, performed firmware upgrades in Seattle, WA. Outages were expected throughout the maintenance window. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6577&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070116T110001Z SUMMARY: 6561 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20070116T130001Z DESCRIPTION:TICKET NUMBER: 6561\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Tuesday, January 16, 2007, 11:57 AM (1157)\nEND TIME: Tuesday, January 16, 2007, 11:58 AM (1158)\nDESCRIPTION:Level(3) technicians with the assistance of Layer 1 Engineers replaced a card in Phoenix, AZ. Outages were expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6561&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070130T103001Z SUMMARY: 6593 NLR Member CIC Participant Indiana GigaPOP Maintenance DTEND:20070130T120001Z DESCRIPTION:TICKET NUMBER: 6593\nMAINTENANCE TYPE: Power\nAFFECTED: Member: CIC Participant Indiana GigaPOP\n\nSTART TIME: Tuesday, January 30, 2007, 11:08 AM (1108)\nEND TIME: Pending\nDESCRIPTION:Indiana GigaPOP Engineers will be performing power maintenance. The maintenance will last about an hour, however the entire window has been reserved. \nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6593&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070123T110001Z SUMMARY: 6579 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Canceled DTEND:20070123T130001Z DESCRIPTION:TICKET NUMBER: 6579\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, January 23, 2007, 11:00 AM (1100)\nSCHEDULED END TIME: Tuesday, January 23, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR L1 NOC Engineering with the assistance of Level(3) technicians, will replace a malfunctioning card in Sacramento, CA. A brief outage is expected, however the entire maintenance window has been reserved. ***Please note Maintenance has been canceled***\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6579&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070114T050001Z SUMMARY: 6563 NLR Layer 3 Member NCREN Maintenance Completed DTEND:20070114T060001Z DESCRIPTION:TICKET NUMBER: 6563\nMAINTENANCE TYPE: Software\nAFFECTED: Member NCREN\n\nSTART TIME: Sunday, January 14, 2007, 5:02 AM (0502)\nEND TIME: Sunday, January 14, 2007, 5:41 AM (0541)\nDESCRIPTION:NCREN engineers will be performing maintenance on their router. A brief outage can be expected, however the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6563&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070118T080001Z SUMMARY: 6564 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070118T130001Z DESCRIPTION:TICKET NUMBER: 6564\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Thursday, January 18, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Thursday, January 18, 2007, 1:00 PM (1300)\nDESCRIPTION:***Maintenance Completed*** Layer 1 Engineers with the assistance of Level(3) technicians will be upgrading firmware along circuit 58. Brief outages are expected, however the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6564&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070118T040001Z SUMMARY: 6565 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Cancelled DTEND:20070118T100001Z DESCRIPTION:TICKET NUMBER: 6565\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Thursday, January 18, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, January 18, 2007, 10:00 AM (1000)\nDESCRIPTION:***Maintenance Has Been Cancelled*** NLR Layer 3 Backbone Circuit ATLA-HOUS will undergo fiber maintenance in Jacksonville, FL. An outage of up to 2 hours is expected however the entire maintenance window is reserved. Maintenance has been cancelled.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6565&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070914T050101Z SUMMARY: 7169 NLR Layer 3 Peer CA*Net 4 (CHIC) Emergency Maintenance Completed DTEND:20070914T110001Z DESCRIPTION:TICKET NUMBER: 7169\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSCHEDULED START TIME: Friday, September 14, 2007, 5:01 AM (0501)\nSCHEDULED END TIME: Friday, September 14, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 will be performing circuit relocation on their connection to NLR Layer 3. An outage of up to 30 minutes is expected. However, the entire maintenance window has been reserved. Traffic will reroute during the maintenance.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7169&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070619T050001Z SUMMARY: 6909 NLR Layer 3 Backbone Circuits Spanning KANS-TULS Maintenance Completed DTEND:20070619T080001Z DESCRIPTION:TICKET NUMBER: 6909\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\n\nSTART TIME: Tuesday, June 19, 2007, 4:31 AM (0431)\nEND TIME: Tuesday, June 19, 2007, 4:32 AM (0432)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have performed hardware maintenance in Kansas City, MO. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6909&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070223T050001Z SUMMARY: 6641 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20070223T060001Z DESCRIPTION:TICKET NUMBER: 6641\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Friday, February 23, 2007, 5:38 AM (0538)\nEND TIME: Friday, February 23, 2007, 6:06 AM (0606)\nDESCRIPTION:Peer SURFnet replaced a module in their border router. A brief outage occurred; however, the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6641&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070116T070001Z SUMMARY: 6571 NLR Layer 3 Backbone Circuit DENV-SEAT Emergency Maintenance Completed DTEND:20070116T090001Z DESCRIPTION:TICKET NUMBER: 6571\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, January 16, 2007, 7:05 AM (0705)\nEND TIME: Tuesday, January 16, 2007, 7:08 AM (0708)\nDESCRIPTION:NLR Layer 1 engineering and Level 3 technicians performed maintenance at the Level(3) facility in Denver, CO to replace a faulty OP ELH card. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6571&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070123T110001Z SUMMARY: 6566 NLR Member CIC Participant Indiana GigaPop Maintenance Completed DTEND:20070123T120001Z DESCRIPTION:TICKET NUMBER: 6566\nMAINTENANCE TYPE: Software\nAFFECTED: Member CIC Participant Indiana GigaPop\n\nSTART TIME: Tuesday, January 23, 2007, 11:09 AM (1109)\nEND TIME: Tuesday, January 23, 2007, 11:11 AM (1111)\nDESCRIPTION:Indiana GigaPop technicians performed a software upgrade on their equipment. This caused their connection to NLR PacketNet to be unavailable. A 5 to 10 minute outage was expected, however the entire maintenance window was reserved.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6566&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070124T210001Z SUMMARY: 6583 NLR Layer 3 Backbone Circuits Spanning CHIC-ATLA Maintenance Completed DTEND:20070125T050001Z DESCRIPTION:TICKET NUMBER: 6583\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-ATLA-WASH-10GE-64\nNLR-PITT-WASH-10GE-66\n\nSCHEDULED START TIME: Wednesday, January 24, 2007, 9:00 PM (2100)\nSCHEDULED END TIME: Thursday, January 25, 2007, 5:00 AM (0500)\nDESCRIPTION:***Maintenance Completed*** NLR Layer 1 NOC Engineering will be performing maintenance to install DWDM hardware in the Level(3) Virginia node to support additional circuit deployments. No interruption of service is expected, however the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6583&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070125T080001Z SUMMARY: 6567 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070125T130001Z DESCRIPTION:TICKET NUMBER: 6567\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Thursday, January 25, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Thursday, January 25, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR NOC Engineering was upgrading firmware along the DENV-SEAT Backbone. No outages were expected, however the entire maintenance window has been reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6567&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070203T090001Z SUMMARY: 6570 NLR Layer 3 Peers CA*net4 and KREONet2 via Pacific Wave (SEAT) Maintenance Completed DTEND:20070203T140001Z DESCRIPTION:TICKET NUMBER: 6570\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR Layer 3 Peers CA*net4 via PacWave & KREONET2\n\n\nSCHEDULED START TIME: Saturday, February 3, 2007, 9:00 AM (0900)\nSCHEDULED END TIME: Saturday, February 3, 2007, 2:00 PM (1400)\nDESCRIPTION:NLR Layer 3 Peer CA*net4 performed maintenance on their circuit. An outage of up to 15 minutes was expected. Peers CA*net4 and KREONet are multi-homed.\nTIMESTAMP: Sat Nov 7 11:03:07 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6570&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070124T170001Z SUMMARY: 6581 NLR Layer 3 Backbone Circuits Spanning NEWY-DENV Maintenance Completed DTEND:20070125T010001Z DESCRIPTION:TICKET NUMBER: 6581\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-STAR-10GE-126\nNLR-NEWY-CHIC-10GE-100\nNLR-TULS-CHIC-10GE-97\nNLR-CHIC-HOUS-10GE-67\nNLR-CHIC-CLEV-10GE-65\nNLR-CHIC-WASH-10GE-59\nNLR-DENV-CHIC-10GE-36\n\nSCHEDULED START TIME: Wednesday, January 24, 2007, 5:00 PM (1700)\nSCHEDULED END TIME: Thursday, January 25, 2007, 1:00 AM (0100)\nDESCRIPTION:NLR L1 NOC Engineering with the assistance of Level(3) technicians will be installing equipment in Chicago, IL. No services should be affected, however the entire maintenance window has been reserved. ***Maintenance has been completed.***\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6581&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070208T070001Z SUMMARY: 6616 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070208T080001Z DESCRIPTION:TICKET NUMBER: 6616\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Thursday, February 8, 2007, 7:00 AM (0700)\nSCHEDULED END TIME: Thursday, February 8, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR L1 NOC Engineering performed firmware upgrades in Seattle. No impact was anticipated however the entire maintenance window is reserved. This maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6616&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070124T060001Z SUMMARY: 6582 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20070124T070001Z DESCRIPTION:TICKET NUMBER: 6582\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Wednesday, January 24, 2007, 6:30 AM (0630)\nEND TIME: Wednesday, January 24, 2007, 6:50 AM (0650)\nDESCRIPTION:NLR L1 NOC Engineering with the assistance of Level(3) technicians replaced a failing card in Alpine, TX. A brief outage was expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6582&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070130T160001Z SUMMARY: 6585 NLR Layer 3 Backbone Circuits Spanning CHIC-NEWY Maintenance Completed DTEND:20070130T235901Z DESCRIPTION:TICKET NUMBER: 6585\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-PITT-WASH-10GE-66\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, January 30, 2007, 4:00 PM (1600)\nSCHEDULED END TIME: Tuesday, January 30, 2007, 11:59 PM (2359)\nDESCRIPTION:NLR L1 NOC Engineering with the assistance of Level(3) technicians will be installing equipment in Pittsburgh, PA. No service outages are expected, however the entire maintenance window has been reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6585&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070130T180001Z SUMMARY: 6594 NLR Layer 3 Backbone Circuit CHIC-STAR Maintenance Completed DTEND:20070131T020001Z DESCRIPTION:TICKET NUMBER: 6594\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-STAR-10GE-126\n\nSCHEDULED START TIME: Tuesday, January 30, 2007, 6:00 PM (1800)\nSCHEDULED END TIME: Wednesday, January 31, 2007, 2:00 AM (0200)\nDESCRIPTION:NLR NOC L1 Engineering with the assistance of Level(3) technicians, will be installing equipment in Chicago, IL. No outages are expected, however the entire maintenance window has been reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6594&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070130T120001Z SUMMARY: 6595 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20070130T130001Z DESCRIPTION:TICKET NUMBER: 6595\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Tuesday, January 30, 2007, 12:19 PM (1219)\nEND TIME: Tuesday, January 30, 2007, 1:01 PM (1301)\nDESCRIPTION:NLR NOC Layer 1 engineers, with the assistance of a Level (3) communications technician, will be replacing a card in Los Angeles, CA. Outages are expected during the maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6595&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070127T040001Z SUMMARY: 6596 NLR Layer 3 Peers CA*Net 4 (CHIN) and KREONet2 (SEAT) Emergency Maintenance Completed DTEND:20070127T060001Z DESCRIPTION:TICKET NUMBER: 6596\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peers CA*Net4 and KREONet2 (SEAT)\n\nSTART TIME: Saturday, January 27, 2007, 4:10 AM (0410)\nEND TIME: Saturday, January 27, 2007, 4:24 AM (0424)\nDESCRIPTION:Peers CA*Net4 and KREONet2 (SEAT) were unavailable to the NLR Layer 3 Community due to emergency maintenance. Thirty minutes of downtime period was expected, however, the entire window is reserved. Maintenance has been completed. CA*Net4 and KREONet2 (SEAT) are multihomed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6596&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070205T180001Z SUMMARY: 6603 NLR Layer 3 Backbone Circuits Spanning DENV-CHIC Maintenance Completed DTEND:20070206T020001Z DESCRIPTION:TICKET NUMBER: 6603\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36 \nNLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Monday, February 5, 2007, 6:00 PM (1800)\nSCHEDULED END TIME: Tuesday, February 6, 2007, 2:00 AM (0200)\nDESCRIPTION:NLR Layer 1 NOC Engineering with the assistance of Level(3) Communications Technicians, will be installing hardware in Kansas City, MO to support the turn-up of Circuit 163. No outages are expected, however the entire maintenance window has been reserved. No outage detected.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6603&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070131T180001Z SUMMARY: 6599 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070201T020001Z DESCRIPTION:TICKET NUMBER: 6599\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, January 31, 2007, 6:00 PM (1800)\nSCHEDULED END TIME: Thursday, February 1, 2007, 2:00 AM (0200)\nDESCRIPTION:NLR NOC Layer 1 engineering with assistance from vendor, PNWGP, will be installing additional equipment in Seattle, WA. No disruption to traffic is expected during the maintenance window. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6599&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070220T110001Z SUMMARY: 6607 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070220T130001Z DESCRIPTION:TICKET NUMBER: 6607\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, February 20, 2007, 11:03 AM (1103)\nEND TIME: Tuesday, February 20, 2007, 11:05 AM (1105)\nDESCRIPTION:NLR Layer 1 NOC Engineering with the assistance of a Level(3) Communications Technician, replaced a card in Oakland, CA. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6607&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070225T040001Z SUMMARY: 6628 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070225T050001Z DESCRIPTION:TICKET NUMBER: 6628\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Sunday, February 25, 2007, 4:47 AM (0447)\nEND TIME: Sunday, February 25, 2007, 6:03 AM (0603)\nDESCRIPTION:NLR NOC Layer 1 Engineers, with the assistance of a Level (3) Communications technician, replaced a card in Atlanta, GA. Outages were expected during the maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6628&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070225T060001Z SUMMARY: 6629 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070225T100001Z DESCRIPTION:TICKET NUMBER: 6629\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Sunday, February 25, 2007, 6:32 AM (0632)\nEND TIME: Sunday, February 25, 2007, 6:51 AM (0651)\nDESCRIPTION:NLR NOC Layer 1 engineers, with the assistance of a Level (3) communications technician, replaced a card in Jacksonville, FL. Outages were expected during the maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6629&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070301T100001Z SUMMARY: 6652 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070301T130001Z DESCRIPTION:TICKET NUMBER: 6652\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, March 1, 2007, 11:15 AM (1115)\nEND TIME: Thursday, March 1, 2007, 12:05 PM (1205)\nDESCRIPTION:NLR Engineers will be upgrading firmware on the 15808 on the LOSA-SEAT Route. Outages are expected during this maintenance. Please note corrected date. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6652&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070227T080001Z SUMMARY: 6642 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070227T100001Z DESCRIPTION:TICKET NUMBER: 6642\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, February 27, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Tuesday, February 27, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering with the assistance of a Level(3) Communications Technician, performed maintenance on a faulty card in Sacramento, CA. A brief outage was expected, however no outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6642&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070223T080101Z SUMMARY: 6644 NLR Layer 3 Exchange Point Pacific Wave (LOSA) Maintenance Completed DTEND:20070223T140001Z DESCRIPTION:TICKET NUMBER: 6644\nMAINTENANCE TYPE: Software\nAFFECTED: Peer Singaren (LOSA)\n\nSTART TIME: Friday, February 23, 2007, 9:35 AM (0935)\nEND TIME: Friday, February 23, 2007, 9:36 AM (0936)\nDESCRIPTION:NLR Exchange Point Pacific Wave, upgraded software in Los Angeles. A downtime of 30 minutes was expected, however the entire window has been reserved. Please note the corrected maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6644&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070222T113001Z SUMMARY: 6645 NLR Layer 3 Member PSC Maintenance ***Tracking*** DTEND:20070222T000001Z DESCRIPTION:TICKET NUMBER: 6645\nMAINTENANCE TYPE: Software\nAFFECTED: Member PSC\n\nSCHEDULED START TIME: Thursday, February 22, 2007, 11:30 AM (1130)\nSCHEDULED END TIME: Thursday, February 22, 2007, 12:00 AM (0000)\nDESCRIPTION:NLR Layer 3 Member PSC will be performing emergency maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6645&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070223T000001Z SUMMARY: 6647 NLR Layer 3 Member MATP Maintenance Cancelled DTEND:20070223T003001Z DESCRIPTION:TICKET NUMBER: 6647\nMAINTENANCE TYPE: Software\nAFFECTED: Member MATP Connections\n\nSCHEDULED START TIME: Friday, February 23, 2007, 12:00 AM (0000)\nSCHEDULED END TIME: Friday, February 23, 2007, 12:30 AM (0030)\nDESCRIPTION:MATP has cancelled this maintenance. It will be scheduled at a later date.Mid-Atlantic Terascale Partnership Engineers will be upgrading software on their router. Outages may be experienced during the maintenance window. \nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6647&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070228T110001Z SUMMARY: 6648 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070228T130001Z DESCRIPTION:TICKET NUMBER: 6648\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, February 28, 2007, 11:24 AM (1124)\nEND TIME: Wednesday, February 28, 2007, 11:27 AM (1127)\nDESCRIPTION:NLR Layer 1 NOC Engineering with the assistance of a PNWGP Network Technician, replaced a faulty card in Seattle, WA. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6648&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070627T040001Z SUMMARY: 6921 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070627T060001Z DESCRIPTION:TICKET NUMBER: 6921\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Wednesday, June 27, 2007, 4:24 AM (0424)\nEND TIME: Wednesday, June 27, 2007, 4:28 AM (0428)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Baxley, GA. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6921&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070228T110001Z SUMMARY: 6649 NLR Layer 3 IXP Pacific Wave (STTL) Maintenance Completed DTEND:20070228T130001Z DESCRIPTION:TICKET NUMBER: 6649\nMAINTENANCE TYPE: Hardware\nAFFECTED: IXP Pacific Wave (STTL)\n\nSTART TIME: Wednesday, February 28, 2007, 11:24 AM (1124)\nEND TIME: Wednesday, February 28, 2007, 11:27 AM (1127)\nDESCRIPTION:IXP Pacific Wave was unavailable to the NLR Layer 3 Community as Pacific Wave Engineers replaced a bad card in Seattle. A brief outage was expected, however, the entire maintenance window was reserved. Pacific Wave is multi-homed. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6649&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070227T080001Z SUMMARY: 6650 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070227T130001Z DESCRIPTION:TICKET NUMBER: 6650\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, February 27, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Tuesday, February 27, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 NOC Engineering will be performing firmware upgrades on the LOSA-SEAT Backbone. No outage is expected. However, the entire maintenance window is reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6650&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070304T110001Z SUMMARY: 6661 NLR Layer 3 Member FLR Maintenance Completed DTEND:20070304T140001Z DESCRIPTION:TICKET NUMBER: 6661\nMAINTENANCE TYPE: Software\nAFFECTED: Connections to Member FLR\n\nSTART TIME: Sunday, March 4, 2007, 11:21 AM (1121)\nEND TIME: Sunday, March 4, 2007, 11:25 AM (1125)\nDESCRIPTION:NLR Layer 3 Member FLR performed maintenance on their core routers.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6661&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070301T070001Z SUMMARY: 6662 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070301T100001Z DESCRIPTION:TICKET NUMBER: 6662\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, March 1, 2007, 7:15 AM (0715)\nEND TIME: Thursday, March 1, 2007, 9:44 AM (0944)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6662&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070302T070001Z SUMMARY: 6663 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070302T110001Z DESCRIPTION:TICKET NUMBER: 6663\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Friday, March 2, 2007, 7:13 AM (0713)\nEND TIME: Friday, March 2, 2007, 9:41 AM (0941)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed circuit maintenance. The entire window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6663&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070301T110001Z SUMMARY: 6659 NLR Layer 3 Peer NREN Emergency Maintenance Completed DTEND:20070301T140001Z DESCRIPTION:TICKET NUMBER: 6659\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer NREN's Connections in SUNN\n\nSCHEDULED START TIME: Thursday, March 1, 2007, 11:00 AM (1100)\nSCHEDULED END TIME: Thursday, March 1, 2007, 2:00 PM (1400)\nDESCRIPTION:NLR Layer 2/3 NOC Engineers, with the assistance of a Level(3) Communications Technician, performed emergency maintenance in Sunnyvale, CA. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6659&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070301T110001Z SUMMARY: 6660 NLR Layer 3 Member CENIC Emergency Maintenance Completed DTEND:20070301T140001Z DESCRIPTION:TICKET NUMBER: 6660\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member CENIC's Connection in SUNN\n\nSCHEDULED START TIME: Thursday, March 1, 2007, 11:00 AM (1100)\nSCHEDULED END TIME: Thursday, March 1, 2007, 2:00 PM (1400)\nDESCRIPTION:NLR Layer 2/3 NOC Engineers, with the assistance of a Level(3) Communications Technician, performed emergency maintenance in Sunnyvale, CA. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6660&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070306T160001Z SUMMARY: 6658 NLR Layer 3 Backbone Circuit CHIC-STAR Maintenance Completed DTEND:20070306T180001Z DESCRIPTION:TICKET NUMBER: 6658\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-STAR-10GE-126\n\nSCHEDULED START TIME: Tuesday, March 6, 2007, 4:00 PM (1600)\nSCHEDULED END TIME: Tuesday, March 6, 2007, 6:00 PM (1800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician will be installing equipment in Chicago, IL to support the turn-up of a new circuit. No outages are expected during this maintenance. However, the entire maintenance window has been reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6658&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070306T050001Z SUMMARY: 6670 NLR Layer 3 Backbone Circuits CHIC-WASH, CHIC-CLEV, and NEWY-CHIC Emergency Maintenance Completed DTEND:20070306T070001Z DESCRIPTION:TICKET NUMBER: 6670\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\nNLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\n\nSTART TIME: Tuesday, March 6, 2007, 4:59 AM (0459)\nEND TIME: Tuesday, March 6, 2007, 5:16 AM (0516)\nDESCRIPTION:NLR Layer 3 Backbone Circuits CHIC-WASH, CHIC-CLEV, and NEWY-CHIC under went emergency maintenance to replace a card in Cleveland, Ohio. Outages were anticipated during this maintenance. The entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6670&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070623T123001Z SUMMARY: 6907 NLR Layer 3 Member UCAR Maintenance DTEND:20070623T133001Z DESCRIPTION:TICKET NUMBER: 6907\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member UCAR Connection\n\nSCHEDULED START TIME: Saturday, June 23, 2007, 12:30 PM (1230)\nSCHEDULED END TIME: Saturday, June 23, 2007, 1:30 PM (1330)\nDESCRIPTION:NLR Layer 3 Member UCAR will be performing hardware maintenance during the above time frame. Their connections to PacketNet will be unavailable. A 15 minute outage is expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6907&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070314T090001Z SUMMARY: 6673 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070314T120001Z DESCRIPTION:TICKET NUMBER: 6673\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, March 14, 2007, 9:00 AM (0900)\nSCHEDULED END TIME: Wednesday, March 14, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have upgraded firmware along the PORT-SUNN route. No disruption in service occurred.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6673&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070604T060001Z SUMMARY: 6886 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070604T100001Z DESCRIPTION:TICKET NUMBER: 6886\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Monday, June 4, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Monday, June 4, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have upgraded firmware along the Seattle, WA to Ogden, UT path. No outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6886&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070415T040001Z SUMMARY: 6789 NLR Layer 3 Member NCLR Emergency Maintenance Completed DTEND:20070415T050001Z DESCRIPTION:TICKET NUMBER: 6789\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member NCLR\n\nSTART TIME: Sunday, April 15, 2007, 4:13 AM (0413)\nEND TIME: Sunday, April 15, 2007, 4:17 AM (0417)\nDESCRIPTION:Member NCLR was unavailable the the NLR Layer 3 Community as NCLR Engineers performed circuit maintenance. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6789&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070420T100001Z SUMMARY: 6792 NLR Layer 3 IXP Starlight Maintenance Completed DTEND:20070420T103001Z DESCRIPTION:TICKET NUMBER: 6792\nMAINTENANCE TYPE: Software\nAFFECTED: IXP Starlight\n\nSTART TIME: Friday, April 20, 2007, 10:00 AM (1000)\nEND TIME: Friday, April 20, 2007, 10:06 AM (1006)\nDESCRIPTION:IXP Starlight was unavailable to the NLR Layer 3 Community as Starlight engineers performed software maintenance. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6792&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070306T090001Z SUMMARY: 6666 NLR Layer 3 Backbone Circuits Spanning CHIC-NEWY Maintenance Completed DTEND:20070306T113001Z DESCRIPTION:TICKET NUMBER: 6666\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, March 6, 2007, 10:33 AM (1033)\nEND TIME: Tuesday, March 6, 2007, 10:38 AM (1038)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a faulty card in Detroit, MI. A brief disruption of service was expected. However, the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6666&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070822T070001Z SUMMARY: 7111 NLR Layer 3 Peer redCLARA Emergency Maintenance Completed DTEND:20070825T010001Z DESCRIPTION:TICKET NUMBER: 7111\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer redCLARA\n\nSTART TIME: Wednesday, August 22, 2007, 8:55 AM (0855)\nEND TIME: Wednesday, August 22, 2007, 9:20 AM (0920)\nDESCRIPTION:Peer redCLARA's fiber provider performed emergency maintenance. Brief outages were expected. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7111&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070313T110001Z SUMMARY: 6672 NLR Layer 3 Backbone Circuit ELPA-LOSA Maintenance Completed DTEND:20070313T130001Z DESCRIPTION:TICKET NUMBER: 6672\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ELPA-LOSA-10GE-87\n\nSTART TIME: Tuesday, March 13, 2007, 10:06 AM (1006)\nEND TIME: Tuesday, March 13, 2007, 10:25 AM (1025)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of an Equinix technician, replaced a card in Los Angeles, CA. A brief outage was expected, however the entire maintenance window was reserved. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6672&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070321T040001Z SUMMARY: 6714 NLR Layer 3 Backbone Circuit WASH-NEWY Emergency Maintenance Completed DTEND:20070321T120001Z DESCRIPTION:TICKET NUMBER: 6714\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSTART TIME: Wednesday, March 21, 2007, 5:48 AM (0548)\nEND TIME: Wednesday, March 21, 2007, 6:06 AM (0606)\nDESCRIPTION:Circuit provider Level (3) performed emergency maintenance on the NLR Route WASH-NEWY. An outage of 15 minutes was expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6714&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070316T040001Z SUMMARY: 6696 NLR Layer 3 Member CIC-OmniPoP Emergency Maintenance Completed DTEND:20070316T060001Z DESCRIPTION:TICKET NUMBER: 6696\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member CIC-OmniPoP\n\nSTART TIME: Friday, March 16, 2007, 4:17 AM (0417)\nEND TIME: Friday, March 16, 2007, 6:11 AM (0611)\nDESCRIPTION:Indiana GigaPOP Engineers with assistance from HP technicians performed hardware maintenance. Connectivity to CIC-OmniPoP was unavailable during this time frame. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6696&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070319T050001Z SUMMARY: 6692 NLR Layer 3 Backbone Circuit CHIC-HOUS Maintenance Completed DTEND:20070319T100001Z DESCRIPTION:TICKET NUMBER: 6692\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\n\nSTART TIME: Monday, March 19, 2007, 6:28 AM (0628)\nEND TIME: Monday, March 19, 2007, 6:41 AM (0641)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced cards in Dallas, TX. Brief outages had occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6692&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070328T080001Z SUMMARY: 6716 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070328T100001Z DESCRIPTION:TICKET NUMBER: 6716\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Wednesday, March 28, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Wednesday, March 28, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician replaced a faulty card in Gluck, SC. No outage was incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:08 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6716&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070321T060001Z SUMMARY: 6701 NLR Layer 3 Backbone Circuit DENV-HOUS Maintenance Completed DTEND:20070321T080001Z DESCRIPTION:TICKET NUMBER: 6701\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Wednesday, March 21, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Wednesday, March 21, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failed card in Howe, NE. No outages had occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6701&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070320T040001Z SUMMARY: 6706 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20070320T090001Z DESCRIPTION:TICKET NUMBER: 6706\nMAINTENANCE TYPE: Software\nAFFECTED: Peer SURFnet\n\nSTART TIME: Tuesday, March 20, 2007, 6:35 AM (0635)\nEND TIME: Tuesday, March 20, 2007, 6:39 AM (0639)\nDESCRIPTION:Peer SURFnet engineers performed a software maintenance. Peer Surfnet was briefly unavailable during this time.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6706&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070417T040001Z SUMMARY: 6774 NLR Layer 3 Router WASH Maintenance Completed DTEND:20070417T070001Z DESCRIPTION:TICKET NUMBER: 6774\nMAINTENANCE TYPE: Hardware\nAFFECTED: PSC\nMATP\nNeLR\nNCLR\nwash.layer3.nlr.net;\nSTART TIME: Tuesday, April 17, 2007, 4:09 AM (0409)\nEND TIME: Tuesday, April 17, 2007, 5:20 AM (0520)\nDESCRIPTION:NLR Layer 3 Engineers have performed hardware maintenance on the WASH-CRS. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6774&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070322T120001Z SUMMARY: 6704 NLR Layer 3 Core Node NEWY Maintenance (non-impacting) DTEND:20070323T220001Z DESCRIPTION:TICKET NUMBER: 6704\nMAINTENANCE TYPE: Hardware\nAFFECTED: Core Node New York\nnewy.layer3.nlr.net;\nSCHEDULED START TIME: Thursday, March 22, 2007, 12:00 PM (1200)\nSCHEDULED END TIME: Friday, March 23, 2007, 10:00 PM (2200)\nDESCRIPTION:NLR NOC Layer 3 engineers with the assistance of NYSERnet engineers replaced two cards. Neither card caused a disruption to service.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6704&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070418T040001Z SUMMARY: 6775 NLR Layer 3 Router ATLA Maintenance Completed DTEND:20070418T070001Z DESCRIPTION:TICKET NUMBER: 6775\nMAINTENANCE TYPE: Hardware\nAFFECTED: SLR\nNCLR\nFLR\natla.layer3.nlr.net;\nSTART TIME: Wednesday, April 18, 2007, 4:22 AM (0422)\nEND TIME: Wednesday, April 18, 2007, 5:23 AM (0523)\nDESCRIPTION:NLR Layer 3 Engineers have performed hardware maintenance on the ATLA-CRS. Brief outages had occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6775&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070322T040001Z SUMMARY: 6705 NLR Layer 3 Router NEWY Emergency Maintenance Completed DTEND:20070322T090001Z DESCRIPTION:TICKET NUMBER: 6705\nMAINTENANCE TYPE: Software\nAFFECTED: All Layer 3 Members/Peers on NEWY\nnewy.layer3.nlr.net;\nSTART TIME: Thursday, March 22, 2007, 4:26 AM (0426)\nEND TIME: Thursday, March 22, 2007, 7:02 AM (0702)\nDESCRIPTION:NLR Layer 3 Engineers have performed software maintenance on the NEWY-CRS. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6705&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070323T070101Z SUMMARY: 6709 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070323T100001Z DESCRIPTION:TICKET NUMBER: 6709\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Friday, March 23, 2007, 7:41 AM (0741)\nEND TIME: Friday, March 23, 2007, 9:56 AM (0956)\nDESCRIPTION:NLR NOC Layer 1 engineers performed testing between Lompoc, CA and San Luis Obispo, CA. The maintenance was expected to last most of the maintenance window. This caused loss of connectivity to the NLR Network. Maintenance has bee completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6709&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070322T070101Z SUMMARY: 6711 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070322T130001Z DESCRIPTION:TICKET NUMBER: 6711\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, March 22, 2007, 7:01 AM (0701)\nEND TIME: Thursday, March 22, 2007, 7:27 AM (0727)\nDESCRIPTION:NLR Layer 1 NOC Engineering replaced a card along the PORT-SUNN route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6711&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070321T040001Z SUMMARY: 6713 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070321T060001Z DESCRIPTION:TICKET NUMBER: 6713\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, March 21, 2007, 4:03 AM (0403)\nEND TIME: Wednesday, March 21, 2007, 5:43 AM (0543)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a faulty card in King George, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6713&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070410T070001Z SUMMARY: 6757 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070410T100001Z DESCRIPTION:TICKET NUMBER: 6757\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Tuesday, April 10, 2007, 7:00 AM (0700)\nSCHEDULED END TIME: Tuesday, April 10, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced cards in Pensacola, FL. No outage had occurred due to the card had previously been replaced. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6757&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070322T050101Z SUMMARY: 6715 NLR Layer 3 Backbone Circuit HOUS-LOSA Emergency Maintenance Completed DTEND:20070322T230101Z DESCRIPTION:TICKET NUMBER: 6715\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Wednesday, March 21, 2007, 10:18 AM (1018)\nEND TIME: Wednesday, March 21, 2007, 10:50 AM (1050)\nDESCRIPTION:NLR Layer 3 Backbone Circuit HOUS-LOSA underwent emergency maintenance to splice dark fiber by Level(3) Communications. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6715&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070328T050001Z SUMMARY: 6718 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20070328T110001Z DESCRIPTION:TICKET NUMBER: 6718\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSCHEDULED START TIME: Wednesday, March 28, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, March 28, 2007, 11:00 AM (1100)\nDESCRIPTION:Level(3) Communications performed verification and fiber splicing in Bernardo, NM. Outages were expected throughout the maintenance window, however outages did not occur. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6718&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070820T040001Z SUMMARY: 7106 NLR Layer 3 Member NCREN Emergency Maintenance Completed DTEND:20070820T050001Z DESCRIPTION:TICKET NUMBER: 7106\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member NCREN\n\nSTART TIME: Monday, August 20, 2007, 4:05 AM (0405)\nEND TIME: Monday, August 20, 2007, 4:12 AM (0412)\nDESCRIPTION:NCREN engineers have performed maintenance on their fibers. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7106&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070409T070001Z SUMMARY: 6749 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20070409T110001Z DESCRIPTION:TICKET NUMBER: 6749\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Monday, April 9, 2007, 7:17 AM (0717)\nEND TIME: Monday, April 9, 2007, 7:17 AM (0717)\nDESCRIPTION:NLRLayer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced cards in Phoenix, AZ. Outages were expected during the maintenance window. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6749&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070410T040001Z SUMMARY: 6744 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070410T060001Z DESCRIPTION:TICKET NUMBER: 6744\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Tuesday, April 10, 2007, 4:11 AM (0411)\nEND TIME: Tuesday, April 10, 2007, 4:44 AM (0444)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a card in Bogart, GA. Maintenance was completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6744&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070327T190001Z SUMMARY: 6736 NLR Layer 3 Peer CA*Net4 (CHIC) Maintenance Completed DTEND:20070327T210001Z DESCRIPTION:TICKET NUMBER: 6736\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net4 via CHIC (Winnipeg & Toronto)\n\nSTART TIME: Tuesday, March 27, 2007, 8:14 PM (2014)\nEND TIME: Tuesday, March 27, 2007, 8:21 PM (2021)\nDESCRIPTION:NLR Layer 3 Peer CA*net 4 has rescheduled maintenance to troubleshoot metro fiber issues. The maintenance is expected to last most of the scheduled window. Peer is multihomed. Please note maintenance has been extended. The maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6736&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070328T040001Z SUMMARY: 6726 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070328T060001Z DESCRIPTION:TICKET NUMBER: 6726\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, March 28, 2007, 4:32 AM (0432)\nEND TIME: Wednesday, March 28, 2007, 5:46 AM (0546)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Bogart, GA. Brief outages have occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6726&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070412T040001Z SUMMARY: 6769 NLR Layer 3 Router HOUS Emergency Maintenance Completed DTEND:20070412T070001Z DESCRIPTION:TICKET NUMBER: 6769\nMAINTENANCE TYPE: Hardware\nAFFECTED: LEARN\nLONI\nOklahoma\nNew Mexico\nhous.layer3.nlr.net;\nSTART TIME: Thursday, April 12, 2007, 4:10 AM (0410)\nEND TIME: Thursday, April 12, 2007, 6:23 AM (0623)\nDESCRIPTION:NLR Layer 3 Engineers have performed hardware maintenance on the HOUS-CRS. Outage(s) had occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6769&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070327T050001Z SUMMARY: 6727 NLR Layer 3 Backbone Circuits Spanning LOSA-HOUS Maintenance Completed DTEND:20070327T100001Z DESCRIPTION:TICKET NUMBER: 6727\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSTART TIME: Tuesday, March 27, 2007, 5:10 AM (0510)\nEND TIME: Tuesday, March 27, 2007, 5:18 AM (0518)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced cards in El Paso, TX. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6727&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070612T050001Z SUMMARY: 6896 NLR Layer 3 Circuits Spanning CHIC-NEWY Maintenance Cancelled DTEND:20070612T080001Z DESCRIPTION:TICKET NUMBER: 6896\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, June 12, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, June 12, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Chicago, IL. A two(2) hour outage is expected. However, the entire maintenance window has been reserved. Please note, this maintenance has been cancelled.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6896&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070322T030001Z SUMMARY: 6728 NLR Layer 3 Peer CLARA Emergency Maintenance Completed DTEND:20070322T050001Z DESCRIPTION:TICKET NUMBER: 6728\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CLARA\n\nSCHEDULED START TIME: Thursday, March 22, 2007, 3:00 AM (0300)\nSCHEDULED END TIME: Thursday, March 22, 2007, 5:00 AM (0500)\nDESCRIPTION:A circuit provider, LANautilus, performed emergency maintenance to replace a failing card causing errors along the path. The outage was expected to be brief; however, the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6728&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070325T113001Z SUMMARY: 6731 NLR Layer 3 Member OneNet Maintenance Completed DTEND:20070326T020001Z DESCRIPTION:TICKET NUMBER: 6731\nMAINTENANCE TYPE: Power\nAFFECTED: Member OneNet's PacketNet Connections\n\nSCHEDULED START TIME: Sunday, March 25, 2007, 11:30 AM (1130)\nSCHEDULED END TIME: Monday, March 26, 2007, 2:00 AM (0200)\nDESCRIPTION:NLR PacketNet Member OneNet will be performing a power upgrade on their equipment. They will be unavailable to the NLR PacketNet community during the maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6731&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070326T060001Z SUMMARY: 6732 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20070326T080001Z DESCRIPTION:TICKET NUMBER: 6732\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSTART TIME: Monday, March 26, 2007, 6:17 AM (0617)\nEND TIME: Monday, March 26, 2007, 6:22 AM (0622)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced cards in Denver, CO. Outages were expected during the maintenance window. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6732&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070323T190001Z SUMMARY: 6733 NLR Layer 3 Peer CA*Net4 Emergency Maintenance Completed DTEND:20070323T210001Z DESCRIPTION:TICKET NUMBER: 6733\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CA*Net4 Connections\n\nSCHEDULED START TIME: Friday, March 23, 2007, 7:00 PM (1900)\nSCHEDULED END TIME: Friday, March 23, 2007, 9:00 PM (2100)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4 will be performing intrusive testing on their connections to NLR. They will be unavailable to the NLR Community during the maintenance window. A 45 minute outage is expected, however the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6733&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070402T050001Z SUMMARY: 6734 NLR Layer 3 Backbone Circuits Spanning LOSA-CHIC Maintenance Completed DTEND:20070402T100001Z DESCRIPTION:TICKET NUMBER: 6734\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-ATLA-HOUS-10GE-70\nNLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Monday, April 2, 2007, 5:17 AM (0517)\nEND TIME: Monday, April 2, 2007, 5:22 AM (0522)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced several cards in Houston, TX. Brief outages have occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6734&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070329T010001Z SUMMARY: 6745 NLR Layer 3 Peer CA*Net4 (CHIC) Maintenance Completed DTEND:20070330T035901Z DESCRIPTION:TICKET NUMBER: 6745\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net4 via CHIC (Winnipeg & Toronto)\n\nSTART TIME: Thursday, March 29, 2007, 2:03 AM (0203)\nEND TIME: Thursday, March 29, 2007, 2:06 AM (0206)\nDESCRIPTION:Peer CA*net4 was unavailable to the NLR Layer 3 Community. A 5 minute outage was expected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6745&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070403T050001Z SUMMARY: 6739 NLR PacketNet Terminal KANS Maintenance Completed DTEND:20070403T090001Z DESCRIPTION:TICKET NUMBER: 6739\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Tuesday, April 3, 2007, 5:00 AM (0500)\nEND TIME: Tuesday, April 3, 2007, 5:06 AM (0506)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced cards in Kansas City, MO. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6739&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070327T100001Z SUMMARY: 6740 NLR Layer 3 Peer ESnet (CHIC) Maintenance DTEND:20070328T000101Z DESCRIPTION:TICKET NUMBER: 6740\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer ESNet\n\nSTART TIME: Tuesday, March 27, 2007, 10:06 PM (2206)\nEND TIME: Tuesday, March 27, 2007, 6:33 PM (1833)\nDESCRIPTION:NLR Layer 3 Peer ESNet is performing maintenance. Two outages of up to 15 minutes is expected, however the entire window is reserved. ESNet is multihomed. Please note outage has been identified as a maintenance.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6740&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070329T160001Z SUMMARY: 6746 NLR Layer 3 Peer KREONet2 (SEAT) Maintenance Completed DTEND:20070329T163001Z DESCRIPTION:TICKET NUMBER: 6746\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer KREONet\n\nSCHEDULED START TIME: Thursday, March 29, 2007, 4:00 PM (1600)\nSCHEDULED END TIME: Thursday, March 29, 2007, 4:30 PM (1630)\nDESCRIPTION:NLR Layer 3 Peer KREONet had rescheduled maintenance. A 5 minute outage was expected, however there was no loss of peering.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6746&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070411T080001Z SUMMARY: 6750 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070411T100001Z DESCRIPTION:TICKET NUMBER: 6750\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Wednesday, April 11, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Wednesday, April 11, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty AMP card in Fort Bridger, WY. No outage(s) occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6750&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070424T050001Z SUMMARY: 6766 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20070424T180001Z DESCRIPTION:TICKET NUMBER: 6766\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Tuesday, April 24, 2007, 9:19 AM (0919)\nEND TIME: Tuesday, April 24, 2007, 2:58 PM (1458)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-KANS were unavailable to the NLR community. NLR circuit provider performed a fiber relocation in Normal, IL; however, an outage occurred. NLR Layer 1 NOC engineers worked with hardware providers to restore connectivity.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6766&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070410T070001Z SUMMARY: 6756 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070410T130001Z DESCRIPTION:TICKET NUMBER: 6756\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, April 10, 2007, 7:00 AM (0700)\nSCHEDULED END TIME: Tuesday, April 10, 2007, 1:00 PM (1300)\nDESCRIPTION:Level(3) Communications Technicians spliced damaged fiber in Vallejo, CA. A thirty(30) minute outage was expected, however the entire maintenance window had been reserved. A backout date had been reserved for the following night during the same maintenance time. This maintenance has completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6756&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070416T140001Z SUMMARY: 6759 NLR Layer 3 Member UNM Maintenance Completed DTEND:20070416T220001Z DESCRIPTION:TICKET NUMBER: 6759\nMAINTENANCE TYPE: Power\nAFFECTED: Member University of New Mexico Connections\n\nSTART TIME: Monday, April 16, 2007, 10:33 AM (1033)\nEND TIME: Monday, April 16, 2007, 6:14 PM (1814)\nDESCRIPTION:NLR Layer 3 Member University of New Mexico will be performing power maintenance on their connections to NLR. They will be unavailable to the NLR Community throughout the maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6759&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070417T110001Z SUMMARY: 6776 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070417T130001Z DESCRIPTION:TICKET NUMBER: 6776\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\n\nSTART TIME: Tuesday, April 17, 2007, 11:14 AM (1114)\nEND TIME: Tuesday, April 17, 2007, 11:16 AM (1116)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a faulty Replacing OP-ELH-L card in Salem, OR. A brief outage is expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6776&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070426T070001Z SUMMARY: 6791 NLR Layer 3 Backbone Circuits Spanning CHIC-NEWY Maintenance Canceled DTEND:20070426T090001Z DESCRIPTION:TICKET NUMBER: 6791\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\nNLR-CHIC-CLEV-10GE-65\nNLR-CHIC-WASH-10GE-59\n\nSCHEDULED START TIME: Thursday, April 26, 2007, 7:00 AM (0700)\nSCHEDULED END TIME: Thursday, April 26, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be performing firmware upgrades in Cleveland, Ohio. Outages are expected throughout the maintenance window. This maintenance has been canceled.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6791&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070420T140001Z SUMMARY: 6762 NLR Layer 3 Member UNM Maintenance Completed DTEND:20070420T220001Z DESCRIPTION:TICKET NUMBER: 6762\nMAINTENANCE TYPE: Power\nAFFECTED: Member University of New Mexico Backup Connection to NLR\n\nSTART TIME: Friday, April 20, 2007, 2:10 PM (1410)\nEND TIME: Friday, April 20, 2007, 7:43 AM (0743)\nDESCRIPTION:NLR Layer 3 Member University of New Mexico is performing power maintenance on their backup connections to NLR. A brief outage is expected. Traffic will reroute through UNM's primary connection. The maintenance has been extended.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6762&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071016T110001Z SUMMARY: 7234 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20071016T130001Z DESCRIPTION:TICKET NUMBER: 7234\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, October 16, 2007, 11:15 AM (1115)\nEND TIME: Tuesday, October 16, 2007, 11:50 AM (1150)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Seattle, WA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7234&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071004T100001Z SUMMARY: 7207 NLR Layer 3 Member Cornell Maintenance Completed DTEND:20071004T110001Z DESCRIPTION:TICKET NUMBER: 7207\nMAINTENANCE TYPE: Hardware\nAFFECTED: Cornell\n\nSCHEDULED START TIME: Thursday, October 4, 2007, 10:00 AM (1000)\nSCHEDULED END TIME: Thursday, October 4, 2007, 11:00 AM (1100)\nDESCRIPTION:Cornell engineers performed tests on its Syracuse facillities. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7207&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070426T090001Z SUMMARY: 6786 NLR Layer 3 Backbone Circuits Spanning PITT-WASH Maintenance Completed DTEND:20070426T110001Z DESCRIPTION:TICKET NUMBER: 6786\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Thursday, April 26, 2007, 9:14 AM (0914)\nEND TIME: Thursday, April 26, 2007, 9:59 AM (0959)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have performed firmware upgrades in McLean, VA. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6786&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070425T060001Z SUMMARY: 6805 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Emergency Maintenance Completed DTEND:20070425T110001Z DESCRIPTION:TICKET NUMBER: 6805\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Wednesday, April 25, 2007, 7:04 AM (0704)\nEND TIME: Wednesday, April 25, 2007, 7:28 AM (0728)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-KANS were unavailable to the NLR community. NLR fiber provider Level(3) Communications have performed fiber maintenance in Normal, IL. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:09 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6805&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070612T050001Z SUMMARY: 6844 NLR PacketNet Peer CA*Net4 (CHIC) Maintenance Completed DTEND:20070612T110001Z DESCRIPTION:TICKET NUMBER: 6844\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net4 CHIC Connection\nto NLR\n\nSCHEDULED START TIME: Tuesday, June 12, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, June 12, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR PacketNet Peer CA*Net4's fiber provider performed a fiber relocation. An outage of 15 minutes was expected. However, the entire maintenance window had been reserved. CA*Net4 traffic did reroute. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6844&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070508T040001Z SUMMARY: 6822 NLR Layer 3 Backbone Circuits Spanning CHIC-NEWY Maintenance Completed DTEND:20070508T060001Z DESCRIPTION:TICKET NUMBER: 6822\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, May 8, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, May 8, 2007, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have performed firmware upgrades in Cleveland, Ohio. No outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6822&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070426T090001Z SUMMARY: 6800 NLR Layer 3 Router LOSA Maintenance Completed DTEND:20070426T110001Z DESCRIPTION:TICKET NUMBER: 6800\nMAINTENANCE TYPE: Hardware\nAFFECTED: *CENIC\n*Ultralight\n*PacificWave\nSingaren\nlosa.layer3.nlr.net;\nSTART TIME: Thursday, April 26, 2007, 9:14 AM (0914)\nEND TIME: Thursday, April 26, 2007, 10:34 AM (1034)\nDESCRIPTION:NLR Layer 3 Engineers, with the assistance of an Equinix Engineer, replaced cards in Los Angeles, CA. Outages were expected throughout the maintenance window. * denotes multihomed status, as traffic was reroute. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6800&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070502T210001Z SUMMARY: 6823 NLR Layer 3 Peer ESnet (NEWY) Emergency Maintenance Completed DTEND:20070502T210001Z DESCRIPTION:TICKET NUMBER: 6823\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer ESnet (NEWY)\n\nSTART TIME: Wednesday, May 2, 2007, 9:42 PM (2142)\nEND TIME: Wednesday, May 2, 2007, 9:57 PM (2157)\nDESCRIPTION:Peer ESnet Engineers will be working to move connectivity back to its original production location in New York. This will cause a brief interruption to their connection in New York. Maintenance completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6823&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070426T070001Z SUMMARY: 6801 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070426T110001Z DESCRIPTION:TICKET NUMBER: 6801\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, April 26, 2007, 7:35 AM (0735)\nEND TIME: Thursday, April 26, 2007, 7:48 AM (0748)\nDESCRIPTION:NLR Layer 1 NOC Engineering did troubleshooting on circuits between Lompoc, CA and San Luis Obispo, CA. Outages were expected throughout the maintenance window. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6801&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070501T110001Z SUMMARY: 6807 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070501T130001Z DESCRIPTION:TICKET NUMBER: 6807\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, May 1, 2007, 11:31 AM (1131)\nEND TIME: Tuesday, May 1, 2007, 11:39 AM (1139)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a faulty card in Olympia, WA. A brief outage was expected during the maintenance. However, the entire maintenance window was reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6807&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070426T160001Z SUMMARY: 6812 NLR Layer 3 Peer UltraLight Emergency Maintnenace Completed DTEND:20070426T170001Z DESCRIPTION:TICKET NUMBER: 6812\nMAINTENANCE TYPE: Software\nAFFECTED: Peer UltraLight\n\nSTART TIME: Wednesday, April 18, 2007, 4:08 PM (1608)\nEND TIME: Thursday, April 26, 2007, 4:44 PM (1644)\nDESCRIPTION:Peer UltraLight was performing emergency software maintenance. A brief outage was expected, however due to hardware issues the maintenance was extended. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6812&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070425T153001Z SUMMARY: 6813 NLR Member PNWGP Maintenance DTEND:20070426T070001Z DESCRIPTION:TICKET NUMBER: 6813\nMAINTENANCE TYPE: Circuit\nAFFECTED: PNWGP Connections\n\nSTART TIME: Thursday, April 26, 2007, 1:38 PM (1338)\nEND TIME: Thursday, April 26, 2007, 1:57 PM (1357)\nDESCRIPTION:NLR Member PNWGP Engineers are performing maintenance. Brief outages in service are expected throughout the maintenance window. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6813&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070710T110001Z SUMMARY: 6914 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070710T130001Z DESCRIPTION:TICKET NUMBER: 6914\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, July 10, 2007, 11:07 AM (1107)\nEND TIME: Tuesday, July 10, 2007, 11:23 AM (1123)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Eugene, OR. A brief outage of service was experienced. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6914&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070509T060001Z SUMMARY: 6835 NLR Layer 3 Peer CLARA Maintenance DTEND:20070509T070001Z DESCRIPTION:TICKET NUMBER: 6835\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CLARA\n\nSCHEDULED START TIME: Wednesday, May 9, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Wednesday, May 9, 2007, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 3 Peer CLARA will be performing software upgrades. The expected duration of outage is 15 minutes, however, the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6835&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070509T040001Z SUMMARY: 6828 NLR Layer 3 Backbone Circuits Spanning CHIC-PITT Maintenance Completed DTEND:20070509T060001Z DESCRIPTION:TICKET NUMBER: 6828\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, May 9, 2007, 4:11 AM (0411)\nEND TIME: Wednesday, May 9, 2007, 4:23 AM (0423)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Cleveland, OH. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6828&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070501T120001Z SUMMARY: 6818 NLR Layer 3 Peer ESnet (NEWY) Emergency Maintenance DTEND:20070501T220001Z DESCRIPTION:TICKET NUMBER: 6818\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer ESnet*\n\nSTART TIME: Tuesday, May 1, 2007, 2:09 PM (1409)\nEND TIME: Tuesday, May 1, 2007, 2:21 PM (1421)\nDESCRIPTION:NLR Layer 3 Peer ESnet is currently unavailable to the community. ESnet Engineers are performing emergency maintenance on their equipment. *ESnet is multi-homed, traffic will reroute.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6818&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070508T080001Z SUMMARY: 6827 NLR Layer 3 Backbone Circuits Spanning TULS-CHIC Maintenance Completed DTEND:20070508T100001Z DESCRIPTION:TICKET NUMBER: 6827\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Tuesday, May 8, 2007, 8:14 AM (0814)\nEND TIME: Tuesday, May 8, 2007, 8:22 AM (0822)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Tebbetts, MO. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6827&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070510T050001Z SUMMARY: 6840 NLR OOB Maintenance in Chicago, IL Completed DTEND:20070510T080001Z DESCRIPTION:TICKET NUMBER: 6840\nMAINTENANCE TYPE: Software\nAFFECTED: \nSCHEDULED START TIME: Thursday, May 10, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, May 10, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 2/3 Engineering will be performing maintenance on the OOB network. No interruptions to service are expected.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6840&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070509T080001Z SUMMARY: 6837 NLR Route DENV-SEAT Emergency Maintenance Completed DTEND:20070509T100001Z DESCRIPTION:TICKET NUMBER: 6837\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, May 9, 2007, 8:04 AM (0804)\nEND TIME: Wednesday, May 9, 2007, 8:08 AM (0808)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Cheyenne, WY. A brief outage occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6837&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070515T080001Z SUMMARY: 6850 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20070515T100001Z DESCRIPTION:TICKET NUMBER: 6850\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, May 15, 2007, 8:09 AM (0809)\nEND TIME: Tuesday, May 15, 2007, 8:18 AM (0818)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Wiggins, CO. A brief outage occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6850&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070513T100001Z SUMMARY: 6847 NLR Layer 3 Member SLR Maintenance Completed DTEND:20070513T130001Z DESCRIPTION:TICKET NUMBER: 6847\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member SLR\n\nSTART TIME: Sunday, May 13, 2007, 10:18 AM (1018)\nEND TIME: Sunday, May 13, 2007, 10:19 AM (1019)\nDESCRIPTION:Member SLR will be performing router maintenance in Jacksonville, FL. A five minute outage is expected, however, the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6847&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070515T040001Z SUMMARY: 6842 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070515T060001Z DESCRIPTION:TICKET NUMBER: 6842\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Tuesday, May 15, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, May 15, 2007, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in King George, VA. No outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6842&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070607T050001Z SUMMARY: 6895 NLR Layer 3 Router CHIC Maintenance Completed DTEND:20070607T070001Z DESCRIPTION:TICKET NUMBER: 6895\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-CLEV-10GE-65\nNLR-CHIC-HOUS-10GE-67\nNLR-NEWY-CHIC-10GE-100\nNLR-CHIC-STAR-10GE-126\nMember CIC OmniPoP\nMember Case Western*\nMember Oklahoma*\nIXP Starlight\nPeer Ultralight*, CANet*,\nStarlight, USGS, TWAREN*,\nESNet*, Gloriad, DR\nchic.layer3.nlr.net;\nSTART TIME: Thursday, June 7, 2007, 5:03 AM (0503)\nEND TIME: Thursday, June 7, 2007, 5:34 AM (0534)\nDESCRIPTION:NLR Layer 2/3 NOC Engineering, with the assistance of a fiber provider's technician, upgraded equipment in Chicago, IL. An outage of up to an hour was expected. However, the entire maintenance window was reserved. Maintenance has been completed. * Denotes Multi-homed Peers.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6895&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070516T080001Z SUMMARY: 6853 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20070516T100001Z DESCRIPTION:TICKET NUMBER: 6853\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36 \nNLR-CHIC-HOUS-10GE-67 \nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Wednesday, May 16, 2007, 8:18 AM (0818)\nEND TIME: Wednesday, May 16, 2007, 8:25 AM (0825)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, hve replaced a failing card in Odell, IL. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6853&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070517T040001Z SUMMARY: 6857 NLR OOB Maintenance in Chicago, IL and Houston, TX Completed DTEND:20070517T100001Z DESCRIPTION:TICKET NUMBER: 6857\nMAINTENANCE TYPE: Software\nAFFECTED: \nSCHEDULED START TIME: Thursday, May 17, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, May 17, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 2/3 Engineering performed maintenance on Out Of Band (OOB) connections in Chicago, IL and Houston, TX. This was not expected to be network-impacting. However, monitoring of BGP sessions was affected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6857&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070517T040001Z SUMMARY: 6864 NLR Layer 3 Peer SURFnet via NEWY Emergency Maintenance Completed DTEND:20070517T110001Z DESCRIPTION:TICKET NUMBER: 6864\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Thursday, May 17, 2007, 4:08 AM (0408)\nEND TIME: Thursday, May 17, 2007, 6:51 AM (0651)\nDESCRIPTION:NLR Layer 3 Peer SURFnet via NEWY was unavailable. SURFnet engineers say that an emergency planned maintenance was performed with Global Crossing.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6864&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070523T123001Z SUMMARY: 6874 NLR Layer 3 Member UCAR Maintenance Completed DTEND:20070523T133001Z DESCRIPTION:TICKET NUMBER: 6874\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member UCAR's Connection To\nPacketNet\n\nSCHEDULED START TIME: Wednesday, May 23, 2007, 12:30 PM (1230)\nSCHEDULED END TIME: Wednesday, May 23, 2007, 1:30 PM (1330)\nDESCRIPTION:NLR Layer 3 Member UCAR will be unavailable to the NLR community during the above time frame. They will be performing maintenance on their connection to NLR. The entire maintenance window has been reserved. A 10 minute outage is expected. However, the entire maintenance window has been reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6874&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070516T040001Z SUMMARY: 6855 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070516T060001Z DESCRIPTION:TICKET NUMBER: 6855\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, May 16, 2007, 4:06 AM (0406)\nEND TIME: Wednesday, May 16, 2007, 4:49 AM (0449)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Mebane, NC. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6855&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070519T050001Z SUMMARY: 6867 NLR Layer 3 Backbone Circuits Spanning TULS-HOUS Emergency Maintenance Completed DTEND:20070519T110001Z DESCRIPTION:TICKET NUMBER: 6867\nMAINTENANCE TYPE: Circuit\nAFFECTED: Backbone Circuits CHIC-HOUS,\nDENV-HOUS, TULS-CHIC\n\nSCHEDULED START TIME: Saturday, May 19, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Saturday, May 19, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 3 Backbone Circuits CHIC-HOUS, DENV-HOUS, and TULS-CHIC will be unavailable to the NLR Layer 3 community. NLR fiber provider Level(3) Communications will perform fiber maintenance in Dallas, TX. An outage of up to the entire maintenance window is expected. However the entire maintenance is reserved.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6867&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070518T050001Z SUMMARY: 6865 NLR OOB Maintenance in Chicago, IL and Houston, TX Completed DTEND:20070518T080001Z DESCRIPTION:TICKET NUMBER: 6865\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Connections\n\nSCHEDULED START TIME: Friday, May 18, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, May 18, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 2/3 Engineering performed maintenance on the out of band network. No services were expected to be affected, however the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6865&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070606T040101Z SUMMARY: 6888 NLR Layer 3 PacketNET Peer CA*net4 (NEWY) Maintenance Completed DTEND:20070606T050001Z DESCRIPTION:TICKET NUMBER: 6888\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net4 via NEWY *\n\nSTART TIME: Wednesday, June 6, 2007, 4:18 AM (0418)\nEND TIME: Wednesday, June 6, 2007, 4:19 AM (0419)\nDESCRIPTION:Peer CA*net4's connection was briefly unavailable. The peer's circuit provider rolled their fiber to its original path due to an outage that happened in May 2007. *Peer is multihomed. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6888&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070801T103001Z SUMMARY: 7039 ORNL Maintenance ***Tracking*** DTEND:20070801T113001Z DESCRIPTION:TICKET NUMBER: 7039\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSCHEDULED START TIME: Wednesday, August 1, 2007, 10:30 AM (1030)\nSCHEDULED END TIME: Wednesday, August 1, 2007, 11:30 AM (1130)\nDESCRIPTION:ORNL Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7039&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070531T110001Z SUMMARY: 6885 NLR Layer 3 Router SEAT Maintenance Completed DTEND:20070531T130001Z DESCRIPTION:TICKET NUMBER: 6885\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-LOSA-SEAT-10GE-49\nNLR-DENV-SEAT-10GE-58\nIXP Pac Wave\nMember PNWGP Connections\nPeers DREN, NREN, Kreonet,\nCAnet, REANNZ\nseat.layer3.nlr.net;\nSTART TIME: Thursday, May 31, 2007, 11:02 AM (1102)\nEND TIME: Thursday, May 31, 2007, 11:29 AM (1129)\nDESCRIPTION:NLR Layer 2/3 Engineering, with the assistance of a PNWGP Technician, upgraded equipment in Seattle, WA. An outage of up to an hour was expected. However, the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6885&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070605T070001Z SUMMARY: 6884 NLR Layer 3 Backbone Circuits Spanning DENV-RATO Maintenance Completed DTEND:20070605T110001Z DESCRIPTION:TICKET NUMBER: 6884\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-LOSA-10GE-90\nNLR-ALBU-DENV-10GE-95\n\nSTART TIME: Tuesday, June 5, 2007, 7:15 AM (0715)\nEND TIME: Tuesday, June 5, 2007, 7:16 AM (0716)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced faulty equipment in Raton, NM. A brief outage was expected. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6884&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070523T080001Z SUMMARY: 6876 NLR Layer 3 Member LONI Emergency Maintenance Completed DTEND:20070523T090001Z DESCRIPTION:TICKET NUMBER: 6876\nMAINTENANCE TYPE: Software\nAFFECTED: Member LONI\n\nSTART TIME: Wednesday, May 23, 2007, 8:05 AM (0805)\nEND TIME: Wednesday, May 23, 2007, 8:11 AM (0811)\nDESCRIPTION:NLR Layer 3 Member LONI performed emergency maintenance. Outages were expected throughout the entire maintenance window. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6876&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070605T110001Z SUMMARY: 6887 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070606T220001Z DESCRIPTION:TICKET NUMBER: 6887\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, June 5, 2007, 11:11 AM (1111)\nEND TIME: Wednesday, June 6, 2007, 7:30 PM (1930)\nDESCRIPTION:NLR L1 NOC Engineering, with the assistance of a Level(3) Communications Technician replaced the failing equipment and the route is now available to the NLR L3 community.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6887&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070612T030001Z SUMMARY: 6902 NLR Peer SURFnet Maintenance Completed DTEND:20070612T050001Z DESCRIPTION:TICKET NUMBER: 6902\nMAINTENANCE TYPE: Software\nAFFECTED: Peer SURFnet\n\nSTART TIME: Tuesday, June 12, 2007, 3:40 AM (0340)\nEND TIME: Tuesday, June 12, 2007, 3:46 AM (0346)\nDESCRIPTION:NLR Peer SURFnet engineers performed maintenance on their border routers, an outage was expected and the entire maintenance window was reserved. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6902&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070606T110001Z SUMMARY: 6889 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070606T130001Z DESCRIPTION:TICKET NUMBER: 6889\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, June 6, 2007, 11:17 AM (1117)\nEND TIME: Wednesday, June 6, 2007, 11:28 AM (1128)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Chemult, OR. A brief outage was expected. However, the entire maintenance window was reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6889&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070616T070001Z SUMMARY: 6897 NLR Layer 3 Peer CA*Net4 (SEAT) Maintenance DTEND:20070616T130001Z DESCRIPTION:TICKET NUMBER: 6897\nMAINTENANCE TYPE: Circuit\nAFFECTED: CA*Net4 Connection to NLR via\nSeattle, WA\n\nSTART TIME: Saturday, June 16, 2007, 7:04 AM (0704)\nEND TIME: Saturday, June 16, 2007, 10:10 AM (1010)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4's fiber provider is completing a fiber relocation between Seattle, WA and Vancouver, BC. Outages are expected throughout the maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6897&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070718T110001Z SUMMARY: 6920 NLR Layer 3 Backbone Circuits Spanning PHOE-LOSA Maintenance Completed DTEND:20070718T130001Z DESCRIPTION:TICKET NUMBER: 6920\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSTART TIME: Wednesday, July 18, 2007, 11:13 AM (1113)\nEND TIME: Wednesday, July 18, 2007, 11:16 AM (1116)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Mecca, CA. A brief outage was expected. However, the entire maintenance window was reserved. Please note this maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6920&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070629T200001Z SUMMARY: 6918 NLR Layer 3 Peer CA*Net Maintenance Completed DTEND:20070629T220001Z DESCRIPTION:TICKET NUMBER: 6918\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net\n\nSCHEDULED START TIME: Friday, June 29, 2007, 8:00 PM (2000)\nSCHEDULED END TIME: Friday, June 29, 2007, 10:00 PM (2200)\nDESCRIPTION:Peer CA*Net performed circuit maintenance. Outages were expected throughout the maintenance window, however the entire maintenance window was reserved. CA*Net is multi-homed. Maintenance has been completed\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6918&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070615T050001Z SUMMARY: 6915 NLR OOB Maintenance (All OOB Locations) Completed DTEND:20070615T090001Z DESCRIPTION:TICKET NUMBER: 6915\nMAINTENANCE TYPE: Hardware\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Friday, June 15, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, June 15, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 2/3 Engineers will be completing maintenance on the out of band network. This will cause the loss of monitoring throughout the maintenance window. However, this is expected to have no impact on services.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6915&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070613T040001Z SUMMARY: 6906 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070613T060001Z DESCRIPTION:TICKET NUMBER: 6906\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, June 13, 2007, 4:35 AM (0435)\nEND TIME: Wednesday, June 13, 2007, 4:41 AM (0441)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Kalamazoo, MI. A brief outage occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6906&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070626T110001Z SUMMARY: 6908 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070626T130001Z DESCRIPTION:TICKET NUMBER: 6908\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, June 26, 2007, 11:06 AM (1106)\nEND TIME: Tuesday, June 26, 2007, 11:07 AM (1107)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Reith, OR. Two brief outages were detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6908&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070801T040001Z SUMMARY: 7048 NLR Layer 3 Member TransPAC2 Emergency Maintenance Completed DTEND:20070801T050001Z DESCRIPTION:TICKET NUMBER: 7048\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer TransPAC2\n\nSTART TIME: Wednesday, August 1, 2007, 3:43 AM (0343)\nEND TIME: Wednesday, August 1, 2007, 3:47 AM (0347)\nDESCRIPTION:NLR Layer 3 Member TransPAC2 performed emergency maintenance. A brief outage was incurred 15 minutes prior to the start of the maintenance window. Maintenance is now completed. \nTIMESTAMP: Sat Nov 7 11:03:10 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7048&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070718T070001Z SUMMARY: 6962 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070718T090001Z DESCRIPTION:TICKET NUMBER: 6962\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 18, 2007, 7:04 AM (0704)\nEND TIME: Wednesday, July 18, 2007, 7:12 AM (0712)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Portland, OR. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6962&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070628T200001Z SUMMARY: 6963 NLR Layer 3 Peer CA*Net (CHIC) Maintenance Completed DTEND:20070628T220001Z DESCRIPTION:TICKET NUMBER: 6963\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net4 (CHIC)\n\nSTART TIME: Thursday, June 28, 2007, 8:41 PM (2041)\nEND TIME: Friday, June 29, 2007, 12:37 AM (0037)\nDESCRIPTION:Peer CA*Net is unavailable to the NLR Layer 3 Community. CA*Net Engineers have been contacted, and report the RFO was scheduled circuit maintenance.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6963&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070702T180001Z SUMMARY: 6974 NLR Layer 3 Peer CA*Net4 (STTL) Emergency Maintenance DTEND:20070702T190001Z DESCRIPTION:TICKET NUMBER: 6974\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net4*\n\nSCHEDULED START TIME: Monday, July 2, 2007, 6:00 PM (1800)\nSCHEDULED END TIME: Monday, July 2, 2007, 7:00 PM (1900)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4 will be undergoing emergency circuit maintenance. An outage of up to 10 minutes is expected; however, the entire maintenance window is reserved. *Peer is multi-homed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6974&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070620T040001Z SUMMARY: 6916 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070620T060001Z DESCRIPTION:TICKET NUMBER: 6916\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, June 20, 2007, 5:15 AM (0515)\nEND TIME: Wednesday, June 20, 2007, 5:16 AM (0516)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Raleigh, NC. A brief outage occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6916&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070627T080001Z SUMMARY: 6939 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20070627T100001Z DESCRIPTION:TICKET NUMBER: 6939\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Wednesday, June 27, 2007, 4:15 AM (0415)\nEND TIME: Wednesday, June 27, 2007, 4:19 AM (0419)\nDESCRIPTION:NLR NOC Layer 1 Engineering, with the assistance of a Level (3) Communications Technician, have replaced cards in San Antonio, TX. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6939&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070711T110001Z SUMMARY: 6934 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070711T130001Z DESCRIPTION:TICKET NUMBER: 6934\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 11, 2007, 11:08 AM (1108)\nEND TIME: Wednesday, July 11, 2007, 11:33 AM (1133)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Sunnyvale, CA. A brief outage was expected. However, the entire maintenance window was reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6934&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070711T060001Z SUMMARY: 6935 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070711T100001Z DESCRIPTION:TICKET NUMBER: 6935\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, July 11, 2007, 6:03 AM (0603)\nEND TIME: Wednesday, July 11, 2007, 6:08 AM (0608)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Cheyenne, WY. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6935&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070717T110001Z SUMMARY: 6937 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070717T130001Z DESCRIPTION:TICKET NUMBER: 6937\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, July 17, 2007, 11:02 AM (1102)\nEND TIME: Tuesday, July 17, 2007, 11:03 AM (1103)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Eugene, OR. A brief outage was expected. However, the entire maintenance window was reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6937&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070710T050501Z SUMMARY: 6926 NLR Peer CA*Net (CHIC) Maintenance Completed DTEND:20070710T110001Z DESCRIPTION:TICKET NUMBER: 6926\nMAINTENANCE TYPE: Circuit\nAFFECTED: CA*Net(CHIC) Connection\n\nSTART TIME: Tuesday, July 10, 2007, 4:16 AM (0416)\nEND TIME: Tuesday, July 10, 2007, 6:31 AM (0631)\nDESCRIPTION:NLR Layer 3 Peer CA*Net performed a maintenance on fiber between Chicago, IL and Toronto, ON. A fifteen (15) minute outage was expected to complete the fiber relocation. Traffic will reroute during maintenance. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6926&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070626T230001Z SUMMARY: 6944 NLR Layer 3 Peer CA*Net (CHIC) Maintenance Completed DTEND:20070627T020001Z DESCRIPTION:TICKET NUMBER: 6944\nMAINTENANCE TYPE: Hardware\nAFFECTED: CA*Net Peering in CHIC\n\nSTART TIME: Tuesday, June 26, 2007, 11:34 PM (2334)\nEND TIME: Wednesday, June 27, 2007, 1:28 AM (0128)\nDESCRIPTION:NLR Layer 3 Peer CA*Net will be performed hardware maintenance in Toronto, ON. Traffic rerouted during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6944&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070717T040001Z SUMMARY: 6953 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070717T070001Z DESCRIPTION:TICKET NUMBER: 6953\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Tuesday, July 17, 2007, 4:38 AM (0438)\nEND TIME: Tuesday, July 17, 2007, 6:37 AM (0637)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Jacksonville, FL. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6953&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070623T040001Z SUMMARY: 6945 NLR Layer 3 Member NCLR Emergency Maintenance Completed DTEND:20070623T060001Z DESCRIPTION:TICKET NUMBER: 6945\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member NCLR\n\nSTART TIME: Saturday, June 23, 2007, 4:04 AM (0404)\nEND TIME: Saturday, June 23, 2007, 5:15 AM (0515)\nDESCRIPTION:NLR Layer 3 Member NCLR was unavailable to the NLR community as NCLR Engineers have performed a maintenance. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6945&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070703T010001Z SUMMARY: 6973 NLR Layer 3 Peer CA*Net Emergency Maintenance Completed DTEND:20070703T030001Z DESCRIPTION:TICKET NUMBER: 6973\nMAINTENANCE TYPE: Hardware\nAFFECTED: CA*net\n\nSCHEDULED START TIME: Tuesday, July 3, 2007, 1:00 AM (0100)\nSCHEDULED END TIME: Tuesday, July 3, 2007, 3:00 AM (0300)\nDESCRIPTION:This Maintenance Has NOT Been Canceled. During the time shown above, CANARIE engineers will be reconfiguring the Toronto-StarLight and Montreal-MANLAN L3 circuits. Toronto-StarLight will be affected and down for approximately 10 minutes. Montreal-MANLAN circuit will be done first, follow by Toronto-MANLAN circuit, and then Toronto-Chicago circuit. Maintenances will be done 15 minutes apart. Peer CA*net is multi-homed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6973&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070723T050001Z SUMMARY: 6959 NLR Layer 3 Backbone Circuits Spanning WASH-SYRA Maintenance Completed DTEND:20070723T090001Z DESCRIPTION:TICKET NUMBER: 6959\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, July 23, 2007, 6:40 AM (0640)\nEND TIME: Monday, July 23, 2007, 6:46 AM (0646)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level (3) Communications Technician, have replaced cards in New York, NY. Outages have occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6959&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070626T030001Z SUMMARY: 6950 NLR Layer 3 Backbone LOSA-SEAT Emergency Maintenance Completed DTEND:20070626T070001Z DESCRIPTION:TICKET NUMBER: 6950\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, June 26, 2007, 3:00 AM (0300)\nSCHEDULED END TIME: Tuesday, June 26, 2007, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed power provisioning in support of the deployment of additional lambdas. This maintenance was non-service impacting, however the entire maintenance window was reserved. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6950&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070628T200001Z SUMMARY: 6957 NLR Layer 3 Peer CA*Net (CHIC) Maintenance Completed DTEND:20070628T220001Z DESCRIPTION:TICKET NUMBER: 6957\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Thursday, June 28, 2007, 4:54 AM (0454)\nEND TIME: Thursday, June 28, 2007, 9:23 AM (0923)\nDESCRIPTION:NLR Layer 3 Peer CA*Net was unavailable to the NLR community. CA*Net Engineers have been contacted, and report the RFO was scheduled circuit maintenance.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6957&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070625T090001Z SUMMARY: 6938 NLR Layer 3 Backbone Circuit TULS-CHIC Maintenance Completed DTEND:20070625T110001Z DESCRIPTION:TICKET NUMBER: 6938\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-TULS-CHIC-10GE-97\n\nSTART TIME: Monday, June 25, 2007, 10:07 AM (1007)\nEND TIME: Monday, June 25, 2007, 10:12 AM (1012)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced cards in Tulsa, OK. Outages were expected during the maintenance window. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6938&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070620T080001Z SUMMARY: 6927 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070620T100001Z DESCRIPTION:TICKET NUMBER: 6927\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, June 20, 2007, 9:53 AM (0953)\nEND TIME: Wednesday, June 20, 2007, 9:57 AM (0957)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Southfield, MI. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6927&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070710T060001Z SUMMARY: 6932 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070710T100001Z DESCRIPTION:TICKET NUMBER: 6932\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, July 10, 2007, 8:27 AM (0827)\nEND TIME: Tuesday, July 10, 2007, 8:53 AM (0853)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Laramie, WY. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6932&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070622T050001Z SUMMARY: 6930 NLR OOB Maintenance (All OOB Locations) Cancelled DTEND:20070622T090001Z DESCRIPTION:TICKET NUMBER: 6930\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Friday, June 22, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, June 22, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 2/3 Engineers will be completing maintenance on the out of band network. This will cause the loss of monitoring throughout the maintenance window. However, this is not expected to have any impact on services. This maintenance has been cancelled.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6930&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070621T070101Z SUMMARY: 6940 NLR Layer 3 Peer Los Nettos (SEAT) Outage Resolved DTEND:20070621T070801Z DESCRIPTION:TICKET NUMBER: 6940\nMAINTENANCE TYPE: Software\nAFFECTED: Peer Los Nettos (SEAT)\n\nSTART TIME: Thursday, June 21, 2007, 7:01 AM (0701)\nEND TIME: Thursday, June 21, 2007, 7:08 AM (0708)\nDESCRIPTION:NLR Layer 3 Peer Los Nettos was unavailable. Los Nettos engineers have reported that the outage was due to an emergency reload on one of their peering routers.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6940&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070626T230001Z SUMMARY: 6942 NLR Layer 3 Peer CA*Net4 (NEWY) Maintenance Completed DTEND:20070627T040001Z DESCRIPTION:TICKET NUMBER: 6942\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*net4 (NEWY)\n\nSTART TIME: Wednesday, June 27, 2007, 12:36 AM (0036)\nEND TIME: Wednesday, June 27, 2007, 1:51 AM (0151)\nDESCRIPTION:Peer CA*net4's connection via NEWY was unavailable to the NLR community. CA*net engineers replaced their Cisco 15454 with a Nortel OME 6500. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6942&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070625T050001Z SUMMARY: 6931 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070625T070001Z DESCRIPTION:TICKET NUMBER: 6931\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, June 25, 2007, 5:19 AM (0519)\nEND TIME: Monday, June 25, 2007, 5:36 AM (0536)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have performed hardware maintenance in Chicago, IL. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6931&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070629T070101Z SUMMARY: 6966 NLR Layer 3 Peer CA*Net4 (SEAT) Maintenance Completed DTEND:20070629T130001Z DESCRIPTION:TICKET NUMBER: 6966\nMAINTENANCE TYPE: Circuit\nAFFECTED: CA*Net4 Connection to NLR via\nSeattle, WA\n\nSCHEDULED START TIME: Friday, June 29, 2007, 7:01 AM (0701)\nSCHEDULED END TIME: Friday, June 29, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4's fiber provider is completing a fiber relocation in Seattle, WA. Outages are expected throughout the maintenance window. Maintenance has Completed\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6966&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070706T050001Z SUMMARY: 6967 NLR OOB Maintenance (All OOB Locations) DTEND:20070706T090001Z DESCRIPTION:TICKET NUMBER: 6967\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Friday, July 6, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Friday, July 6, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 2/3 Engineers will be completing maintenance on the out of band network. This will cause the loss of monitoring throughout the maintenance window. However, this is not expected to have any impact on services.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6967&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070725T040001Z SUMMARY: 6983 NLR Layer 3 Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070725T060001Z DESCRIPTION:TICKET NUMBER: 6983\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, July 25, 2007, 4:11 AM (0411)\nEND TIME: Wednesday, July 25, 2007, 4:15 AM (0415)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Kalamazoo, MI. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6983&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070629T210001Z SUMMARY: 6969 NLR Layer 3 Peer UCAR Emergency Maintenance Completed DTEND:20070629T220001Z DESCRIPTION:TICKET NUMBER: 6969\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer UCAR\n\nSTART TIME: Friday, June 29, 2007, 8:33 PM (2033)\nEND TIME: Friday, June 29, 2007, 8:43 PM (2043)\nDESCRIPTION:Peer UCAR Engineers will be performing hardware maintenance. A five (5) minute outage is expected, however, the entire maintenance window is reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6969&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070702T200001Z SUMMARY: 6975 NLR Layer 3 Peer CA*net (NEWY) Emergency Maintenance Completed DTEND:20070702T210001Z DESCRIPTION:TICKET NUMBER: 6975\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net\n\nSTART TIME: Monday, July 2, 2007, 8:28 PM (2028)\nEND TIME: Monday, July 2, 2007, 8:47 PM (2047)\nDESCRIPTION:NLR Layer 3 Peer CA*net (NEWY) performed circuit maintenance. An outage up to the entire maintenance window was expected, however, the entire maintenance window was reserved. Peer CA*net is multi-homed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6975&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070716T040001Z SUMMARY: 6976 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Completed DTEND:20070716T080001Z DESCRIPTION:TICKET NUMBER: 6976\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, July 16, 2007, 4:32 AM (0432)\nEND TIME: Monday, July 16, 2007, 5:19 AM (0519)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level (3) Communications Technician, have replaced cards in Syracuse, NY. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6976&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070712T090001Z SUMMARY: 6977 NLR Layer 3 Core Node DENV Maintenance Completed DTEND:20070712T100001Z DESCRIPTION:TICKET NUMBER: 6977\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: DENV and its Peers\ndenv.layer3.nlr.net;\nSTART TIME: Thursday, July 12, 2007, 8:38 AM (0838)\nEND TIME: Thursday, July 12, 2007, 9:30 AM (0930)\nDESCRIPTION:NLR Layer 2/3 Engineers have performed software maintenance on the Denver Core Node. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6977&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070821T050001Z SUMMARY: 7002 NLR Layer 3 Backbone Circuits Spanning DENV-KANS Maintenance Completed DTEND:20070821T070001Z DESCRIPTION:TICKET NUMBER: 7002\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, August 21, 2007, 5:31 AM (0531)\nEND TIME: Tuesday, August 21, 2007, 5:41 AM (0541)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, were unsuccessful in replacing a failing card in Grafton, NE. Another maintenance will be scheduled in the near future.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7002&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070713T110001Z SUMMARY: 6982 NLR Layer 3 Core Node DENV Maintenance Completed DTEND:20070713T120001Z DESCRIPTION:TICKET NUMBER: 6982\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: DENV and its Peers\ndenv.layer3.nlr.net;\nSTART TIME: Friday, July 13, 2007, 11:00 AM (1100)\nEND TIME: Friday, July 13, 2007, 11:05 AM (1105)\nDESCRIPTION:NLR Layer 2/3 Engineers have performed software maintenance on the Denver Core Node. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6982&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070725T080001Z SUMMARY: 6985 NLR Layer 3 Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070725T100001Z DESCRIPTION:TICKET NUMBER: 6985\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, July 25, 2007, 8:16 AM (0816)\nEND TIME: Wednesday, July 25, 2007, 8:40 AM (0840)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Dexter, MI. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6985&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070726T070001Z SUMMARY: 7035 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070726T100001Z DESCRIPTION:TICKET NUMBER: 7035\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, July 26, 2007, 7:00 AM (0700)\nEND TIME: Thursday, July 26, 2007, 7:16 AM (0716)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed emergency maintenance to replace a defective card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7035&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070707T040001Z SUMMARY: 6989 NLR Layer 3 Member NCREN Maintenance Completed DTEND:20070707T100001Z DESCRIPTION:TICKET NUMBER: 6989\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member NCREN\n\nSTART TIME: Saturday, July 7, 2007, 4:17 AM (0417)\nEND TIME: Saturday, July 7, 2007, 6:51 AM (0651)\nDESCRIPTION:NCREN engineers have performed software and hardware maintenance on their equipment. Outages had occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6989&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070709T220001Z SUMMARY: 6990 NLR Layer 3 Peer CA*net4 (NEWY) Maintenance Completed DTEND:20070710T020001Z DESCRIPTION:TICKET NUMBER: 6990\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*net4 (NEWY)*\n\nSTART TIME: Monday, July 9, 2007, 10:35 PM (2235)\nEND TIME: Monday, July 9, 2007, 11:48 PM (2348)\nDESCRIPTION:Peer CA*net4 performed maintenance. CA*net4 experienced down time through out the maintenance. *Denotes multihomed status\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6990&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070808T040001Z SUMMARY: 7068 NLR Layer 3 Backbone Circuit WASH-ATLA Emergency Maintenance Completed DTEND:20070808T100001Z DESCRIPTION:TICKET NUMBER: 7068\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, August 8, 2007, 7:00 AM (0700)\nEND TIME: Wednesday, August 8, 2007, 7:53 AM (0753)\nDESCRIPTION:Backbone Circuit WASH-ATLA is currently unavailable to the NLR Layer 3 community. Circuit provider Level(3) Communications confirmed this outage was due to a maintenance performed from Richmond VA, to Dahlgren, VA without notifying NLR.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7068&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070724T103001Z SUMMARY: 7028 NLR Layer 3 Peer ORNL Maintenance Completed DTEND:20070724T110001Z DESCRIPTION:TICKET NUMBER: 7028\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer ORNL\n\nSCHEDULED START TIME: Tuesday, July 24, 2007, 10:30 AM (1030)\nSCHEDULED END TIME: Tuesday, July 24, 2007, 11:00 AM (1100)\nDESCRIPTION:Peer ORNL will be performing maintenance on the optical fiber link between Oak Ridge and Chicago. An outage of 30 minutes is expected so the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7028&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070803T000001Z SUMMARY: 7037 NLR Peer CA*Net Maintenance Completed DTEND:20070803T060001Z DESCRIPTION:TICKET NUMBER: 7037\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*Net\n\nSTART TIME: Friday, August 3, 2007, 1:19 AM (0119)\nEND TIME: Friday, August 3, 2007, 5:54 AM (0554)\nDESCRIPTION:NLR Layer3 Peer CA*Net performed router maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7037&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070711T030001Z SUMMARY: 6992 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20070711T090001Z DESCRIPTION:TICKET NUMBER: 6992\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Wednesday, July 11, 2007, 3:00 AM (0300)\nSCHEDULED END TIME: Wednesday, July 11, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 3 Backbone Circuit ATLA-HOUS underwent maintenance as circuit provider, Level(3) Communications, performed fiber maintenance. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:11 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6992&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070821T070001Z SUMMARY: 7088 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20070821T090001Z DESCRIPTION:TICKET NUMBER: 7088\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, August 21, 2007, 7:11 AM (0711)\nEND TIME: Tuesday, August 21, 2007, 7:14 AM (0714)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Heartwell, NE. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7088&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070813T080001Z SUMMARY: 7052 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070813T100001Z DESCRIPTION:TICKET NUMBER: 7052\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, August 13, 2007, 8:15 AM (0815)\nEND TIME: Monday, August 13, 2007, 8:32 AM (0832)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Bogart, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7052&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070712T040101Z SUMMARY: 6998 NLR Layer 3 Member NCLR Emergency Maintenance Completed DTEND:20070712T060001Z DESCRIPTION:TICKET NUMBER: 6998\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member NCLR\n\nSTART TIME: Thursday, July 12, 2007, 4:05 AM (0405)\nEND TIME: Thursday, July 12, 2007, 4:26 AM (0426)\nDESCRIPTION:NCLR Engineers have performed hardware maintenance. Brief outages occurred. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=6998&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070822T050001Z SUMMARY: 7049 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20070822T070001Z DESCRIPTION:TICKET NUMBER: 7049\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Wednesday, August 22, 2007, 4:53 AM (0453)\nEND TIME: Wednesday, August 22, 2007, 4:54 AM (0454)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Auburn, NE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7049&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070814T040001Z SUMMARY: 7051 NLR Layer 3 Backbone Circuit ATLA-WASH Emergency Maintenance Completed DTEND:20070814T060001Z DESCRIPTION:TICKET NUMBER: 7051\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Tuesday, August 14, 2007, 4:22 AM (0422)\nEND TIME: Tuesday, August 14, 2007, 4:33 AM (0433)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in McLean, VA. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7051&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070822T070001Z SUMMARY: 7073 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070822T090001Z DESCRIPTION:TICKET NUMBER: 7073\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Wednesday, August 22, 2007, 7:00 AM (0700)\nSCHEDULED END TIME: Wednesday, August 22, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Medicine Bow, Wyoming. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7073&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070821T090001Z SUMMARY: 7003 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070821T110001Z DESCRIPTION:TICKET NUMBER: 7003\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, August 21, 2007, 9:05 AM (0905)\nEND TIME: Tuesday, August 21, 2007, 9:09 AM (0909)\nDESCRIPTION:Please note, the below maintenance has been rescheduled. NLR Layer 1 NOC Engineering, have replaced a failing card in Durkee, OR. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7003&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070724T050001Z SUMMARY: 7001 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20070724T070001Z DESCRIPTION:TICKET NUMBER: 7001\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Tuesday, July 24, 2007, 5:01 AM (0501)\nEND TIME: Tuesday, July 24, 2007, 5:08 AM (0508)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a faulty card in Kansas City, MO. A brief outage occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7001&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070717T200001Z SUMMARY: 7007 NLR Layer 3 Peer CA*net4 (NEWY) Emergency Maintenance Completed DTEND:20070717T220001Z DESCRIPTION:TICKET NUMBER: 7007\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*net4 (NEWY)*\n\nSTART TIME: Tuesday, July 17, 2007, 8:03 PM (2003)\nEND TIME: Tuesday, July 17, 2007, 8:20 PM (2020)\nDESCRIPTION:NLR Layer 3 Peer CA*net4 will perform maintenance in New York. A outage of up to 15 minutes is expected. However, the entire maintenance window is reserved. Maintenance has been completed. *Denotes multihomed status\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7007&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070801T110001Z SUMMARY: 7005 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070801T130001Z DESCRIPTION:TICKET NUMBER: 7005\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, August 1, 2007, 11:00 AM (1100)\nEND TIME: Wednesday, August 1, 2007, 11:02 AM (1102)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in La Grande, OR. A brief outage was expected. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7005&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070724T080001Z SUMMARY: 7006 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070724T100001Z DESCRIPTION:TICKET NUMBER: 7006\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, July 24, 2007, 8:11 AM (0811)\nEND TIME: Tuesday, July 24, 2007, 8:21 AM (0821)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Chicago, IL. A 10 minute outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7006&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070808T070001Z SUMMARY: 7009 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070808T090001Z DESCRIPTION:TICKET NUMBER: 7009\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, August 8, 2007, 7:40 AM (0740)\nEND TIME: Wednesday, August 8, 2007, 7:50 AM (0750)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Sunnyvale, CA. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7009&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070821T110001Z SUMMARY: 7084 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070821T130001Z DESCRIPTION:TICKET NUMBER: 7084\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, August 21, 2007, 10:52 AM (1052)\nEND TIME: Tuesday, August 21, 2007, 11:10 AM (1110)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Sunnyvale, CA. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7084&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070807T080001Z SUMMARY: 7010 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070807T100001Z DESCRIPTION:TICKET NUMBER: 7010\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, August 7, 2007, 8:16 AM (0816)\nEND TIME: Tuesday, August 7, 2007, 8:25 AM (0825)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Ontario, OR. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7010&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070824T103001Z SUMMARY: 7059 NLR Layer 3 Member PSC Maintenance Completed DTEND:20070824T120001Z DESCRIPTION:TICKET NUMBER: 7059\nMAINTENANCE TYPE: Software\nAFFECTED: Member PSC\n\nSCHEDULED START TIME: Friday, August 24, 2007, 10:30 AM (1030)\nSCHEDULED END TIME: Friday, August 24, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 Member PSC will be performing maintenance on their connections to PacketNet. They will be unavailable throughout the maintenance window.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7059&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070718T070001Z SUMMARY: 7011 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070718T100001Z DESCRIPTION:TICKET NUMBER: 7011\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 18, 2007, 7:05 AM (0705)\nEND TIME: Wednesday, July 18, 2007, 7:29 AM (0729)\nDESCRIPTION:NLR Layer 1 NOC Engineering have performed an emergency maintenance to replace failing cards in San Martin, CA. This is expected to restore monitoring capabilities along this route. Brief outages occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7011&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070807T040001Z SUMMARY: 7012 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070807T060001Z DESCRIPTION:TICKET NUMBER: 7012\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Tuesday, August 7, 2007, 4:09 AM (0409)\nEND TIME: Tuesday, August 7, 2007, 4:41 AM (0441)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, had planned to replace a failing card in Salisbury, NC. Replacement card was classified as DOA. Notification for a rescheduled maintenance will be provided once a new replacement card has been received.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7012&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070904T110001Z SUMMARY: 7136 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070904T130001Z DESCRIPTION:TICKET NUMBER: 7136\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, September 4, 2007, 11:00 AM (1100)\nSCHEDULED END TIME: Tuesday, September 4, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Olympia, WA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7136&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070814T060001Z SUMMARY: 7016 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070814T080001Z DESCRIPTION:TICKET NUMBER: 7016\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Tuesday, August 14, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, August 14, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Fort Bridger, WY. No outages have occurred. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7016&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070719T110001Z SUMMARY: 7018 NLR Layer 3 Peer SURFnet Outage Resolved DTEND:20070719T130001Z DESCRIPTION:TICKET NUMBER: 7018\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Thursday, July 19, 2007, 12:16 AM (0016)\nEND TIME: Thursday, July 19, 2007, 12:34 AM (0034)\nDESCRIPTION:Peer SURFnet was unavailable to the NLR Layer 3 community. SURFnet NOC has provided that the cause of the outage was due to schedule circuit maintenance performed by their service provider.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7018&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070801T040001Z SUMMARY: 7024 NLR Layer 3 Backbone Circuit WASH-NEWY Maintenance Completed DTEND:20070801T100001Z DESCRIPTION:TICKET NUMBER: 7024\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSTART TIME: Wednesday, August 1, 2007, 6:23 AM (0623)\nEND TIME: Wednesday, August 1, 2007, 6:38 AM (0638)\nDESCRIPTION:Circuit provider Level (3) performed maintenance on the NLR Layer 3 Backbone Circuit WASH-NEWY. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7024&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070720T103001Z SUMMARY: 7022 NLR Layer 3 Member PSC Maintenance ***Tracking*** DTEND:20070720T113001Z DESCRIPTION:TICKET NUMBER: 7022\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member PSC\n\nSCHEDULED START TIME: Friday, July 20, 2007, 10:30 AM (1030)\nSCHEDULED END TIME: Friday, July 20, 2007, 11:30 AM (1130)\nDESCRIPTION:NLR Layer 3 Member PSC will be performing emergency maintenance. No outages are expected by this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7022&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070808T110001Z SUMMARY: 7023 NLR Layer 3 Circuits Spanning PHOE-LOSA Maintenance Completed DTEND:20070808T130001Z DESCRIPTION:TICKET NUMBER: 7023\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSTART TIME: Wednesday, August 8, 2007, 11:24 AM (1124)\nEND TIME: Wednesday, August 8, 2007, 11:38 AM (1138)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Winter Haven, CA. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7023&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070814T100001Z SUMMARY: 7041 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070814T120001Z DESCRIPTION:TICKET NUMBER: 7041\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, August 14, 2007, 11:40 AM (1140)\nEND TIME: Tuesday, August 14, 2007, 11:43 AM (1143)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Boise, ID. Outages were expected throughout the maintenance window. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7041&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070731T123001Z SUMMARY: 7033 NLR Layer 3 Peer Los Nettos Maintenance Completed DTEND:20070731T133001Z DESCRIPTION:TICKET NUMBER: 7033\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer Los Nettos\n\nSTART TIME: Tuesday, July 31, 2007, 12:36 PM (1236)\nEND TIME: Tuesday, July 31, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 3 Peer Los Nettos will be unavailable to the NLR Community due to scheduled hardware maintenance. The entire maintenance window has been reserved for this maintenance. Please note this maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7033&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070731T030001Z SUMMARY: 7032 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20070731T050001Z DESCRIPTION:TICKET NUMBER: 7032\nMAINTENANCE TYPE: Software\nAFFECTED: Peer SURFnet's Connection to NLR\n\nSCHEDULED START TIME: Tuesday, July 31, 2007, 3:00 AM (0300)\nSCHEDULED END TIME: Tuesday, July 31, 2007, 5:00 AM (0500)\nDESCRIPTION:NLR Layer 3 Peer SURFnet will be performing maintenance on their equipment during the above maintenance window. A brief outage is expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7032&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070807T030001Z SUMMARY: 7046 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20070807T120001Z DESCRIPTION:TICKET NUMBER: 7046\nMAINTENANCE TYPE: Software\nAFFECTED: Peer SURFnet\n\nSTART TIME: Tuesday, August 7, 2007, 3:29 AM (0329)\nEND TIME: Tuesday, August 7, 2007, 7:39 AM (0739)\nDESCRIPTION:NLR Layer 3 Peer SURFnet is performing maintenance on their equipment. The maintenance has been completed\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7046&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070913T050101Z SUMMARY: 7149 NLR Layer 3 Peer CA*Net 4 (CHIC) Maintenance Completed. DTEND:20070913T110001Z DESCRIPTION:TICKET NUMBER: 7149\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Thursday, September 13, 2007, 8:34 AM (0834)\nEND TIME: Thursday, September 13, 2007, 8:46 AM (0846)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 will be performing circuit relocation on their connection to NLR Layer 3. An outage of up to 30 minutes is expected. However, the entire maintenance window has been reserved. Traffic will reroute during the maintenance.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7149&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070911T010001Z SUMMARY: 7150 NLR Layer 3 Peer CA*Net 4 (CHIC) Maintenance Completed DTEND:20070911T040001Z DESCRIPTION:TICKET NUMBER: 7150\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Tuesday, September 11, 2007, 1:17 AM (0117)\nEND TIME: Tuesday, September 11, 2007, 1:20 AM (0120)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 have performed circuit relocation on their connection to NLR Layer 3. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7150&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070914T143001Z SUMMARY: 7170 UNM Backup 1G Packetnet NLR circuit Maintenance Completed DTEND:20070914T163001Z DESCRIPTION:TICKET NUMBER: 7170\nMAINTENANCE TYPE: Software\nAFFECTED: The NLR-1G PacketNet backup \n505 G1/3\n\nSTART TIME: Friday, September 14, 2007, 3:46 PM (1546)\nEND TIME: Friday, September 21, 2007, 5:22 PM (1722)\nDESCRIPTION:The NLR-1G PacketNet backup 505 G1/3 under-went some circuit Maintenance. Engineers trouble-shooted some issues that arose during their maintenance earlier in the week. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7170&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070914T070101Z SUMMARY: 7156 NLR Layer 3 IXP PacWave (LOSA) Maintenance Completed DTEND:20070914T120001Z DESCRIPTION:TICKET NUMBER: 7156\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer UltraLight*\nPeer Los Nettos*\n\nSTART TIME: Friday, September 14, 2007, 7:13 AM (0713)\nEND TIME: Friday, September 14, 2007, 7:49 AM (0749)\nDESCRIPTION:NLR Layer 3 IXP PacWave have performed maintenance on their equipment in Los Angeles, CA. Maintenance has been completed. * denotes multi-homed peer. Traffic will reroute. ***Note additional Peer(s) affected***\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7156&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070919T070001Z SUMMARY: 7157 NLR Layer 3 Backbone Circuit NEWY-CHIC Maintenance Completed DTEND:20070919T090001Z DESCRIPTION:TICKET NUMBER: 7157\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, September 19, 2007, 7:13 AM (0713)\nEND TIME: Wednesday, September 19, 2007, 7:22 AM (0722)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Conneaut, OH. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7157&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070820T060001Z SUMMARY: 7075 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Canceled DTEND:20070820T080001Z DESCRIPTION:TICKET NUMBER: 7075\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Monday, August 20, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Monday, August 20, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Rawlins, WY. A brief outage is expected. However, the entire maintenance window has been reserved. This maintenance has been canceled.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7075&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070827T040001Z SUMMARY: 7076 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070827T060001Z DESCRIPTION:TICKET NUMBER: 7076\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Monday, August 27, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Monday, August 27, 2007, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, repalced a failing card in Dinwiddie, VA. No outage was incurred.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7076&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070820T080001Z SUMMARY: 7070 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070820T100001Z DESCRIPTION:TICKET NUMBER: 7070\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, August 20, 2007, 8:07 AM (0807)\nEND TIME: Monday, August 20, 2007, 8:14 AM (0814)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Dexter, MI. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7070&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070809T103001Z SUMMARY: 7072 NLR Layer 3 Backbone Circuit ATLA-STAR Emergency Maintenance Completed DTEND:20070809T113001Z DESCRIPTION:TICKET NUMBER: 7072\nMAINTENANCE TYPE: Circuit\nAFFECTED: ORNL-ATLA-STAR-10GE-2\n\nSTART TIME: Thursday, August 9, 2007, 10:53 AM (1053)\nEND TIME: Thursday, August 9, 2007, 11:33 AM (1133)\nDESCRIPTION:NLR Backbone Circuit ATLA-STAR will be unavailable to the NLR Community due to fiber maintenance. Outages are expected throughout the maintenance window. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7072&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070820T040001Z SUMMARY: 7074 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070820T060001Z DESCRIPTION:TICKET NUMBER: 7074\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, August 20, 2007, 4:08 AM (0408)\nEND TIME: Monday, August 20, 2007, 4:12 AM (0412)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Raleigh, NC. maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7074&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070917T190001Z SUMMARY: 7172 NLR Layer 3 IXP PacWave Emergency Maintenance Completed DTEND:20070917T191501Z DESCRIPTION:TICKET NUMBER: 7172\nMAINTENANCE TYPE: Hardware\nAFFECTED: IXP PacWave\n\nSCHEDULED START TIME: Monday, September 17, 2007, 7:00 PM (1900)\nSCHEDULED END TIME: Monday, September 17, 2007, 7:15 PM (1915)\nDESCRIPTION:NLR Layer 3 Peer Pacific Northwest Gigapop (AS101) will be performing maintenance which will result in approximately a 5 minute outage in its peering to Pacific Wave.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7172&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070816T150001Z SUMMARY: 7089 NLR Layer 3 Member UNM Emergency Maintenance Completed DTEND:20070816T170001Z DESCRIPTION:TICKET NUMBER: 7089\nMAINTENANCE TYPE: Software\nAFFECTED: UNM's Primary Connection\n\nSTART TIME: Thursday, August 16, 2007, 3:13 PM (1513)\nEND TIME: Thursday, August 16, 2007, 3:45 PM (1545)\nDESCRIPTION:NLR Layer 3 Member University of New Mexico will be performing maintenance on their primary connection to PacketNet. A brief outage is expected. However, the entire maintenance window has been reserved. Traffic will reroute during maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7089&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070820T060001Z SUMMARY: 7090 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070820T080001Z DESCRIPTION:TICKET NUMBER: 7090\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, August 20, 2007, 6:07 AM (0607)\nEND TIME: Monday, August 20, 2007, 6:30 AM (0630)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Boise, ID. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7090&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070815T110001Z SUMMARY: 7078 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070815T130001Z DESCRIPTION:TICKET NUMBER: 7078\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, August 15, 2007, 11:02 AM (1102)\nEND TIME: Wednesday, August 15, 2007, 11:06 AM (1106)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Suisun City, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:12 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7078&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070822T110001Z SUMMARY: 7079 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070822T130001Z DESCRIPTION:TICKET NUMBER: 7079\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, August 22, 2007, 11:03 AM (1103)\nEND TIME: Wednesday, August 22, 2007, 11:23 AM (1123)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in North Bend, WA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7079&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070813T060001Z SUMMARY: 7080 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20070813T080001Z DESCRIPTION:TICKET NUMBER: 7080\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Monday, August 13, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Monday, August 13, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Auburn, NE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7080&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070924T110001Z SUMMARY: 7167 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070924T130001Z DESCRIPTION:TICKET NUMBER: 7167\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, September 24, 2007, 11:03 AM (1103)\nEND TIME: Monday, September 24, 2007, 11:09 AM (1109)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7167&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070828T040001Z SUMMARY: 7083 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20070828T060001Z DESCRIPTION:TICKET NUMBER: 7083\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, August 28, 2007, 4:13 AM (0413)\nEND TIME: Tuesday, August 28, 2007, 4:18 AM (0418)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Toledo, OH. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7083&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070822T020001Z SUMMARY: 7107 NLR Layer 3 Member FLR Emergency Maintenance Completed DTEND:20070822T030001Z DESCRIPTION:TICKET NUMBER: 7107\nMAINTENANCE TYPE: Software\nAFFECTED: Member FLR Primary Connection\n\nSCHEDULED START TIME: Wednesday, August 22, 2007, 2:00 AM (0200)\nSCHEDULED END TIME: Wednesday, August 22, 2007, 3:00 AM (0300)\nDESCRIPTION:NLR Layer 3 Member FLR performed maintenance on their primary connection to PacketNet. The entire maintenance window has been completed. \nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7107&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070829T040001Z SUMMARY: 7093 NLR Route ATLA-WASH Maintenance Completed DTEND:20070829T060001Z DESCRIPTION:TICKET NUMBER: 7093\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, August 29, 2007, 4:08 AM (0408)\nEND TIME: Wednesday, August 29, 2007, 4:12 AM (0412)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Salisbury, NC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7093&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070828T040101Z SUMMARY: 7123 NLR Member CIC Participant Indiana GigaPOP Maintenance Completed DTEND:20070828T050001Z DESCRIPTION:TICKET NUMBER: 7123\nMAINTENANCE TYPE: Software\nAFFECTED: Member: CIC Participant\nIndiana GigaPOP\nhous.layer3.nlr.net;\nSCHEDULED START TIME: Tuesday, August 28, 2007, 4:01 AM (0401)\nSCHEDULED END TIME: Tuesday, August 28, 2007, 5:00 AM (0500)\nDESCRIPTION:Indiana GigaPOP Engineers have performed software maintenance. No outages detected, maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7123&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070919T220001Z SUMMARY: 7166 NLR Layer 3 Peer CA*Net 4-Toronto (CHIC) Maintenance Completed DTEND:20070920T035901Z DESCRIPTION:TICKET NUMBER: 7166\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*Net 4 (Toronto)\n\nSTART TIME: Wednesday, September 19, 2007, 10:12 PM (2212)\nEND TIME: Thursday, September 20, 2007, 3:58 AM (0358)\nDESCRIPTION:CA*Net Engineers have physically moved the Toronto router from the existing PoP (GT) to the Canarie PoP collocated at the ORION PoP. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7166&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070819T100001Z SUMMARY: 7101 NLR Layer 3 Member FLR Emergency Maintenance Completed DTEND:20070819T130001Z DESCRIPTION:TICKET NUMBER: 7101\nMAINTENANCE TYPE: Software\nAFFECTED: Member FLR\n\nSTART TIME: Sunday, August 19, 2007, 10:07 AM (1007)\nEND TIME: Sunday, August 19, 2007, 10:15 AM (1015)\nDESCRIPTION:Member FLR was unavailable to the NLR Layer 3 Community. FLR Engineers have reserved a 3 hour maintenance window while they perform configuration changes. Maintenance has been completed. FLR is multihomed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7101&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070903T110001Z SUMMARY: 7132 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070903T130001Z DESCRIPTION:TICKET NUMBER: 7132\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, September 3, 2007, 11:03 AM (1103)\nEND TIME: Monday, September 3, 2007, 11:22 AM (1122)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7132&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070905T070001Z SUMMARY: 7142 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070905T090001Z DESCRIPTION:TICKET NUMBER: 7142\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, September 5, 2007, 7:15 AM (0715)\nEND TIME: Wednesday, September 5, 2007, 7:21 AM (0721)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Platteville, CO. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7142&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070927T160001Z SUMMARY: 7198 NLR Layer 3 Peer CUDI Emergency Maintenance Completed DTEND:20070927T171501Z DESCRIPTION:TICKET NUMBER: 7198\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CUDI\n\nSTART TIME: Thursday, September 27, 2007, 4:02 PM (1602)\nEND TIME: Thursday, September 27, 2007, 5:01 PM (1701)\nDESCRIPTION:NLR Layer 3 Peer CUDI is currently available to the community. CUDI technicians have performed an emergency router maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7198&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070912T040001Z SUMMARY: 7155 NLR Layer 3 Backbone Circuit NEWY-WASH Emergency Maintenance Completed DTEND:20070912T100001Z DESCRIPTION:TICKET NUMBER: 7155\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSTART TIME: Wednesday, September 12, 2007, 5:59 AM (0559)\nEND TIME: Wednesday, September 12, 2007, 6:16 AM (0616)\nDESCRIPTION:NLR Fiber Provider Level(3) Communications have performed fiber relocation in Newark, NJ. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7155&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070910T070001Z SUMMARY: 7151 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070910T110001Z DESCRIPTION:TICKET NUMBER: 7151\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, September 10, 2007, 7:22 AM (0722)\nEND TIME: Monday, September 10, 2007, 7:27 AM (0727)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Sunnyvale, CA Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7151&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071205T060001Z SUMMARY: 7347 NLR Layer 3 Peer CA*Net 4 (CHIC) Maintenance Completed DTEND:20071205T120001Z DESCRIPTION:TICKET NUMBER: 7347\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSCHEDULED START TIME: Wednesday, December 5, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Wednesday, December 5, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 have performed fiber maintenance on their Winnipeg-Chicago OC192 circuit. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7347&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080225T050001Z SUMMARY: 7451 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080225T070001Z DESCRIPTION:TICKET NUMBER: 7451\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Monday, February 25, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Monday, February 25, 2008, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Norlina, NC. No outage occurred. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7451&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070828T100001Z SUMMARY: 7122 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20070828T120001Z DESCRIPTION:TICKET NUMBER: 7122\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Tuesday, August 28, 2007, 10:00 AM (1000)\nSCHEDULED END TIME: Tuesday, August 28, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted the replacement of a failing card in Olympia, WA. No outages were experienced. This maintenance was not successful and will be rescheduled for a future date\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7122&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070916T070101Z SUMMARY: 7171 NLR Layer 3 Peer CA*Net 4 (CHIC) Maintenance Completed DTEND:20070916T130001Z DESCRIPTION:TICKET NUMBER: 7171\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSCHEDULED START TIME: Sunday, September 16, 2007, 7:01 AM (0701)\nSCHEDULED END TIME: Sunday, September 16, 2007, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 performed circuit relocation on their connection to NLR Layer 3. An outage of up to 30 minutes is expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7171&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070910T060001Z SUMMARY: 7145 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20070910T080001Z DESCRIPTION:TICKET NUMBER: 7145\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Monday, September 10, 2007, 6:05 AM (0605)\nEND TIME: Monday, September 10, 2007, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Otis, CO. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7145&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070924T040001Z SUMMARY: 7158 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20070924T100001Z DESCRIPTION:TICKET NUMBER: 7158\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Monday, September 24, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Monday, September 24, 2007, 10:00 AM (1000)\nDESCRIPTION:Backbone Circuit ATLA-WASH will be unavailable as evel(3) Communications technician perform a fiber splice at Bogart, GA. No outages were detected.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7158&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070913T040001Z SUMMARY: 7159 NLR Layer 3 Backbone Circuit WASH-NEWY Emergency Maintenance Completed DTEND:20070913T100001Z DESCRIPTION:TICKET NUMBER: 7159\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSCHEDULED START TIME: Thursday, September 13, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, September 13, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Fiber Provider Level(3) Communications have performed fiber relocation in Newark, NJ. No outages had occurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7159&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080205T040001Z SUMMARY: 7443 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20080205T060001Z DESCRIPTION:TICKET NUMBER: 7443\nMAINTENANCE TYPE: Software\nAFFECTED: Peer SURFnet\n\nSTART TIME: Tuesday, February 5, 2008, 4:12 AM (0412)\nEND TIME: Tuesday, February 5, 2008, 4:26 AM (0426)\nDESCRIPTION:NLR Layer 3 peer SURFnet have performed maintenance to upgrade their border router. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7443&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070919T090001Z SUMMARY: 7163 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070919T130001Z DESCRIPTION:TICKET NUMBER: 7163\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, September 19, 2007, 9:05 AM (0905)\nEND TIME: Wednesday, September 19, 2007, 9:25 AM (0925)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Ontario, OR. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7163&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070921T160001Z SUMMARY: 7181 NLR Layer 3 Peer University of New Mexico Maintenance Completed ***Tracking*** DTEND:20070921T180001Z DESCRIPTION:TICKET NUMBER: 7181\nMAINTENANCE TYPE: Software\nAFFECTED: University of New Mexico\n\nSCHEDULED START TIME: Friday, September 21, 2007, 4:00 PM (1600)\nSCHEDULED END TIME: Friday, September 21, 2007, 6:00 PM (1800)\nDESCRIPTION:NLR Layer 3 Peer University of New Mexico backup connection will be unavailable due to some testing to resolve DWDM issues. The entire maintenance window is reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7181&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071121T060001Z SUMMARY: 7333 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20071121T120001Z DESCRIPTION:TICKET NUMBER: 7333\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Wednesday, November 21, 2007, 6:00 AM (0600)\nSCHEDULED END TIME: Wednesday, November 21, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 Backbone Circuit ATLA-HOUS underwent circuit maintenance. NLR fiber provider Level(3) Communications performed fiber relocation in Baton Rouge, LA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7333&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070830T040001Z SUMMARY: 7124 NLR Layer 3 Router WASH RP Maintenance Completed DTEND:20070830T050001Z DESCRIPTION:TICKET NUMBER: 7124\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-ATLA-WASH-10GE-64\nNLR-NEWY-WASH-10GE-98\nNLR-NEWY-WASH-10GE-99\nMember PSC Primary\nMember MATP Primary\nBackup to NCLR\nBackup to NeLR\nwash.layer3.nlr.net;\nSTART TIME: Thursday, August 30, 2007, 4:05 AM (0405)\nEND TIME: Thursday, August 30, 2007, 4:07 AM (0407)\nDESCRIPTION:NLR Layer 2/3 Engineering have performed software maintenance on the WASH-CRS. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7124&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070918T040001Z SUMMARY: 7140 NLR Member CIC OmniPoP's Participant Indiana GigaPOP Emergency Maintenance Completed DTEND:20070918T080001Z DESCRIPTION:TICKET NUMBER: 7140\nMAINTENANCE TYPE: Software\nAFFECTED: Member CIC Participant\n\nSTART TIME: Tuesday, September 18, 2007, 4:05 AM (0405)\nEND TIME: Tuesday, September 18, 2007, 5:00 AM (0500)\nDESCRIPTION:Indiana GigaPOP Engineers have performed an emergency software maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7140&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070924T070001Z SUMMARY: 7184 NLR Layer 3 IXP Pacific Wave Emergency Maintenance Completed DTEND:20070924T110001Z DESCRIPTION:TICKET NUMBER: 7184\nMAINTENANCE TYPE: Hardware\nAFFECTED: IXP Pacifc Wave And its Peers\n\nSTART TIME: Monday, September 24, 2007, 8:10 AM (0810)\nEND TIME: Monday, September 24, 2007, 8:18 AM (0818)\nDESCRIPTION:Pacific Wave's fiber provider have performed an emergency maintenance in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7184&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070910T100001Z SUMMARY: 7146 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20070910T120001Z DESCRIPTION:TICKET NUMBER: 7146\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, September 10, 2007, 11:36 AM (1136)\nEND TIME: Monday, September 10, 2007, 11:40 AM (1140)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Platteville, CO. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7146&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070830T070101Z SUMMARY: 7143 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070830T081001Z DESCRIPTION:TICKET NUMBER: 7143\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, August 30, 2007, 8:10 AM (0810)\nEND TIME: Thursday, August 30, 2007, 8:11 AM (0811)\nDESCRIPTION:NLR Route SUNN-LOSA was unavailable to the community. NLR Layer 1 NOC engineering replaced the faulty optical pre-amp card in Soledad, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7143&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070919T034501Z SUMMARY: 7177 NLR Layer 3 Backbone Circuit ATLA-STAR Emergency Maintenance Completed DTEND:20070919T094501Z DESCRIPTION:TICKET NUMBER: 7177\nMAINTENANCE TYPE: Circuit\nAFFECTED: ORNL-ATLA-STAR-10GE-2\n\nSCHEDULED START TIME: Wednesday, September 19, 2007, 3:45 AM (0345)\nSCHEDULED END TIME: Wednesday, September 19, 2007, 9:45 AM (0945)\nDESCRIPTION:ORNL Engineers, with the assistance of a Qwest technician, performed fiber maintenance between Chicago and Schneider, Indiana. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7177&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070917T191701Z SUMMARY: 7178 NLR Layer 3 Member PacWave Maintenance Completed DTEND:20070918T173801Z DESCRIPTION:TICKET NUMBER: 7178\nMAINTENANCE TYPE: Software\nAFFECTED: Member PacWave\n\nSTART TIME: Monday, September 17, 2007, 7:17 PM (1917)\nEND TIME: Tuesday, September 18, 2007, 5:38 PM (1738)\nDESCRIPTION:Pacific Northwest Gigapop is now unavailable to the NLR Layer 3 community. Pacific Northwest Gigapop engineers report they have moved their PacketNet link to a new infrastructure. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7178&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071113T013001Z SUMMARY: 7327 NLR Layer 3 IXP Starlight Emergency Maintenance Completed DTEND:20071113T020001Z DESCRIPTION:TICKET NUMBER: 7327\nMAINTENANCE TYPE: Hardware\nAFFECTED: IXP Starlight\nPeer Ultralight\nPeer CANet\nPeer USGS\nPeer TWAREN\nPeer ESNet\nPeer GLORIAD\nPeer DREN\n\nSCHEDULED START TIME: Tuesday, November 13, 2007, 1:30 AM (0130)\nSCHEDULED END TIME: Tuesday, November 13, 2007, 2:00 AM (0200)\nDESCRIPTION:NLR Layer 3 IXP Starlight performed emergency maintenance during the above time. No outage was detected, during the maintenance.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7327&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071008T040001Z SUMMARY: 7215 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20071008T060001Z DESCRIPTION:TICKET NUMBER: 7215\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Monday, October 8, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Monday, October 8, 2007, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Gluck, SC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7215&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080204T030001Z SUMMARY: 7437 NLR Layer 3 Peer CA*Net4 (NEWY) Maintenance Completed DTEND:20080204T050001Z DESCRIPTION:TICKET NUMBER: 7437\nMAINTENANCE TYPE: Software\nAFFECTED: CA*Net (NEWY)\n\nSCHEDULED START TIME: Monday, February 4, 2008, 3:00 AM (0300)\nSCHEDULED END TIME: Monday, February 4, 2008, 5:00 AM (0500)\nDESCRIPTION:NLR Layer 3 Peer CA*net have performed maintenance in Montreal, QC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7437&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071030T040001Z SUMMARY: 7236 NLR Layer 3 Backbone Circuits Spanning CLEV-WASH Maintenance Cancelled DTEND:20071030T100001Z DESCRIPTION:TICKET NUMBER: 7236\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSCHEDULED START TIME: Tuesday, October 30, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, October 30, 2007, 10:00 AM (1000)\nDESCRIPTION:Maintenance has been cancelled. NLR Routes Spanning CLEV-WASH will undergo circuit maintenance by fiber provider Level(3) Communications. A two(2) hour outage is expected. However, the entire maintenance window is reserved. A back-out maintenance window has also been reserved for the ensuing night.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7236&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070922T130001Z SUMMARY: 7175 NLR Layer 3 Peer CA*Net4 (NEWY) Maintenance Completed DTEND:20070922T230001Z DESCRIPTION:TICKET NUMBER: 7175\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR Layer 3 Peer CA*Net4\n\nSTART TIME: Saturday, September 22, 2007, 2:29 PM (1429)\nEND TIME: Saturday, September 22, 2007, 10:22 PM (2222)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4 (NEWY) will be performing hardware maintenance during the above time frame. An outage of up to 6 hours is expected; however, the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7175&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070928T030001Z SUMMARY: 7200 NLR Layer 3 Peer CA*Net4 (NEWY) Emergency Maintenance Completed DTEND:20070928T040001Z DESCRIPTION:TICKET NUMBER: 7200\nMAINTENANCE TYPE: Circuit\nAFFECTED: CA*Net4 (NEWY)\n\nSTART TIME: Friday, September 28, 2007, 3:36 AM (0336)\nEND TIME: Friday, September 28, 2007, 3:49 AM (0349)\nDESCRIPTION:SINET Engineers with the assistance of circuit provider VSNL have replaced a failing card in NYC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7200&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071002T040001Z SUMMARY: 7206 NLR Layer 3 Backbone Circuit NEWY-CHIC Outage Resolved DTEND:20071002T100001Z DESCRIPTION:TICKET NUMBER: 7206\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\n\nSTART TIME: Tuesday, October 2, 2007, 4:43 AM (0443)\nEND TIME: Tuesday, October 2, 2007, 10:53 AM (1053)\nDESCRIPTION:NLR fiber provider, Level(3) Communications, have performed fiber relocation in Woodbury, NY. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7206&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071003T040001Z SUMMARY: 7202 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20071003T060001Z DESCRIPTION:TICKET NUMBER: 7202\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Wednesday, October 3, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Wednesday, October 3, 2007, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Gluck, SC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:13 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7202&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071002T040001Z SUMMARY: 7203 NLR Layer 3 Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20071002T060001Z DESCRIPTION:TICKET NUMBER: 7203\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, October 2, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, October 2, 2007, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Niles, MI. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7203&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071017T060001Z SUMMARY: 7232 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20071017T100001Z DESCRIPTION:TICKET NUMBER: 7232\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, October 17, 2007, 5:54 AM (0554)\nEND TIME: Wednesday, October 17, 2007, 8:31 AM (0831)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Ogden, UT. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7232&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070918T133001Z SUMMARY: 7179 NLR Layer 3 Member Pacific Northwest GigaPoP Maintenance Completed DTEND:20070918T233001Z DESCRIPTION:TICKET NUMBER: 7179\nMAINTENANCE TYPE: Power\nAFFECTED: Member Pacific Northwest GigaPoP\n\nSCHEDULED START TIME: Tuesday, September 18, 2007, 1:30 PM (1330)\nSCHEDULED END TIME: Tuesday, September 18, 2007, 11:30 PM (2330)\nDESCRIPTION:Member Pacific Northwest GigaPoP have performed power maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7179&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070922T065001Z SUMMARY: 7182 NLR Layer 3 Backbone Circuits Spanning PHOE-ELPA Emergency Maintenance Completed DTEND:20070922T120001Z DESCRIPTION:TICKET NUMBER: 7182\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSTART TIME: Saturday, September 22, 2007, 6:51 AM (0651)\nEND TIME: Saturday, September 22, 2007, 7:20 AM (0720)\nDESCRIPTION:NLR provider Level(3) Communications Technician has completed emergency circuit maintenance in El Paso, TX. Maintenance has been completed and service restored.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7182&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070923T043001Z SUMMARY: 7183 NLR Layer 3 Peer NCLR Emergency Maintenance Completed DTEND:20070923T080001Z DESCRIPTION:TICKET NUMBER: 7183\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer NCLR\n\nSTART TIME: Sunday, September 23, 2007, 4:46 AM (0446)\nEND TIME: Sunday, September 23, 2007, 4:49 AM (0449)\nDESCRIPTION:Peer NCLR will be performing emergency maintenance. An outage of 10 min is expected, however the entire maintenance window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7183&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070927T070001Z SUMMARY: 7195 NLR Layer 3 IXP Pacific Wave Emergency Maintenance Completed DTEND:20070927T090001Z DESCRIPTION:TICKET NUMBER: 7195\nMAINTENANCE TYPE: Circuit\nAFFECTED: IXP Pacific Wave\n\nSTART TIME: Thursday, September 27, 2007, 7:28 AM (0728)\nEND TIME: Thursday, September 27, 2007, 7:43 AM (0743)\nDESCRIPTION:IXP Pacific Wave have performed an emergency fiber maintenance in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7195&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070927T010001Z SUMMARY: 7191 NLR Layer 3 Backbone Circuit ATLA-STAR Emergency Maintenance Completed DTEND:20070927T070001Z DESCRIPTION:TICKET NUMBER: 7191\nMAINTENANCE TYPE: Circuit\nAFFECTED: ORNL-ATLA-STAR-10GE-2\n\nSTART TIME: Thursday, September 27, 2007, 1:48 AM (0148)\nEND TIME: Thursday, September 27, 2007, 5:36 AM (0536)\nDESCRIPTION:ORNL Engineers, with the assistance of a Qwest technician, have performed fiber maintenance between Chicago, IL and Schneider, Indiana. Maintenance had been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7191&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070927T070001Z SUMMARY: 7192 NLR Layer 3 Backbone Circuit LOSA-SEAT Emergency Maintenance Completed DTEND:20070927T090001Z DESCRIPTION:TICKET NUMBER: 7192\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, September 27, 2007, 7:28 AM (0728)\nEND TIME: Thursday, September 27, 2007, 7:43 AM (0743)\nDESCRIPTION:NLR Layer 1 NOC Engineering have replaced two failing cards along the LOSA-SEAT route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7192&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070926T180001Z SUMMARY: 7196 NLR Layer 3 Peer CUDI Emergency Maintenance Completed DTEND:20070926T190001Z DESCRIPTION:TICKET NUMBER: 7196\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CUDI\n\nSCHEDULED START TIME: Wednesday, September 26, 2007, 6:00 PM (1800)\nSCHEDULED END TIME: Wednesday, September 26, 2007, 7:00 PM (1900)\nDESCRIPTION:NLR Layer 3 Peer CUDI performed emergency router maintenance. A 1 hour window was reserved. Maintenance has been completed. *Peer is multi-homed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7196&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20070925T100001Z SUMMARY: 7193 NLR Layer 3 Peer SURFnet via NEWY Emergency Maintenance Completed DTEND:20070925T103001Z DESCRIPTION:TICKET NUMBER: 7193\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSCHEDULED START TIME: Tuesday, September 25, 2007, 10:00 AM (1000)\nSCHEDULED END TIME: Tuesday, September 25, 2007, 10:30 AM (1030)\nDESCRIPTION:NLR Layer 3 Peer Surfnet via NEWY performed emergency maintenance. No outages were detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7193&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071002T110001Z SUMMARY: 7194 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20071002T130001Z DESCRIPTION:TICKET NUMBER: 7194\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, October 2, 2007, 12:10 PM (1210)\nEND TIME: Tuesday, October 2, 2007, 12:23 PM (1223)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Sacramento, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7194&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071011T040001Z SUMMARY: 7209 NLR OOB Maintenance (All OOB Locations) Completed DTEND:20071011T100001Z DESCRIPTION:TICKET NUMBER: 7209\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Thursday, October 11, 2007, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, October 11, 2007, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 2/3 Engineers will be completing maintenance on the out of band network. This will cause the loss of monitoring throughout the maintenance window. However, this is not expected to have any impact on services.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7209&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071015T040001Z SUMMARY: 7229 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20071015T080001Z DESCRIPTION:TICKET NUMBER: 7229\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, October 15, 2007, 5:30 AM (0530)\nEND TIME: Monday, October 15, 2007, 6:02 AM (0602)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Salisbury, NC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7229&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071009T050001Z SUMMARY: 7216 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20071009T090001Z DESCRIPTION:TICKET NUMBER: 7216\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, October 9, 2007, 5:05 AM (0505)\nEND TIME: Tuesday, October 9, 2007, 5:10 AM (0510)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Grafton, NE. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7216&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071018T050001Z SUMMARY: 7237 NLR OOB Maintenance (CHIC and HOUS) Completed DTEND:20071018T090001Z DESCRIPTION:TICKET NUMBER: 7237\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Thursday, October 18, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, October 18, 2007, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 2/3 Engineers have completed maintenance on the out of band network. This will cause the loss of monitoring throughout the maintenance window. However, this is not expected to have any impact on services. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7237&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071024T154501Z SUMMARY: 7264 NLR Layer 3 Peer SURFnet Emergency Maintenance DTEND:20071024T160001Z DESCRIPTION:TICKET NUMBER: 7264\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Wednesday, October 24, 2007, 3:02 PM (1502)\nEND TIME: Wednesday, October 24, 2007, 3:11 PM (1511)\nDESCRIPTION:Peer SURFnet experienced a brief outage to the NLR Community. SURFnet Engineers indicated the outage was due to an emergency maintenance.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7264&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071030T050001Z SUMMARY: 7240 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Emergency Maintenance Completed DTEND:20071030T110001Z DESCRIPTION:TICKET NUMBER: 7240\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Tuesday, October 30, 2007, 8:46 AM (0846)\nEND TIME: Tuesday, October 30, 2007, 9:09 AM (0909)\nDESCRIPTION:NLR Fiber Provider Level(3), have performed circuit maintenance in St. Louis, MO. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7240&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080123T050001Z SUMMARY: 7420 NLR OOB Maintenance (SEAT) Cancelled ***Tracking*** DTEND:20080123T090001Z DESCRIPTION:TICKET NUMBER: 7420\nMAINTENANCE TYPE: Software\nAFFECTED: N/A - SEAT OOB\n\nSCHEDULED START TIME: Wednesday, January 23, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, January 23, 2008, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 2/3 Engineering will be performing maintenance on monitoring systems in Seattle, WA. No outages are expected. This maintenance has been canceled.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7420&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080123T080001Z SUMMARY: 7422 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080123T100001Z DESCRIPTION:TICKET NUMBER: 7422\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, January 23, 2008, 8:00 AM (0800)\nSCHEDULED END TIME: Wednesday, January 23, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a PNWGP technician, have replaced a failing card in Seattle, WA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7422&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071101T050001Z SUMMARY: 7243 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Cancelled DTEND:20071101T110001Z DESCRIPTION:TICKET NUMBER: 7243\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Thursday, November 1, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, November 1, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR Fiber Provider Level(3), will be performing circuit maintenance in St. Louis, MO. An outage of up to an hour in length is expected. However, the entire maintenance window has been reserved. ***Please note maintenance cancellation.***\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7243&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071030T060001Z SUMMARY: 7269 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20071030T080001Z DESCRIPTION:TICKET NUMBER: 7269\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, October 30, 2007, 6:00 AM (0600)\nEND TIME: Tuesday, October 30, 2007, 6:06 AM (0606)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Ogden, UT. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7269&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080204T023001Z SUMMARY: 7436 NLR Layer 3 Peer CA*Net-Toronto Maintenance Completed DTEND:20080204T043001Z DESCRIPTION:TICKET NUMBER: 7436\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CA*net-Toronto\n\nSCHEDULED START TIME: Monday, February 4, 2008, 2:30 AM (0230)\nSCHEDULED END TIME: Monday, February 4, 2008, 4:30 AM (0430)\nDESCRIPTION:NLR Layer 3 Peer CA*net-Toronto performed maintenance in Toronto, ON. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7436&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071022T060001Z SUMMARY: 7248 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20071022T080001Z DESCRIPTION:TICKET NUMBER: 7248\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, October 22, 2007, 6:10 AM (0610)\nEND TIME: Monday, October 22, 2007, 6:36 AM (0636)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Ogden, UT. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7248&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071024T040001Z SUMMARY: 7249 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20071024T060001Z DESCRIPTION:TICKET NUMBER: 7249\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Wednesday, October 24, 2007, 4:04 AM (0404)\nEND TIME: Wednesday, October 24, 2007, 4:28 AM (0428)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Pittsburgh, PA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7249&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071029T100001Z SUMMARY: 7262 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20071029T120001Z DESCRIPTION:TICKET NUMBER: 7262\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, October 29, 2007, 11:13 AM (1113)\nEND TIME: Monday, October 29, 2007, 11:20 AM (1120)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Pendleton, OR. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7262&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071025T050001Z SUMMARY: 7252 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20071025T110001Z DESCRIPTION:TICKET NUMBER: 7252\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Thursday, October 25, 2007, 6:16 AM (0616)\nEND TIME: Thursday, October 25, 2007, 6:49 AM (0649)\nDESCRIPTION:NLR's Fiber Provider, Level(3) Communications, conducted fiber relocation and splicing in Houston, TX. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7252&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071024T103001Z SUMMARY: 7263 NLR Layer 3 Member UIUC (via CIC) Maintenance Completed DTEND:20071024T110001Z DESCRIPTION:TICKET NUMBER: 7263\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member UIUC\n\nSTART TIME: Wednesday, October 24, 2007, 10:30 AM (1030)\nEND TIME: Wednesday, October 24, 2007, 10:34 AM (1034)\nDESCRIPTION:NLR Layer 3 Member UIUC will perform a reboot of one of their egress routers. 8-10 minutes of downtime is expected however the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7263&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071025T150001Z SUMMARY: 7267 NLR Layer 3 Member UNM Emergency Maintenance Completed DTEND:20071025T170001Z DESCRIPTION:TICKET NUMBER: 7267\nMAINTENANCE TYPE: Hardware\nAFFECTED: UNM's 1G Backup Connection\n\nSCHEDULED START TIME: Thursday, October 25, 2007, 3:00 PM (1500)\nSCHEDULED END TIME: Thursday, October 25, 2007, 5:00 PM (1700)\nDESCRIPTION:NLR Layer 3 Member UNM, with the assistance of a Level(3) Communications Technician, performed maintenance. Traffic was expected to reroute during this maintenance. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7267&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071023T140001Z SUMMARY: 7260 NLR Layer 3 Member UNM Emergency Maintenance Completed DTEND:20071023T150001Z DESCRIPTION:TICKET NUMBER: 7260\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member UNM\n\nSCHEDULED START TIME: Tuesday, October 23, 2007, 2:00 PM (1400)\nSCHEDULED END TIME: Tuesday, October 23, 2007, 3:00 PM (1500)\nDESCRIPTION:NLR Member UNM's Layer 3 connection underwent maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7260&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071023T200001Z SUMMARY: 7261 NLR Layer 3 Peer NM GigaPop Backup 1G Packetnet circuit Maintenance Completed DTEND:20071023T220001Z DESCRIPTION:TICKET NUMBER: 7261\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer NM GigaPop\n\nSCHEDULED START TIME: Tuesday, October 23, 2007, 8:00 PM (2000)\nSCHEDULED END TIME: Tuesday, October 23, 2007, 10:00 PM (2200)\nDESCRIPTION:NLR Layer 3 Peer NM GigaPop have performed maintenance to replace a failing card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7261&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071025T140001Z SUMMARY: 7265 NLR Layer 3 Member UNM Emergency Maintenance Completed DTEND:20071025T150001Z DESCRIPTION:TICKET NUMBER: 7265\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member UNM\n\nSCHEDULED START TIME: Thursday, October 25, 2007, 2:00 PM (1400)\nSCHEDULED END TIME: Thursday, October 25, 2007, 3:00 PM (1500)\nDESCRIPTION:NLR Member UNM's Layer 3 Connection will be unavailable to the NLR Community underwent maintenance. The entire maintenance window was reserved. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7265&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080204T020001Z SUMMARY: 7435 NLR Layer 3 Peer CA*Net4 (STTL) Maintenance Completed DTEND:20080204T040001Z DESCRIPTION:TICKET NUMBER: 7435\nMAINTENANCE TYPE: Software\nAFFECTED: Peer CA*Net 4 via PacWave*\n\nSCHEDULED START TIME: Monday, February 4, 2008, 2:00 AM (0200)\nSCHEDULED END TIME: Monday, February 4, 2008, 4:00 AM (0400)\nDESCRIPTION:Peer CA*Net4 performed software maintenance on equipment in Calgary, AB. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7435&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080128T230001Z SUMMARY: 7434 NLR Layer 3 Peer Surfnet Maintenance Completed DTEND:20080129T050001Z DESCRIPTION:TICKET NUMBER: 7434\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer Surfnet\n\nSTART TIME: Monday, January 28, 2008, 10:57 AM (1057)\nEND TIME: Tuesday, January 29, 2008, 4:25 AM (0425)\nDESCRIPTION:Peer Surfnet provider Global Crossing performed maintenance on their OC-48 circuit which involved moving their fibers from one device to another device. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7434&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071031T223001Z SUMMARY: 7272 NLR Layer 3 Peer ESnet (CHIC) Maintenance Manitenance DTEND:20071031T230001Z DESCRIPTION:TICKET NUMBER: 7272\nMAINTENANCE TYPE: Software\nAFFECTED: Member ESnet\n\nSTART TIME: Wednesday, October 31, 2007, 11:38 PM (2338)\nEND TIME: Wednesday, October 31, 2007, 11:45 PM (2345)\nDESCRIPTION:NLR Member ESnet performed software maintenance. A brief outage is expected during the maintenance. However, the entire maintenance window has been reserved. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7272&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071027T110001Z SUMMARY: 7273 NLR Layer 3 Peer CA*net4 Maintenance Completed DTEND:20071028T020001Z DESCRIPTION:TICKET NUMBER: 7273\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net4\n\nSTART TIME: Saturday, October 27, 2007, 11:40 AM (1140)\nEND TIME: Saturday, October 27, 2007, 6:17 PM (1817)\nDESCRIPTION:NLR Layer 3 Peer CA*net4 performed circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7273&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071105T050001Z SUMMARY: 7287 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20071105T070001Z DESCRIPTION:TICKET NUMBER: 7287\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Monday, November 5, 2007, 5:08 AM (0508)\nEND TIME: Monday, November 5, 2007, 5:41 AM (0541)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of Level(3) Communications Technician,replaced a failing card in Soperton, GA. A brief outage was expected. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7287&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071111T231301Z SUMMARY: 7322 NLR Layer 3 Peer SURFnet Emergency Maintenance Completed DTEND:20071112T012701Z DESCRIPTION:TICKET NUMBER: 7322\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Sunday, November 11, 2007, 11:13 PM (2313)\nEND TIME: Monday, November 12, 2007, 1:27 AM (0127)\nDESCRIPTION:NLR Layer 3 Peer SURFnet fiber provider, Global Crossing Side, will be conducting fiber maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7322&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071114T020001Z SUMMARY: 7329 NLR Layer 3 Peer SURFnet Emergency Maintenance Completed DTEND:20071114T030001Z DESCRIPTION:TICKET NUMBER: 7329\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Wednesday, November 14, 2007, 2:27 AM (0227)\nEND TIME: Wednesday, November 14, 2007, 2:30 AM (0230)\nDESCRIPTION:NLR Layer 3 Peer SURFnet's fiber provider have performed fiber maintenance in Brookhaven, NY. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7329&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071113T160001Z SUMMARY: 7326 NLR Layer 3 Peer CA*Net 4 (CHIC) Emergency Maintenance Completed DTEND:20071114T000001Z DESCRIPTION:TICKET NUMBER: 7326\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Tuesday, November 13, 2007, 7:57 PM (1957)\nEND TIME: Tuesday, November 13, 2007, 9:57 PM (2157)\nDESCRIPTION:Peer CA*Net 4 performed maintenance on their Winnipeg-Chicago OC192 circuit. Maintenance was not successful and they will perform another maintenance at a date and time yet to be announced.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7326&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071120T110001Z SUMMARY: 7338 NLR Layer 3 IXP Starlight Emergency Maintenance Completed DTEND:20071120T120001Z DESCRIPTION:TICKET NUMBER: 7338\nMAINTENANCE TYPE: Software\nAFFECTED: IXP Starlight\nPeer Ultralight*\nPeer CANet*\nPeer USGS\nPeer TWAREN*\nPeer ESNet*\nPeer GLORIAD\nPeer DREN*\n\nSCHEDULED START TIME: Tuesday, November 20, 2007, 11:00 AM (1100)\nSCHEDULED END TIME: Tuesday, November 20, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 IXP Starlight have performed emergency maintenance during the above time. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:14 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7338&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071121T160001Z SUMMARY: 7339 NLR Layer 3 Peer CA*Net 4 (CHIC) Emergency Maintenance Completed DTEND:20071121T180001Z DESCRIPTION:TICKET NUMBER: 7339\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Wednesday, November 21, 2007, 4:11 PM (1611)\nEND TIME: Wednesday, November 21, 2007, 5:37 PM (1737)\nDESCRIPTION:Peer CA*Net 4 have performed maintenance on their Winnipeg-Chicago OC192 circuit. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7339&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T053001Z SUMMARY: 7367 NLR Layer 3 Core Node ATLA Maintenance Completed DTEND:20071220T054501Z DESCRIPTION:TICKET NUMBER: 7367\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: ATLA and its Peers\natla.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:24 AM (0524)\nEND TIME: Thursday, December 20, 2007, 5:25 AM (0525)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Atlanta Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7367&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071205T130001Z SUMMARY: 7356 NLR Layer 3 Backbone Circuit CHIC-STAR Maintenance Completed DTEND:20071206T220001Z DESCRIPTION:TICKET NUMBER: 7356\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-STAR-10GE-169\n\nSCHEDULED START TIME: Wednesday, December 5, 2007, 1:00 PM (1300)\nSCHEDULED END TIME: Thursday, December 6, 2007, 10:00 PM (2200)\nDESCRIPTION:ORNL Engineers completed fiber maintenance on the circuits listed above. No outage was detected. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7356&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071213T010001Z SUMMARY: 7380 NLR Layer 3 Peer AMPATH Maintenance Cancelled DTEND:20071213T020001Z DESCRIPTION:TICKET NUMBER: 7380\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer AMPATH\n\nSCHEDULED START TIME: Thursday, December 13, 2007, 1:00 AM (0100)\nSCHEDULED END TIME: Thursday, December 13, 2007, 2:00 AM (0200)\nDESCRIPTION:NLR Layer 3 Peer AMPATH will be briefly unavailable while MAX Engineers perform circuit maintenance. Outage is expected to be brief, however, the entire maintenance window is reserved. ***Please note that this maintenance has been cancelled***\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7380&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080407T103001Z SUMMARY: 7525 NLR Connector MREN Emergency Maintenance Completed *TRACKING* DTEND:20080407T110001Z DESCRIPTION:TICKET NUMBER: 7525\nMAINTENANCE TYPE: Software\nAFFECTED: Connecter MREN and its\nParticipants\n\nSCHEDULED START TIME: Monday, April 7, 2008, 10:30 AM (1030)\nSCHEDULED END TIME: Monday, April 7, 2008, 11:00 AM (1100)\nDESCRIPTION:Connector MREN performed an emergency maintenance at the above time. No outage was detected. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7525&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071212T050001Z SUMMARY: 7377 NLR Layer 3 Backbone Circuits Spanning ATLA-RALE Emergency Maintenance Completed DTEND:20071212T110001Z DESCRIPTION:TICKET NUMBER: 7377\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\nNLR-ATLA-RALE-10GE-63\n\nSTART TIME: Wednesday, December 12, 2007, 9:19 AM (0919)\nEND TIME: Wednesday, December 12, 2007, 9:34 AM (0934)\nDESCRIPTION:NLR Fiber Provider, Level(3) Communications, have performed emergency fiber maintenance between ATLA-RALE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7377&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071010T213001Z SUMMARY: 7231 NLR Layer 3 Peer Los Nettos (SEAT) Emergency Maintenance DTEND:20071010T221501Z DESCRIPTION:TICKET NUMBER: 7231\nMAINTENANCE TYPE: Software\nAFFECTED: Peer Los Nettos (SEAT)\n\nSTART TIME: Wednesday, October 10, 2007, 9:41 PM (2141)\nEND TIME: Wednesday, October 10, 2007, 10:08 PM (2208)\nDESCRIPTION:NLR Layer 3 Peer Los Nettos is currently available. Los Nettos engineers identified the outage to a software maintenance they were performing. Connectivity has been restored. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7231&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071016T050101Z SUMMARY: 7239 NLR Layer 3 Backbone Circuits Spanning TULS-DALL Emergency Maintenance Completed DTEND:20071016T110001Z DESCRIPTION:TICKET NUMBER: 7239\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Tuesday, October 16, 2007, 7:18 AM (0718)\nEND TIME: Tuesday, October 16, 2007, 9:14 AM (0914)\nDESCRIPTION:NLR fiber provider, Level(3) Communications, have performed fiber splicing in Tulsa, OK. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7239&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080130T080001Z SUMMARY: 7407 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080130T130001Z DESCRIPTION:TICKET NUMBER: 7407\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, January 30, 2008, 8:10 AM (0810)\nEND TIME: Wednesday, January 30, 2008, 8:25 AM (0825)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of Level(3) and PNWG Technicians, have performed maintenance in Seattle, WA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7407&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080108T050001Z SUMMARY: 7405 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080108T070001Z DESCRIPTION:TICKET NUMBER: 7405\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Tuesday, January 8, 2008, 5:08 AM (0508)\nEND TIME: Tuesday, January 8, 2008, 5:41 AM (0541)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, was not able to replace a failing card in Cleveland, OH. Another future maintenance will be scheduled. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7405&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080114T050001Z SUMMARY: 7410 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20080114T100001Z DESCRIPTION:TICKET NUMBER: 7410\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Monday, January 14, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Monday, January 14, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of Level(3) Communications Technicians, have replaced failing cards in Atlanta, GA and Bogart, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7410&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080112T020001Z SUMMARY: 7411 NLR Layer 3 Peer CA*Net-Toronto Maintenance Completed DTEND:20080112T030001Z DESCRIPTION:TICKET NUMBER: 7411\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net-Toronto\n\nSTART TIME: Saturday, January 12, 2008, 2:02 AM (0202)\nEND TIME: Saturday, January 12, 2008, 2:33 AM (0233)\nDESCRIPTION:NLR Layer 3 Peer CA*net-Toronto replaced a faulty amplifier. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7411&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080116T090001Z SUMMARY: 7413 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080116T110001Z DESCRIPTION:TICKET NUMBER: 7413\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, January 16, 2008, 9:03 AM (0903)\nEND TIME: Wednesday, January 16, 2008, 9:24 AM (0924)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Cleveland, OH. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7413&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080125T120001Z SUMMARY: 7429 NLR Layer 3 Member MERIT via CIC Emergency Maintenance DTEND:20080128T050001Z DESCRIPTION:TICKET NUMBER: 7429\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member MERIT\n\nSTART TIME: Friday, January 25, 2008, 12:30 PM (1230)\nEND TIME: Monday, January 28, 2008, 4:11 PM (1611)\nDESCRIPTION:Member MERIT is now available to the NLR Layer 3 community. Connectivity has been restored. Merit engineers report outage was due to planned maintenance.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7429&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071127T130001Z SUMMARY: 7344 NLR Layer 3 Backbone Circuit CHIC-STAR Maintenance Completed DTEND:20071127T220001Z DESCRIPTION:TICKET NUMBER: 7344\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-STAR-10GE-169\n\nSCHEDULED START TIME: Tuesday, November 27, 2007, 1:00 PM (1300)\nSCHEDULED END TIME: Tuesday, November 27, 2007, 10:00 PM (2200)\nDESCRIPTION:ORNL Engineers have performed fiber maintenance on the circuits listed above. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7344&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071127T130001Z SUMMARY: 7345 NLR OOB Maintenance (SEAT) ***Tracking*** DTEND:20071127T150001Z DESCRIPTION:TICKET NUMBER: 7345\nMAINTENANCE TYPE: Circuit\nAFFECTED: None, only monitoring. \n\nSCHEDULED START TIME: Tuesday, November 27, 2007, 1:00 PM (1300)\nSCHEDULED END TIME: Tuesday, November 27, 2007, 3:00 PM (1500)\nDESCRIPTION:NLR's colocation provider in Seattle, WA will be transitioning equipment to their new management network. A loss of monitoring up to 20 minutes is expected. This is not expected to be service-impacting.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7345&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071121T063001Z SUMMARY: 7346 NLR Layer 3 Member UIUC (via CIC) Emergency Maintenance Completed DTEND:20071121T073001Z DESCRIPTION:TICKET NUMBER: 7346\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member UIUC\n\nSCHEDULED START TIME: Wednesday, November 21, 2007, 6:30 AM (0630)\nSCHEDULED END TIME: Wednesday, November 21, 2007, 7:30 AM (0730)\nDESCRIPTION:NLR Layer 3 Member UIUC have performed a software upgrade on one of their routers. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7346&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T054501Z SUMMARY: 7368 NLR Layer 3 Core Node CHIC Maintenance Completed DTEND:20071220T060001Z DESCRIPTION:TICKET NUMBER: 7368\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: CHIC and its Peers\nchic.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:36 AM (0536)\nEND TIME: Thursday, December 20, 2007, 5:37 AM (0537)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Chicago Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7368&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T060001Z SUMMARY: 7369 NLR Layer 3 Core Node HOUS Maintenance Completed DTEND:20071220T061501Z DESCRIPTION:TICKET NUMBER: 7369\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: HOUS and its Peers\nhous.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:30 AM (0530)\nEND TIME: Thursday, December 20, 2007, 5:31 AM (0531)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Houston Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7369&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T061501Z SUMMARY: 7370 NLR Layer 3 Core Node DENV Maintenance Completed DTEND:20071220T063001Z DESCRIPTION:TICKET NUMBER: 7370\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: DENV and its Peers\ndenv.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:40 AM (0540)\nEND TIME: Thursday, December 20, 2007, 5:41 AM (0541)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Denver Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7370&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080129T070001Z SUMMARY: 7430 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080129T090001Z DESCRIPTION:TICKET NUMBER: 7430\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, January 29, 2008, 7:06 AM (0706)\nEND TIME: Tuesday, January 29, 2008, 7:11 AM (0711)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Boise, ID. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7430&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T063001Z SUMMARY: 7371 NLR Layer 3 Core Node SEAT Maintenance Completed DTEND:20071220T064501Z DESCRIPTION:TICKET NUMBER: 7371\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: SEAT and its Peers\nseat.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:50 AM (0550)\nEND TIME: Thursday, December 20, 2007, 5:51 AM (0551)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Seattle Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7371&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071213T070001Z SUMMARY: 7386 NLR Layer 3 Peer DREN (CHIC) Emergency Maintenance Completed DTEND:20071213T080001Z DESCRIPTION:TICKET NUMBER: 7386\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR Peer DREN\n\nSTART TIME: Thursday, December 13, 2007, 7:05 AM (0705)\nEND TIME: Thursday, December 13, 2007, 7:13 AM (0713)\nDESCRIPTION:Peer DREN via CHIC was unavailable to the NLR community. DREN technicians were performing code upgrades on all of their their Juniper systems. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7386&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071214T080001Z SUMMARY: 7388 NLR Layer 3 Member Pacific Northwest GigaPoP (PNWGP) Maintenance Completed DTEND:20071214T130001Z DESCRIPTION:TICKET NUMBER: 7388\nMAINTENANCE TYPE: Software\nAFFECTED: Member PNWGP\n\nSTART TIME: Friday, December 14, 2007, 8:30 AM (0830)\nEND TIME: Friday, December 14, 2007, 8:36 AM (0836)\nDESCRIPTION:PNWGP will be intermittently unavailable while PNWGP Engineers perform emergency maintenance. Outages are expected to only be 10 minutes. However, the entire window is reserved. Maintenance completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7388&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071030T213001Z SUMMARY: 7281 NLR Layer 3 Peer ESnet Emergency Maintenance DTEND:20071030T220001Z DESCRIPTION:TICKET NUMBER: 7281\nMAINTENANCE TYPE: Software\nAFFECTED: Peer ESnet\n\nSTART TIME: Tuesday, October 30, 2007, 9:31 PM (2131)\nEND TIME: Tuesday, October 30, 2007, 9:38 PM (2138)\nDESCRIPTION:Peer ESnet was briefly unavailable as ESnet Engineers perform software maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7281&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071218T040001Z SUMMARY: 7391 NLR Layer 3 Member SLR Emergency Maintenance Completed DTEND:20071218T050001Z DESCRIPTION:TICKET NUMBER: 7391\nMAINTENANCE TYPE: Software\nAFFECTED: Connector SoX and its participants\n\nSTART TIME: Tuesday, December 18, 2007, 4:02 AM (0402)\nEND TIME: Tuesday, December 18, 2007, 4:08 AM (0408)\nDESCRIPTION:NLR Layer 3 Member SLR performed software maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7391&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071217T050001Z SUMMARY: 7381 NLR Layer 3 Backbone Circuits Spanning PITT-WASH Maintenance Completed DTEND:20071217T070001Z DESCRIPTION:TICKET NUMBER: 7381\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Monday, December 17, 2007, 5:04 AM (0504)\nEND TIME: Monday, December 17, 2007, 5:14 AM (0514)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Mclean, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7381&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071106T080001Z SUMMARY: 7288 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20071106T120001Z DESCRIPTION:TICKET NUMBER: 7288\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, November 6, 2007, 8:07 AM (0807)\nEND TIME: Tuesday, November 6, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, was replacing a failing card in Burney, CA. The maintenance was unsuccessful.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7288&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080130T070001Z SUMMARY: 7432 NLR Layer 3 Backbone Circuit DENV-SEAT Emergency Maintenance Completed DTEND:20080130T210001Z DESCRIPTION:TICKET NUMBER: 7432\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, January 30, 2008, 9:17 PM (2117)\nEND TIME: Wednesday, January 30, 2008, 9:25 PM (2125)\nDESCRIPTION:NLR Layer 3 NOC Engineers, with the assistance of a Cisco Optical Engineer who was onsite, have performed an emergency backplane maintenance in Fort Bridger, WY. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7432&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071106T050001Z SUMMARY: 7290 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20071106T110001Z DESCRIPTION:TICKET NUMBER: 7290\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSCHEDULED START TIME: Tuesday, November 6, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Tuesday, November 6, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR's Fiber Provider was relocating fiber near Pittsburgh, PA. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7290&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071112T010001Z SUMMARY: 7321 NLR Layer 3 Member CENIC Emergency Maintenance Completed DTEND:20071112T030001Z DESCRIPTION:TICKET NUMBER: 7321\nMAINTENANCE TYPE: Software\nAFFECTED: Member CENIC\n\nSCHEDULED START TIME: Monday, November 12, 2007, 1:00 AM (0100)\nSCHEDULED END TIME: Monday, November 12, 2007, 3:00 AM (0300)\nDESCRIPTION:NLR Layer 3 Member CENIC will be performing maintenance during the above time frame. No outage is expected; however, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7321&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071109T140001Z SUMMARY: 7318 NLR Layer 3 Peer CA*Net4 (NEWY) Emergency Maintenance Completed DTEND:20071109T160001Z DESCRIPTION:TICKET NUMBER: 7318\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR Layer 3 Peer CA*Net4\n\nSTART TIME: Friday, November 9, 2007, 2:14 PM (1414)\nEND TIME: Friday, November 9, 2007, 4:02 PM (1602)\nDESCRIPTION:NLR Layer 3 Peer CA*Net4 (NEWY) performed fiber maintenance during the above time frame. An outage of up to 30 minutes was expected; however, the entire maintenance window was reserved. Maintenance is complete. \nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7318&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071101T000001Z SUMMARY: 7292 NLR Layer 3 Peer CA*Net4 (STTL) Maintenance Completed DTEND:20071101T100001Z DESCRIPTION:TICKET NUMBER: 7292\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4 via PacWave*\n\nSTART TIME: Thursday, November 1, 2007, 12:30 AM (0030)\nEND TIME: Thursday, November 1, 2007, 9:15 AM (0915)\nDESCRIPTION:Peer CA*Net4 have performed maintenance on equipment in the Calgary Pop. Maintenance has been completed \nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7292&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071119T050001Z SUMMARY: 7295 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20071119T070001Z DESCRIPTION:TICKET NUMBER: 7295\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, November 19, 2007, 5:14 AM (0514)\nEND TIME: Monday, November 19, 2007, 5:21 AM (0521)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Mebane, NC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7295&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071115T080001Z SUMMARY: 7294 NLR Layer 3 Member CENIC (LOSA) Maintenance Completed DTEND:20071115T120001Z DESCRIPTION:TICKET NUMBER: 7294\nMAINTENANCE TYPE: Software\nAFFECTED: Member CENIC's Connection in LOSA\n\nSCHEDULED START TIME: Thursday, November 15, 2007, 8:00 AM (0800)\nSCHEDULED END TIME: Thursday, November 15, 2007, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 Member CENIC (LOSA) have performed an IOS upgrade on their router. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7294&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071108T180001Z SUMMARY: 7315 NLR Terminal OGDE Maintenance Completed DTEND:20071108T200001Z DESCRIPTION:TICKET NUMBER: 7315\nMAINTENANCE TYPE: Hardware\nAFFECTED: Terminal OGDE\n\nSCHEDULED START TIME: Thursday, November 8, 2007, 6:00 PM (1800)\nSCHEDULED END TIME: Thursday, November 8, 2007, 8:00 PM (2000)\nDESCRIPTION:NLR Layer 2/3 Engineering, with the assistance of a Level(3) Communications Technician, troubleshooted power issues in Ogden, UT. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7315&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071106T020001Z SUMMARY: 7300 NLR Layer 3 Peer CA*Net4 (CHIC) Emergency Maintenance Cancelled DTEND:20071106T030001Z DESCRIPTION:TICKET NUMBER: 7300\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4 (CHIC)\n\nSCHEDULED START TIME: Tuesday, November 6, 2007, 2:00 AM (0200)\nSCHEDULED END TIME: Tuesday, November 6, 2007, 3:00 AM (0300)\nDESCRIPTION:**Please note this maintenance has been cancelled** Peer CA*Net4 will perform circuit maintenance. Work is expected to take fifteen (15) minutes. However, the entire maintenance window has been reserved. Traffic will reroute during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7300&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071109T080001Z SUMMARY: 7299 NLR Layer 3 Member CENIC (SUNN) Maintenance Completed DTEND:20071109T120001Z DESCRIPTION:TICKET NUMBER: 7299\nMAINTENANCE TYPE: Software\nAFFECTED: Member CENIC's Connection in SUNN\n\nSTART TIME: Friday, November 9, 2007, 10:18 AM (1018)\nEND TIME: Friday, November 9, 2007, 10:36 AM (1036)\nDESCRIPTION:CENIC upgraded their Sunnyvale backbone router IOS. The planned outage time was not established, however, the entire maintenance window has been observed. *Denotes multihomed status.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7299&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071106T160001Z SUMMARY: 7302 NLR Layer 3 Peer NM Gigapop Emergency Maintenance Completed DTEND:20071106T200001Z DESCRIPTION:TICKET NUMBER: 7302\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer NM Gigapop\n\nSCHEDULED START TIME: Tuesday, November 6, 2007, 4:00 PM (1600)\nSCHEDULED END TIME: Tuesday, November 6, 2007, 8:00 PM (2000)\nDESCRIPTION:Peer NM Gigapop's connection to the NLR community underwent hardware maintenance. Maitnenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7302&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080117T030001Z SUMMARY: 7419 NLR Layer 3 Peer redCLARA & RNP Emergency Maintenance Completed DTEND:20080117T040001Z DESCRIPTION:TICKET NUMBER: 7419\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer redCLARA & RNP via\nAtlantic Wave (WASH)\n\nSTART TIME: Wednesday, January 16, 2008, 3:08 AM (0308)\nEND TIME: Wednesday, January 16, 2008, 3:09 AM (0309)\nDESCRIPTION:Peer redCLARA & RNP was unavailable to the NLR community, while engineers work with Atlantic Wave to perform routing changes. Maintenance has been completed\nTIMESTAMP: Sat Nov 7 11:03:15 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7419&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T050001Z SUMMARY: 7395 NLR Layer 3 Backbone Circuits Spanning CLEV-WASH Emergency Maintenance Cancelled DTEND:20071220T110001Z DESCRIPTION:TICKET NUMBER: 7395\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSCHEDULED START TIME: Thursday, December 20, 2007, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, December 20, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR Routes Spanning CLEV-WASH will undergo circuit maintenance as Level(3) Communications performs a hot cut at Beaver Falls, PA. An outage of 2 hours is expected. However, the entire window has been reserved. Please note, this maintenance has been canceled.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7395&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071120T070001Z SUMMARY: 7325 NLR OOB Maintenance (SEAT and DENV) Completed DTEND:20071120T110001Z DESCRIPTION:TICKET NUMBER: 7325\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Tuesday, November 20, 2007, 7:00 AM (0700)\nSCHEDULED END TIME: Tuesday, November 20, 2007, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 2/3 Engineers will perform maintenance on the out of band network. This will cause the loss of monitoring throughout the maintenance window. However, this is not expected to have any impact on services.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7325&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071219T020001Z SUMMARY: 7378 NLR Layer 3 Peer CA*Net Emergency Maintenance Completed DTEND:20071219T040001Z DESCRIPTION:TICKET NUMBER: 7378\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*Net (SEAT)\n\nSTART TIME: Wednesday, December 19, 2007, 2:01 AM (0201)\nEND TIME: Wednesday, December 19, 2007, 2:10 AM (0210)\nDESCRIPTION:NLR Peer CA*Net will be performing hardware maintenance in Vancouver, BC. No outages are expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7378&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071120T060001Z SUMMARY: 7332 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20071120T120001Z DESCRIPTION:TICKET NUMBER: 7332\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Tuesday, November 20, 2007, 9:23 AM (0923)\nEND TIME: Tuesday, November 20, 2007, 9:49 AM (0949)\nDESCRIPTION:NLR fiber provider, Level(3) Communications, have performed fiber relocation in Baton Rouge, LA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7332&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080107T080001Z SUMMARY: 7404 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080107T100001Z DESCRIPTION:TICKET NUMBER: 7404\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Monday, January 7, 2008, 8:00 AM (0800)\nSCHEDULED END TIME: Monday, January 7, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Burney, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7404&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071127T130001Z SUMMARY: 7348 NLR Layer 3 Member Pacific Northwest Gigapop DNS servers ***Tracking Only*** DTEND:20071127T150001Z DESCRIPTION:TICKET NUMBER: 7348\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR Layer 3 Member Pacific\nNorthwest Gigapop\n\nSCHEDULED START TIME: Tuesday, November 27, 2007, 1:00 PM (1300)\nSCHEDULED END TIME: Tuesday, November 27, 2007, 3:00 PM (1500)\nDESCRIPTION:NLR Layer 3 Member Pacific Northwest Gigapop performed a migration of their DNS servers. maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7348&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071115T140001Z SUMMARY: 7335 NLR SC07 via Los Angeles Emergency Maintenance DTEND:20071115T150001Z DESCRIPTION:TICKET NUMBER: 7335\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSCHEDULED START TIME: Thursday, November 15, 2007, 2:00 PM (1400)\nSCHEDULED END TIME: Thursday, November 15, 2007, 3:00 PM (1500)\nDESCRIPTION:Caltech Engineers will be rebooting their Ultralight Cisco switch at Los Angeles. A 5-10 minute outage is expected.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7335&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071227T120001Z SUMMARY: 7399 NLR Layer 3 IXP Starlight Emergency Maintenance Completed DTEND:20071227T130001Z DESCRIPTION:TICKET NUMBER: 7399\nMAINTENANCE TYPE: Software\nAFFECTED: IXP Starlight\nPeer Ultralight\nPeer CANet\nPeer USGS\nPeer TWAREN\nPeer ESNet\nPeer GLORIAD\nPeer DREN\n\nSTART TIME: Thursday, December 27, 2007, 12:29 PM (1229)\nEND TIME: Thursday, December 27, 2007, 12:39 PM (1239)\nDESCRIPTION:NLR Layer 3 IXP Starlight performed emergency maintenance via Chicago. An outage of up to ten (10) minutes was expected. Maintenance is complete.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7399&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071115T140001Z SUMMARY: 7336 NLR SC07 via Los Angeles Emergency Maintenance DTEND:20071115T150001Z DESCRIPTION:TICKET NUMBER: 7336\nMAINTENANCE TYPE: Hardware\nAFFECTED: None \n\nSCHEDULED START TIME: Thursday, November 15, 2007, 2:00 PM (1400)\nSCHEDULED END TIME: Thursday, November 15, 2007, 3:00 PM (1500)\nDESCRIPTION:Caltech Engineers will be rebooting their Ultralight Cisco switch at Los Angeles. A 5-10 minute outage is expected.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7336&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071206T010001Z SUMMARY: 7351 NLR Layer 3 Member TransPAC2 Maintenance Completed DTEND:20071206T040001Z DESCRIPTION:TICKET NUMBER: 7351\nMAINTENANCE TYPE: Software\nAFFECTED: Peer TransPAC2\n\nSTART TIME: Tuesday, December 4, 2007, 4:56 PM (1656)\nEND TIME: Tuesday, December 4, 2007, 6:51 PM (1851)\nDESCRIPTION:NLR Layer 3 Member TransPAC2 performed software upgrade to their routers TPR5 and TPR6. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7351&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071203T160001Z SUMMARY: 7355 NLR Layer 3 Member TransPAC2 Emergency Maintenance Completed. DTEND:20071203T190001Z DESCRIPTION:TICKET NUMBER: 7355\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member TransPAC2\n\nSTART TIME: Monday, December 3, 2007, 4:18 PM (1618)\nEND TIME: Monday, December 3, 2007, 5:40 AM (0540)\nDESCRIPTION:TransPAC2 Engineers performed emergency maintenance on the TransPAC2 T320. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7355&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T051501Z SUMMARY: 7366 NLR Layer 3 Core Node WASH Maintenance Completed DTEND:20071220T053001Z DESCRIPTION:TICKET NUMBER: 7366\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: WASH and its Peers\nwash.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:20 AM (0520)\nEND TIME: Thursday, December 20, 2007, 5:21 AM (0521)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Washington D.C. Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7366&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080213T050001Z SUMMARY: 7438 NLR OOB Maintenance Completed DTEND:20080213T100001Z DESCRIPTION:TICKET NUMBER: 7438\nMAINTENANCE TYPE: Software\nAFFECTED: OOB Network\n\nSCHEDULED START TIME: Wednesday, February 13, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, February 13, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 2/3 Engineers performed maintenance on the out of band network. This caused the loss of monitoring throughout the maintenance window. However, this is not expected to have any impact on services. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7438&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071210T050001Z SUMMARY: 7357 NLR Layer 3 Backbone Circuits Spanning PITT-WASH Maintenance Completed DTEND:20071210T070001Z DESCRIPTION:TICKET NUMBER: 7357\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Monday, December 10, 2007, 5:08 AM (0508)\nEND TIME: Monday, December 10, 2007, 5:17 AM (0517)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, have replaced a failing card in Mclean, VA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7357&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071213T230001Z SUMMARY: 7373 NLR Layer 3 Peer CA*Net4 (NEWY) Maintenance Completed DTEND:20071214T010001Z DESCRIPTION:TICKET NUMBER: 7373\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*net 4 (NEWY)\n\nSTART TIME: Friday, December 14, 2007, 1:47 AM (0147)\nEND TIME: Friday, December 14, 2007, 2:04 AM (0204)\nDESCRIPTION:NLR Layer 3 Peer CA*Net performed maintenance on their Montreal-New York route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7373&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071204T170001Z SUMMARY: 7358 NLR Layer 3 Member UltraLight Emergency Maintenance Completed DTEND:20071204T180001Z DESCRIPTION:TICKET NUMBER: 7358\nMAINTENANCE TYPE: Software\nAFFECTED: Member Ultralight\n\nSTART TIME: Tuesday, December 4, 2007, 5:03 PM (1703)\nEND TIME: Tuesday, December 4, 2007, 5:10 PM (1710)\nDESCRIPTION:Member Ultralight Engineers performed software maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7358&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071220T050001Z SUMMARY: 7365 NLR Layer 3 Core Node NEWY Maintenance Completed DTEND:20071220T051501Z DESCRIPTION:TICKET NUMBER: 7365\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node: NEWY and its Peers\nnewy.layer3.nlr.net;\nSTART TIME: Thursday, December 20, 2007, 5:25 AM (0525)\nEND TIME: Thursday, December 20, 2007, 5:26 AM (0526)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the New York Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7365&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071213T170001Z SUMMARY: 7363 NLR Layer 3 Peer CA*Net 4 (CHIC) Maintenance Completed DTEND:20071213T180001Z DESCRIPTION:TICKET NUMBER: 7363\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net 4\n\nSTART TIME: Thursday, December 13, 2007, 5:14 PM (1714)\nEND TIME: Thursday, December 13, 2007, 5:21 PM (1721)\nDESCRIPTION:NLR Layer 3 Peer CA*Net 4 performed maintenance along their Winnipeg-Chicago OC192 circuit. A brief outage was incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7363&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071204T200001Z SUMMARY: 7359 NLR Layer 3 Member TransPAC2 Emergency Maintenance Completed DTEND:20071204T220001Z DESCRIPTION:TICKET NUMBER: 7359\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member TransPAC\n\nSTART TIME: Tuesday, December 4, 2007, 7:56 PM (1956)\nEND TIME: Tuesday, December 4, 2007, 9:51 PM (2151)\nDESCRIPTION:TransPAC2 Engineers will be performed emergency maintenance on the TransPAC2 T320. maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7359&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20071219T050001Z SUMMARY: 7361 NLR Layer 3 Backbone Circuits Spanning CLEV-WASH Maintenance Completed DTEND:20071219T110001Z DESCRIPTION:TICKET NUMBER: 7361\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Wednesday, December 19, 2007, 9:56 AM (0956)\nEND TIME: Wednesday, December 19, 2007, 11:02 AM (1102)\nDESCRIPTION:Backbone Circuits Spanning CLEV-WASH will undergo circuit maintenance as Level(3) Communications performed a hot cut at Beaver Falls, PA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7361&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080214T070001Z SUMMARY: 7450 NLR Layer 3 Backbone Circuit DENV-SEAT Emergency Maintenance Completed DTEND:20080214T110001Z DESCRIPTION:TICKET NUMBER: 7450\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Thursday, February 14, 2008, 7:00 AM (0700)\nSCHEDULED END TIME: Thursday, February 14, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced failing management hardware in Fort Bridger, WY. No outages were detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7450&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080214T170101Z SUMMARY: 7454 NLR Layer 3 Peer SURFnet Emergency Maintenance Completed DTEND:20080214T230001Z DESCRIPTION:TICKET NUMBER: 7454\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSCHEDULED START TIME: Thursday, February 14, 2008, 5:01 PM (1701)\nSCHEDULED END TIME: Thursday, February 14, 2008, 11:00 PM (2300)\nDESCRIPTION:Peer SURFnet has completed maintenance with the assistance of its circuit provider.No outage was experienced. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7454&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080227T074501Z SUMMARY: 7453 NLR Layer 3 Member TransPAC2 Maintenance Completed DTEND:20080227T140001Z DESCRIPTION:TICKET NUMBER: 7453\nMAINTENANCE TYPE: Software\nAFFECTED: Layer 3 Member TransPAC2\n\nSTART TIME: Wednesday, February 27, 2008, 11:30 AM (1130)\nEND TIME: Wednesday, February 27, 2008, 11:31 AM (1131)\nDESCRIPTION:NLR Layer 3 Member TransPAC2 was briefly unavailable. KDDI performed maintenance on their switches in Los Angeles, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7453&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080219T060001Z SUMMARY: 7456 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Cancelled DTEND:20080219T100001Z DESCRIPTION:TICKET NUMBER: 7456\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Tuesday, February 19, 2008, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, February 19, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Plainview, IL. A brief outage is expected. However, the entire maintenance window has been reserved. ***Please note maintenance has been cancelled***\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7456&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080220T110001Z SUMMARY: 7458 NLR Layer 3 Peer CA*Net4 (NEWY) Maintenance Cancellation DTEND:20080220T190001Z DESCRIPTION:TICKET NUMBER: 7458\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*net 4 (NEWY)\n\nSCHEDULED START TIME: Wednesday, February 20, 2008, 11:00 AM (1100)\nSCHEDULED END TIME: Wednesday, February 20, 2008, 7:00 PM (1900)\nDESCRIPTION:NLR Layer 3 Peer CA*Net will be performing maintenance on the OC-192 circuit between Tokyo and New York. Up to a sixty (60) minute outage is expected. However, the entire maintenance window has been reserved. ***Please note cancellation of Maintenance***\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7458&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080225T090001Z SUMMARY: 7462 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20080225T110001Z DESCRIPTION:TICKET NUMBER: 7462\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Monday, February 25, 2008, 9:04 AM (0904)\nEND TIME: Monday, February 25, 2008, 9:09 AM (0909)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, performed troubleshooting on equipment in Denver, CO. A brief outage was expected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7462&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080331T090001Z SUMMARY: 7508 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080331T110001Z DESCRIPTION:TICKET NUMBER: 7508\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Monday, March 31, 2008, 9:00 AM (0900)\nSCHEDULED END TIME: Monday, March 31, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Ontario, OR. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7508&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080228T020001Z SUMMARY: 7469 NLR Layer 3 Peer CANARIE Maintenance ***Tracking*** DTEND:20080228T050001Z DESCRIPTION:TICKET NUMBER: 7469\nMAINTENANCE TYPE: Software\nAFFECTED: \nSCHEDULED START TIME: Thursday, February 28, 2008, 2:00 AM (0200)\nSCHEDULED END TIME: Thursday, February 28, 2008, 5:00 AM (0500)\nDESCRIPTION:CANARIE will be upgrading the software on all CPL network elements between Seattle and Calgary. This maintenance is not expected to be service impacting, however it will be tracked through this ticket in the event of outages \nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7469&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080303T060001Z SUMMARY: 7470 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080303T080001Z DESCRIPTION:TICKET NUMBER: 7470\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, March 3, 2008, 7:03 AM (0703)\nEND TIME: Monday, March 3, 2008, 7:57 AM (0757)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Chicago, IL. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7470&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080305T060001Z SUMMARY: 7478 NLR Layer 3 Backbone Circuit ATLA-HOUS Emergency Maintenance Completed DTEND:20080305T080001Z DESCRIPTION:TICKET NUMBER: 7478\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Wednesday, March 5, 2008, 6:04 AM (0604)\nEND TIME: Wednesday, March 5, 2008, 6:09 AM (0609)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Basile, LA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7478&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080401T040001Z SUMMARY: 7498 NLR Layer 3 Backbone Circuit NEWY-WASH Maintenance Completed DTEND:20080401T100001Z DESCRIPTION:TICKET NUMBER: 7498\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSTART TIME: Tuesday, April 1, 2008, 8:13 AM (0813)\nEND TIME: Tuesday, April 1, 2008, 8:52 AM (0852)\nDESCRIPTION:NLR Layer 3 Backbone Circuit NEWY-WASH was unavailable to the NLR community as their fiber provider performed circuit maintenance. An outage of about an hour occurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7498&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080304T090001Z SUMMARY: 7474 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080304T110001Z DESCRIPTION:TICKET NUMBER: 7474\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, March 4, 2008, 10:09 AM (1009)\nEND TIME: Tuesday, March 4, 2008, 10:14 AM (1014)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a PNWGP Technician, replaced a failing card in Seattle, WA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7474&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080303T080001Z SUMMARY: 7477 NLR Layer 3 Backbone Circuit SEAT-LOSA Emergency Maintenance Completed DTEND:20080303T100001Z DESCRIPTION:TICKET NUMBER: 7477\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, March 3, 2008, 8:36 AM (0836)\nEND TIME: Monday, March 3, 2008, 8:39 AM (0839)\nDESCRIPTION:NLR Layer 3 Backbone Circuit SEAT-LOSA underwent emergency maintenance to swap a booster-AMP card in San Ardo, CA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7477&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080317T040001Z SUMMARY: 7479 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Cancelled DTEND:20080317T100001Z DESCRIPTION:TICKET NUMBER: 7479\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSCHEDULED START TIME: Monday, March 17, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Monday, March 17, 2008, 10:00 AM (1000)\nDESCRIPTION:This maintenance has been cancelled. Backbone Circuit CHIC-WASH will undergo maintenance as circuit provider Level(3) Communications will be splicing Metro fiber and long haul fiber in Detroit, MI. An outage of 60 minutes is expected, however the entire window is reserved.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7479&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080314T230001Z SUMMARY: 7494 NLR Layer 3 Backbone Circuit CHIC-STAR Maintenance Completed DTEND:20080314T233001Z DESCRIPTION:TICKET NUMBER: 7494\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-CHIC-STAR-10GE-126\n\nSTART TIME: Friday, March 14, 2008, 11:00 PM (2300)\nEND TIME: Friday, March 14, 2008, 11:04 PM (2304)\nDESCRIPTION:Starlight engineers have performed a switch reload to support IPv6. A brief outage was experienced. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7494&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080318T040001Z SUMMARY: 7482 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Cancelled DTEND:20080318T100001Z DESCRIPTION:TICKET NUMBER: 7482\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Tuesday, March 18, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, March 18, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV will undergo maintenance as Level(3) will be splices Metro fiber and long haul fiber due to Michigan Department of transportation road construction. An outage of up to one hour is expected; however the entire maintenance window is reserved. ***Maintenance has been cancelled***\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7482&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080326T050001Z SUMMARY: 7511 NLR Layer 3 Backbone Circuit DENV-SEAT Emergency Maintenance Completed DTEND:20080326T120001Z DESCRIPTION:TICKET NUMBER: 7511\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Wednesday, March 26, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, March 26, 2008, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineers, with the assistance of a Cisco Systems Technician, performed troubleshooting in Fort Bridger, WY. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7511&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080320T040001Z SUMMARY: 7488 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080320T100001Z DESCRIPTION:TICKET NUMBER: 7488\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Thursday, March 20, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, March 20, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 3 fiber provider Level(3) Communications performed splicing in Detroit, MI. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7488&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080317T050001Z SUMMARY: 7493 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080317T070001Z DESCRIPTION:TICKET NUMBER: 7493\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Monday, March 17, 2008, 5:02 AM (0502)\nEND TIME: Monday, March 17, 2008, 5:09 AM (0509)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Basile, LA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7493&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080311T090001Z SUMMARY: 7487 NLR Layer 3 Peer Florida LambdaRail Maintenance Completed DTEND:20080311T120001Z DESCRIPTION:TICKET NUMBER: 7487\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer Florida LambdaRail\n\nSTART TIME: Tuesday, March 11, 2008, 9:53 AM (0953)\nEND TIME: Tuesday, March 11, 2008, 9:54 AM (0954)\nDESCRIPTION:Peer Florida LambdaRail performed maintenance on their NLR facing core nodes. A brief outage was observed. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7487&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080310T050001Z SUMMARY: 7490 NLR Layer 3 Backbone Circuits Spanning TULS-DALL Emergency Maintenance Completed DTEND:20080310T070001Z DESCRIPTION:TICKET NUMBER: 7490\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Monday, March 10, 2008, 5:28 AM (0528)\nEND TIME: Monday, March 10, 2008, 5:30 AM (0530)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a card in Dallas, TX. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:16 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7490&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080320T080001Z SUMMARY: 7505 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20080320T100001Z DESCRIPTION:TICKET NUMBER: 7505\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Thursday, March 20, 2008, 8:03 AM (0803)\nEND TIME: Thursday, March 20, 2008, 9:02 AM (0902)\nDESCRIPTION:NLR Layer 3 Peer SURFnet is now available to the community. SURFnet engineers report this outage was due to scheduled circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7505&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080319T090001Z SUMMARY: 7499 NLR Layer 3 Backbone Circuit DENV-SEAT Emergency Maintenance Completed DTEND:20080319T110001Z DESCRIPTION:TICKET NUMBER: 7499\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Wednesday, March 19, 2008, 9:00 AM (0900)\nSCHEDULED END TIME: Wednesday, March 19, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, unsuccessfully replaced a failing card in Ontario, OR. A new card is being dispatched and a new maintenance window will be scheduled. This maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7499&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080325T060001Z SUMMARY: 7502 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080325T120001Z DESCRIPTION:TICKET NUMBER: 7502\nMAINTENANCE TYPE: Hardware\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Tuesday, March 25, 2008, 6:00 AM (0600)\nSCHEDULED END TIME: Tuesday, March 25, 2008, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Cisco Systems Technician, performed troubleshooting in Wahsatch, UT. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7502&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080319T040001Z SUMMARY: 7500 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Emergency Maintenance Completed DTEND:20080319T100001Z DESCRIPTION:TICKET NUMBER: 7500\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Wednesday, March 19, 2008, 4:39 AM (0439)\nEND TIME: Wednesday, March 19, 2008, 4:54 AM (0454)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV was unavailable while fiber provider Level(3) Communications performed splicing in Detroit, MI. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7500&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080319T080001Z SUMMARY: 7503 NLR Layer 3 Member LONI Emergency Maintenance Completed DTEND:20080319T110001Z DESCRIPTION:TICKET NUMBER: 7503\nMAINTENANCE TYPE: Hardware\nAFFECTED: Connector LONI\n\nSTART TIME: Wednesday, March 19, 2008, 9:04 AM (0904)\nEND TIME: Wednesday, March 19, 2008, 9:11 AM (0911)\nDESCRIPTION:NLR Layer 3 Member LONI was briefly unavailable to the NLR community. LONI Engineers informed us they performed an emergency maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7503&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080416T070001Z SUMMARY: 7528 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20080416T090001Z DESCRIPTION:TICKET NUMBER: 7528\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Wednesday, April 16, 2008, 7:07 AM (0707)\nEND TIME: Wednesday, April 16, 2008, 7:08 AM (0708)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in McLean, VA. The maintenance was not successful, and a second maintenance will be needed at a later date.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7528&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080415T080001Z SUMMARY: 7532 NLR Layer 3 Backbone Circuits Spanning HOUS-DALL Maintenance Completed DTEND:20080415T100001Z DESCRIPTION:TICKET NUMBER: 7532\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Tuesday, April 15, 2008, 8:00 AM (0800)\nSCHEDULED END TIME: Tuesday, April 15, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed maintenance along the HOUS-DALL Route. No outages occurred. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7532&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080414T070001Z SUMMARY: 7534 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20080414T090001Z DESCRIPTION:TICKET NUMBER: 7534\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Monday, April 14, 2008, 7:10 AM (0710)\nEND TIME: Monday, April 14, 2008, 7:12 AM (0712)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Hancock, MD. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7534&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080507T040001Z SUMMARY: 7561 NLR Layer 3 Backbone Circuits Spanning Maintenance Completed DTEND:20080507T060001Z DESCRIPTION:TICKET NUMBER: 7561\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\n\nSTART TIME: Wednesday, May 7, 2008, 4:34 AM (0434)\nEND TIME: Wednesday, May 7, 2008, 4:35 AM (0435)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Atlanta, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7561&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080413T050001Z SUMMARY: 7537 NLR Layer 3 Backbone Circuit Route ATLA-HOUS Emergency Maintenance Completed DTEND:20080413T110001Z DESCRIPTION:TICKET NUMBER: 7537\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Sunday, April 13, 2008, 8:04 AM (0804)\nEND TIME: Sunday, April 13, 2008, 8:06 AM (0806)\nDESCRIPTION:NLR Layer 3 Backbone Circuit ATLA-HOUS was briefly unavailable as Level 3 Communications performed fiber maintenance in Bruce, FL to install a longer patch cable. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7537&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080429T040001Z SUMMARY: 7547 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20080429T060001Z DESCRIPTION:TICKET NUMBER: 7547\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Tuesday, April 29, 2008, 4:09 AM (0409)\nEND TIME: Tuesday, April 29, 2008, 4:12 AM (0412)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in McLean, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7547&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080327T060001Z SUMMARY: 7515 NLR Layer 3 Backbone Circuit DENV-SEAT Emergency Maintenance Completed DTEND:20080327T120001Z DESCRIPTION:TICKET NUMBER: 7515\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Thursday, March 27, 2008, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, March 27, 2008, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, completed troubleshooting on management hardware in Fort Bridger, WY. No outages were detected, and maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7515&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080508T050001Z SUMMARY: 7562 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Cancelled DTEND:20080508T110001Z DESCRIPTION:TICKET NUMBER: 7562\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSCHEDULED START TIME: Thursday, May 8, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, May 8, 2008, 11:00 AM (1100)\nDESCRIPTION:**Please note this maintenance has been cancelled** NLR's Fiber Provider will be conducting fiber relocation in Comstock, TX. An outage of up to one hour is expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7562&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080415T040001Z SUMMARY: 7520 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20080415T060001Z DESCRIPTION:TICKET NUMBER: 7520\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Tuesday, April 15, 2008, 4:04 AM (0404)\nEND TIME: Tuesday, April 15, 2008, 4:11 AM (0411)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Pittsburgh, PA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7520&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080416T110001Z SUMMARY: 7521 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080416T130001Z DESCRIPTION:TICKET NUMBER: 7521\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, April 16, 2008, 11:19 AM (1119)\nEND TIME: Wednesday, April 16, 2008, 12:02 PM (1202)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Portland, OR. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7521&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080417T050001Z SUMMARY: 7518 MANLAN-OME GEANT Circuit via Global Crossing Maintenance (TRACKING) DTEND:20080417T063001Z DESCRIPTION:TICKET NUMBER: 7518\nMAINTENANCE TYPE: Circuit\nAFFECTED: \nSCHEDULED START TIME: Thursday, April 17, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, April 17, 2008, 6:30 AM (0630)\nDESCRIPTION:No outages detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7518&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080404T040001Z SUMMARY: 7519 NLR Layer 3 Backbone Circuit NEWY-WASH Emergency Maintenance Completed DTEND:20080404T100001Z DESCRIPTION:TICKET NUMBER: 7519\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSCHEDULED START TIME: Friday, April 4, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, April 4, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Fiber Provider Level(3) Communications relocated fiber in Baltimore, MD. No outage was dected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7519&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080416T040001Z SUMMARY: 7524 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080416T060001Z DESCRIPTION:TICKET NUMBER: 7524\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Wednesday, April 16, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Wednesday, April 16, 2008, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Norlina, NC. The replacement card was dead on arrival. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7524&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080409T170001Z SUMMARY: 7529 NLR Layer 3 Peer RedCLARA Emergency Maintenance Completed DTEND:20080409T180001Z DESCRIPTION:TICKET NUMBER: 7529\nMAINTENANCE TYPE: Software\nAFFECTED: Peer RedCLARA\n\nSCHEDULED START TIME: Wednesday, April 9, 2008, 5:00 PM (1700)\nSCHEDULED END TIME: Wednesday, April 9, 2008, 6:00 PM (1800)\nDESCRIPTION:Peer RedCLARA engineers performed hardware maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7529&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080410T080001Z SUMMARY: 7530 NLR Layer 3 Peer CA*Net (SEAT) Emergency Maintenance Completed DTEND:20080410T090001Z DESCRIPTION:TICKET NUMBER: 7530\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net (SEAT)*\n\nSTART TIME: Thursday, April 10, 2008, 8:13 AM (0813)\nEND TIME: Thursday, April 10, 2008, 8:25 AM (0825)\nDESCRIPTION:Peer CA*Net has become unavailable to the community. CA*Net4 engineers have been contacted, the outage was due to a scheduled maintenance. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7530&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080412T030001Z SUMMARY: 7533 NLR Layer 3 Backbone Circuit ATLA-HOUS Emergency Maintenance Completed DTEND:20080412T110001Z DESCRIPTION:TICKET NUMBER: 7533\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Saturday, April 12, 2008, 5:03 AM (0503)\nEND TIME: Saturday, April 12, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 3 Backbone Circuit ATLA-HOUS was unavailable to the community as Fiber provider Level(3) Communications performed emergency fiber maintenance in Bruce, FL. Maintenance has been completed. * Traffic Re-Routed\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7533&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080428T040001Z SUMMARY: 7546 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20080428T060001Z DESCRIPTION:TICKET NUMBER: 7546\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Monday, April 28, 2008, 4:07 AM (0407)\nEND TIME: Monday, April 28, 2008, 4:09 AM (0409)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Pittsburgh, PA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7546&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080415T040001Z SUMMARY: 7541 NLR Layer 3 Peer CAnet Maintenance Completed DTEND:20080415T100001Z DESCRIPTION:TICKET NUMBER: 7541\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CAnet\n\nSTART TIME: Tuesday, April 15, 2008, 6:37 AM (0637)\nEND TIME: Tuesday, April 15, 2008, 7:13 AM (0713)\nDESCRIPTION:Level(3) performed splicing for Connecticut Department of Transportation. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7541&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080417T050001Z SUMMARY: 7542 NLR Layer 3 Peer AMPATH and CLARA via AWave Emergency Maintenance Completed DTEND:20080417T120001Z DESCRIPTION:TICKET NUMBER: 7542\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer AMPATH, and CLARA via Awave\n\nSTART TIME: Thursday, April 17, 2008, 7:22 AM (0722)\nEND TIME: Thursday, April 17, 2008, 11:04 AM (1104)\nDESCRIPTION:Peers AMPATH and Clara via Awave was unavailable due to emergency maintenance. AMPATH engineers have completed this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7542&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080423T040001Z SUMMARY: 7544 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080423T060001Z DESCRIPTION:TICKET NUMBER: 7544\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, April 23, 2008, 1:04 AM (0104)\nEND TIME: Wednesday, April 23, 2008, 1:30 AM (0130)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Norlina, NC. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7544&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080419T080001Z SUMMARY: 7550 NLR Layer 3 Member MERIT Maintenance Completed DTEND:20080419T090001Z DESCRIPTION:TICKET NUMBER: 7550\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member MERIT via CIC\n\nSTART TIME: Saturday, April 19, 2008, 8:02 AM (0802)\nEND TIME: Saturday, April 19, 2008, 8:22 AM (0822)\nDESCRIPTION:NLR Layer 3 Member MERIT is now available to the community. MERIT engineers report the outage was due to schedule maintenance, which took place from 0800 - 0900 UTC.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7550&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080419T100001Z SUMMARY: 7551 NLR Layer 3 Member MERIT Emergency Maintenance Completed DTEND:20080419T130001Z DESCRIPTION:TICKET NUMBER: 7551\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member MERIT\n\nSTART TIME: Saturday, April 19, 2008, 10:42 AM (1042)\nEND TIME: Saturday, April 19, 2008, 12:04 PM (1204)\nDESCRIPTION:NLR Layer 3 Member MERIT is currently available to the community as MERIT engineers perform emergency maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7551&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080423T090001Z SUMMARY: 7552 NLR Layer 3 Backbone Circuit DENV-LOSA Maintenance Completed DTEND:20080423T110001Z DESCRIPTION:TICKET NUMBER: 7552\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-LOSA-10GE-90\n\nSCHEDULED START TIME: Wednesday, April 23, 2008, 9:00 AM (0900)\nSCHEDULED END TIME: Wednesday, April 23, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this route. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7552&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080423T110001Z SUMMARY: 7553 NLR Layer 3 Backbone Circuits Spanning PHOE-LOSA Maintenance Completed DTEND:20080423T130001Z DESCRIPTION:TICKET NUMBER: 7553\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-LOSA-10GE-90\nNLR-HOUS-LOSA-10GE-87\n\nSCHEDULED START TIME: Wednesday, April 23, 2008, 11:00 AM (1100)\nSCHEDULED END TIME: Wednesday, April 23, 2008, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this route. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7553&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080428T110001Z SUMMARY: 7554 NLR Layer 3 Backbone Circuits Spanning PHOE-LOSA Maintenance Canceled DTEND:20080428T130001Z DESCRIPTION:TICKET NUMBER: 7554\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\nNLR-DENV-LOSA-10GE-90\n\nSCHEDULED START TIME: Monday, April 28, 2008, 11:00 AM (1100)\nSCHEDULED END TIME: Monday, April 28, 2008, 1:00 PM (1300)\nDESCRIPTION:This maintenance has been canceled. NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Pomona, CA. A brief outage is expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7554&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080424T040001Z SUMMARY: 7555 NLR Layer 3 Backbone Circuit WASH-NEWY Maintenance Completed DTEND:20080424T060001Z DESCRIPTION:TICKET NUMBER: 7555\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSCHEDULED START TIME: Thursday, April 24, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Thursday, April 24, 2008, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this route. No outages were observed, this maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7555&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080424T060001Z SUMMARY: 7559 NLR Layer 3 Backbone Circuit NEWY-CHIC Emergency Maintenance Completed DTEND:20080424T080001Z DESCRIPTION:TICKET NUMBER: 7559\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Thursday, April 24, 2008, 6:00 AM (0600)\nSCHEDULED END TIME: Thursday, April 24, 2008, 8:00 AM (0800)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this route. No outages were observed, this maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7559&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080505T040001Z SUMMARY: 7558 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080505T060001Z DESCRIPTION:TICKET NUMBER: 7558\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, May 5, 2008, 4:19 AM (0419)\nEND TIME: Monday, May 5, 2008, 4:24 AM (0424)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Dahlgren, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7558&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080506T040001Z SUMMARY: 7564 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20080506T060001Z DESCRIPTION:TICKET NUMBER: 7564\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Tuesday, May 6, 2008, 4:57 AM (0457)\nEND TIME: Tuesday, May 6, 2008, 5:05 AM (0505)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Greensboro, NC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7564&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080428T170001Z SUMMARY: 7563 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed. DTEND:20080428T180001Z DESCRIPTION:TICKET NUMBER: 7563\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Monday, April 28, 2008, 5:00 PM (1700)\nSCHEDULED END TIME: Monday, April 28, 2008, 6:00 PM (1800)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Centerview, MO. No outages were incurred during this maintenance.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7563&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080516T040001Z SUMMARY: 7566 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080516T100001Z DESCRIPTION:TICKET NUMBER: 7566\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Friday, May 16, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, May 16, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR's Fiber Provider restored fiber near Jacksonville, FL. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7566&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080605T070001Z SUMMARY: 7645 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080605T130001Z DESCRIPTION:TICKET NUMBER: 7645\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, June 5, 2008, 7:17 AM (0717)\nEND TIME: Thursday, June 5, 2008, 9:44 AM (0944)\nDESCRIPTION:NLR Member CENIC performed fiber relocation along the SUNN-LOSA Route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7645&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080516T040001Z SUMMARY: 7597 NLR Layer 3 Backbone Circuit CHIC-WASH Emergency Maintenance Completed DTEND:20080516T100001Z DESCRIPTION:TICKET NUMBER: 7597\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Friday, May 16, 2008, 4:45 AM (0445)\nEND TIME: Friday, May 16, 2008, 9:10 AM (0910)\nDESCRIPTION:NLR's Fiber Provider performed fiber relocation near Akron, OH. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7597&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080505T110001Z SUMMARY: 7568 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080505T130001Z DESCRIPTION:TICKET NUMBER: 7568\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, May 5, 2008, 11:45 AM (1145)\nEND TIME: Monday, May 5, 2008, 11:50 AM (1150)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in La Grande, OR. A brief outage was incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7568&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080430T050001Z SUMMARY: 7570 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080430T070001Z DESCRIPTION:TICKET NUMBER: 7570\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSCHEDULED START TIME: Wednesday, April 30, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, April 30, 2008, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this circuit. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:17 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7570&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080430T070001Z SUMMARY: 7571 NLR Layer 3 Backbone Circuits Spanning RATO-DENV Maintenance Completed DTEND:20080430T090001Z DESCRIPTION:TICKET NUMBER: 7571\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-DENV-LOSA-10GE-90\nNLR-ALBU-DENV-10GE-95\n\nSCHEDULED START TIME: Wednesday, April 30, 2008, 7:00 AM (0700)\nSCHEDULED END TIME: Wednesday, April 30, 2008, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this route. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7571&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080430T090001Z SUMMARY: 7572 NLR Layer 3 Backbone Circuits Spanning KANS-TULS Maintenance Completed DTEND:20080430T110001Z DESCRIPTION:TICKET NUMBER: 7572\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Wednesday, April 30, 2008, 9:00 AM (0900)\nSCHEDULED END TIME: Wednesday, April 30, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 1 NOC Engineering performed software maintenance along this route. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7572&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080513T050001Z SUMMARY: 7573 NLR Layer 3 Backbone Circuits Spanning KANS-TULS Maintenance Completed DTEND:20080513T110001Z DESCRIPTION:TICKET NUMBER: 7573\nMAINTENANCE TYPE: Circuit\nAFFECTED: LR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Tuesday, May 13, 2008, 7:33 AM (0733)\nEND TIME: Tuesday, May 13, 2008, 7:34 AM (0734)\nDESCRIPTION:NLR's fiber provider conducted fiber relocation and splicing near Kansas City, MO. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7573&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080516T220001Z SUMMARY: 7608 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20080517T050001Z DESCRIPTION:TICKET NUMBER: 7608\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Friday, May 16, 2008, 10:07 AM (1007)\nEND TIME: Saturday, May 17, 2008, 12:54 AM (0054)\nDESCRIPTION:NLR Layer 3 Peer SURFnet is now available to the community. Engineers were contacted and report the outage was due to scheduled circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7608&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080514T040001Z SUMMARY: 7580 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20080514T060001Z DESCRIPTION:TICKET NUMBER: 7580\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, May 14, 2008, 4:40 AM (0440)\nEND TIME: Wednesday, May 14, 2008, 5:51 AM (0551)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Atlanta, GA but were forced to revert back to the old card. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7580&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080509T130001Z SUMMARY: 7582 NLR Layer 3 Peer CA*Net (SEAT) Maintenance Completed DTEND:20080509T140001Z DESCRIPTION:TICKET NUMBER: 7582\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CA*Net4 via PacWave*\n\nSCHEDULED START TIME: Friday, May 9, 2008, 1:00 PM (1300)\nSCHEDULED END TIME: Friday, May 9, 2008, 2:00 PM (1400)\nDESCRIPTION:Peer CA*Net4 performed emergency maintenance to replace a faulty FPC in their Calgary router. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7582&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080528T050001Z SUMMARY: 7583 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080528T110001Z DESCRIPTION:TICKET NUMBER: 7583\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Wednesday, May 28, 2008, 5:21 AM (0521)\nEND TIME: Wednesday, May 28, 2008, 5:22 AM (0522)\nDESCRIPTION:NLR fiber provider Level(3) Communications performed maintenance during the above time frame. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7583&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080609T050001Z SUMMARY: 7659 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Postponed DTEND:20080609T070001Z DESCRIPTION:TICKET NUMBER: 7659\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSCHEDULED START TIME: Monday, June 9, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Monday, June 9, 2008, 7:00 AM (0700)\nDESCRIPTION:***Please note this maintenance has been postponed and will be rescheduled at another time.*** NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Chicago, IL. A brief outage is expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7659&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080509T180001Z SUMMARY: 7586 NLR Maintenance in Atlanta, GA Completed DTEND:20080509T190001Z DESCRIPTION:TICKET NUMBER: 7586\nMAINTENANCE TYPE: Hardware\nAFFECTED: \nSCHEDULED START TIME: Friday, May 9, 2008, 6:00 PM (1800)\nSCHEDULED END TIME: Friday, May 9, 2008, 7:00 PM (1900)\nDESCRIPTION:NLR Layer 2/3 Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Atlanta, GA. No outages were incurred during this maintenance. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7586&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080520T050001Z SUMMARY: 7575 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080520T110001Z DESCRIPTION:TICKET NUMBER: 7575\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Tuesday, May 20, 2008, 7:49 AM (0749)\nEND TIME: Tuesday, May 20, 2008, 8:28 AM (0828)\nDESCRIPTION:NLR's Fiber Provider conducted fiber splicing near Pearlington, MS. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7575&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080529T050001Z SUMMARY: 7591 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20080529T110001Z DESCRIPTION:TICKET NUMBER: 7591\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Thursday, May 29, 2008, 6:40 AM (0640)\nEND TIME: Thursday, May 29, 2008, 6:50 AM (0650)\nDESCRIPTION:NLR's Fiber Provider conducted fiber relocation in Comstock, TX. Brief outages were detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7591&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080514T113001Z SUMMARY: 7593 NLR Layer 3 Member UIUC (via CIC) Emergency Maintenance Complete DTEND:20080514T120001Z DESCRIPTION:TICKET NUMBER: 7593\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member UIUC\n\nSCHEDULED START TIME: Wednesday, May 14, 2008, 11:30 AM (1130)\nSCHEDULED END TIME: Wednesday, May 14, 2008, 12:00 PM (1200)\nDESCRIPTION:NLR Layer 3 Member UIUC will be performing maintenance to their peering with NLR. Flaps may be detected during this time frame. No outages were observed during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7593&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080521T070001Z SUMMARY: 7604 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080521T130001Z DESCRIPTION:TICKET NUMBER: 7604\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, May 21, 2008, 7:11 AM (0711)\nEND TIME: Wednesday, May 21, 2008, 12:17 PM (1217)\nDESCRIPTION:NLR Member CENIC performed fiber relocation along LOSA-SEAT Layer 3 Backbone Circuit. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7604&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080602T050001Z SUMMARY: 7605 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080602T090001Z DESCRIPTION:TICKET NUMBER: 7605\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, June 2, 2008, 6:52 AM (0652)\nEND TIME: Monday, June 2, 2008, 6:53 AM (0653)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Chicago, IL. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7605&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080519T080001Z SUMMARY: 7606 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20080519T100001Z DESCRIPTION:TICKET NUMBER: 7606\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, May 19, 2008, 8:16 AM (0816)\nEND TIME: Monday, May 19, 2008, 8:23 AM (0823)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Atlanta, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7606&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080529T070001Z SUMMARY: 7623 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080529T130001Z DESCRIPTION:TICKET NUMBER: 7623\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, May 29, 2008, 7:11 AM (0711)\nEND TIME: Thursday, May 29, 2008, 12:10 PM (1210)\nDESCRIPTION:NLR Member CENIC performed fiber relocation along Layer 3 Backbone Circuit LOSA-SEAT. Brief outages occured during this maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7623&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080520T040001Z SUMMARY: 7613 NLR Layer 3 Backbone Circuit ATLA-WASH Emergency Maintenance Completed DTEND:20080520T060001Z DESCRIPTION:TICKET NUMBER: 7613\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Tuesday, May 20, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, May 20, 2008, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in King George, VA but were forced to back out of the replacement card. Maintenance will be rescheduled to complete the change. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7613&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080521T000001Z SUMMARY: 7615 NLR Layer 3 Member LEARN Emergency Maintenance Completed DTEND:20080521T045901Z DESCRIPTION:TICKET NUMBER: 7615\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member LEARN and its participants\n\nSCHEDULED START TIME: Wednesday, May 21, 2008, 12:00 AM (0000)\nSCHEDULED END TIME: Wednesday, May 21, 2008, 4:59 AM (0459)\nDESCRIPTION:Member LEARN performed hardware emergency maintenance in San Antonio. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7615&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080523T033001Z SUMMARY: 7621 NLR Layer 3 Core Node ATLA Emergency Maintenance Completed DTEND:20080523T043001Z DESCRIPTION:TICKET NUMBER: 7621\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node ATLA\natla.layer3.nlr.net;\nSTART TIME: Friday, May 23, 2008, 3:55 AM (0355)\nEND TIME: Friday, May 23, 2008, 4:09 AM (0409)\nDESCRIPTION:NLR Core Node ATLA was briefly unavailable to the Community during this emergency maintenance. A software patch was applied to the core node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7621&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080528T050001Z SUMMARY: 7639 NLR Layer 3 Member LEARN Emergency Maintenance Completed ***Tracking*** DTEND:20080528T090001Z DESCRIPTION:TICKET NUMBER: 7639\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member LEARN\n\nSCHEDULED START TIME: Wednesday, May 28, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, May 28, 2008, 9:00 AM (0900)\nDESCRIPTION:Member LEARN performed an emergency maintenance to investigate problems with their Optical Service Channel. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7639&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080523T020001Z SUMMARY: 7624 NLR Layer 3 Peer CA*Net4 (SEAT) Emergency Maintenance Completed DTEND:20080523T040001Z DESCRIPTION:TICKET NUMBER: 7624\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer CAnet*4 (SEAT)\n\nSCHEDULED START TIME: Friday, May 23, 2008, 2:00 AM (0200)\nSCHEDULED END TIME: Friday, May 23, 2008, 4:00 AM (0400)\nDESCRIPTION:Peer CA*Net4 performed maintenance on the active X-Connect card in their Nortel OME 6500. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7624&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080606T040001Z SUMMARY: 7626 NLR Layer 3 Backbone Circuit NEWY-WASH Maintenance Completed DTEND:20080606T100001Z DESCRIPTION:TICKET NUMBER: 7626\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-NEWY-WASH-10GE-98\n\nSCHEDULED START TIME: Friday, June 6, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Friday, June 6, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 3 Backbone Circuit NEWY-WASH underwent maintenance while Level(3) Communications repaired damaged fiber in Baltimore, MD. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7626&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080527T040001Z SUMMARY: 7625 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080527T060001Z DESCRIPTION:TICKET NUMBER: 7625\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Tuesday, May 27, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Tuesday, May 27, 2008, 6:00 AM (0600)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in King George, VA, however had to revert back to the original card due to complications. This maintenance will be rescheduled and completed on another date. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7625&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080608T105001Z SUMMARY: 7668 NLR Layer 3 Peers AMPATH & CLARA Emergency Maintenance Completed DTEND:20080608T113001Z DESCRIPTION:TICKET NUMBER: 7668\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peers AMPATH & CLARA\n\nSTART TIME: Sunday, June 8, 2008, 10:33 AM (1033)\nEND TIME: Sunday, June 8, 2008, 10:52 AM (1052)\nDESCRIPTION:NLR Layer 3 Peers AMPATH & CLARA were unavailable due to scheduled maintenance. The maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7668&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080604T110001Z SUMMARY: 7634 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080604T130001Z DESCRIPTION:TICKET NUMBER: 7634\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, June 4, 2008, 11:00 AM (1100)\nSCHEDULED END TIME: Wednesday, June 4, 2008, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Palo Cedro, CA. No outages were incurred during this maintenance. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7634&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080601T093001Z SUMMARY: 7649 NLR Layer 3 Peers AMPATH & CLARA Maintenance Completed DTEND:20080601T130001Z DESCRIPTION:TICKET NUMBER: 7649\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peers AMPATH & CLARA\n\nSTART TIME: Sunday, June 1, 2008, 10:35 AM (1035)\nEND TIME: Sunday, June 1, 2008, 10:55 AM (1055)\nDESCRIPTION:NLR Layer 3 Peers AMPATH & CLARA were unavailable due to scheduled maintenance. The maintenance has been completed successfully.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7649&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080609T090001Z SUMMARY: 7653 NLR Layer 3 Backbone Circuits Spanning KANS-DALL Maintenance Completed DTEND:20080609T110001Z DESCRIPTION:TICKET NUMBER: 7653\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-HOUS-10GE-67\nNLR-DENV-HOUS-10GE-82\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Monday, June 9, 2008, 9:33 AM (0933)\nEND TIME: Monday, June 9, 2008, 9:39 AM (0939)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Tulsa, OK. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7653&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080531T050001Z SUMMARY: 7648 NLR Member CIC OmniPoP's Participant Indiana GigaPOP Emergency Maintenance Completed DTEND:20080601T000001Z DESCRIPTION:TICKET NUMBER: 7648\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer Indiana GigaPOP via CIC\n\nSTART TIME: Saturday, May 31, 2008, 7:24 PM (1924)\nEND TIME: Saturday, May 31, 2008, 7:36 PM (1936)\nDESCRIPTION:Indiana GigaPOP's connection to the CIC-OMNIPOP underwent emergency maintenance. Indiana GigaPOP's engineers identified a faulty card in Crown Point, IN and worked to replace it and restore service. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7648&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080528T040001Z SUMMARY: 7641 NLR Layer 3 Backbone Circuit ATLA-WASH Emergency Maintenance Completed DTEND:20080528T050001Z DESCRIPTION:TICKET NUMBER: 7641\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSCHEDULED START TIME: Wednesday, May 28, 2008, 4:00 AM (0400)\nSCHEDULED END TIME: Wednesday, May 28, 2008, 5:00 AM (0500)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in King George, VA. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7641&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080618T110001Z SUMMARY: 7684 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080618T130001Z DESCRIPTION:TICKET NUMBER: 7684\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, June 18, 2008, 11:13 AM (1113)\nEND TIME: Wednesday, June 18, 2008, 11:15 AM (1115)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Seattle, WA. A brief outage wasincurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7684&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080619T050001Z SUMMARY: 7657 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20080619T110001Z DESCRIPTION:TICKET NUMBER: 7657\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Thursday, June 19, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Thursday, June 19, 2008, 11:00 AM (1100)\nDESCRIPTION:NLR Layer 3 Backbone Circuits Spanning CHIC-KANS underwent maintenance as service provider Level(3) Communications performed fiber maintenance in Broadview, IL. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7657&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080610T235901Z SUMMARY: 7656 NLR Layer 3 Member MAX Maintenance Completed DTEND:20080611T010001Z DESCRIPTION:TICKET NUMBER: 7656\nMAINTENANCE TYPE: Circuit\nAFFECTED: Member MAX\n\nSCHEDULED START TIME: Tuesday, June 10, 2008, 11:59 PM (2359)\nSCHEDULED END TIME: Wednesday, June 11, 2008, 1:00 AM (0100)\nDESCRIPTION:Member MAX migrated their circuit to a direct connection to the the NLR CRS in Washington, D.C. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7656&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080620T050001Z SUMMARY: 7673 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20080620T110001Z DESCRIPTION:TICKET NUMBER: 7673\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Friday, June 20, 2008, 8:17 AM (0817)\nEND TIME: Friday, June 20, 2008, 8:47 AM (0847)\nDESCRIPTION:NLR Route CHIC-KANS was unavailable as service provider Level(3) Communications performed fiber relocation in Broadview, IL. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7673&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080708T070001Z SUMMARY: 7725 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080708T090001Z DESCRIPTION:TICKET NUMBER: 7725\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, July 8, 2008, 8:04 AM (0804)\nEND TIME: Tuesday, July 8, 2008, 8:15 AM (0815)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Boise, ID. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7725&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080626T100001Z SUMMARY: 7707 NLR Layer 3 Core Node ATLA Maintenance Completed DTEND:20080626T110001Z DESCRIPTION:TICKET NUMBER: 7707\nMAINTENANCE TYPE: Software\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\nNLR-ATLA-HOUS-10GE-70\nCore Node: ATLA and its Peers\natla.layer3.nlr.net;\nSTART TIME: Thursday, June 26, 2008, 10:26 AM (1026)\nEND TIME: Thursday, June 26, 2008, 10:42 AM (1042)\nDESCRIPTION:NLR Layer 3 Engineering performed software maintenance on the ATLA Core Node during the above time frame. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7707&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080610T080001Z SUMMARY: 7660 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080610T100001Z DESCRIPTION:TICKET NUMBER: 7660\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, June 10, 2008, 8:14 AM (0814)\nEND TIME: Tuesday, June 10, 2008, 8:16 AM (0816)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Howell, UT. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7660&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080612T020001Z SUMMARY: 7681 NLR Layer 3 Peers AMPATH & CLARA Maintenance Completed DTEND:20080612T090001Z DESCRIPTION:TICKET NUMBER: 7681\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peers AMPATH & CLARA\n\nSTART TIME: Thursday, June 12, 2008, 3:57 AM (0357)\nEND TIME: Thursday, June 12, 2008, 4:05 AM (0405)\nDESCRIPTION:NLR Layer 3 Peers AMPATH & CLARA were briefly unavailable to the community due to circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7681&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080611T040001Z SUMMARY: 7661 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20080611T060001Z DESCRIPTION:TICKET NUMBER: 7661\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, June 11, 2008, 3:58 AM (0358)\nEND TIME: Wednesday, June 11, 2008, 3:59 AM (0359)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Greensboro, NC. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7661&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080610T070001Z SUMMARY: 7662 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080610T130001Z DESCRIPTION:TICKET NUMBER: 7662\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, June 10, 2008, 7:28 AM (0728)\nEND TIME: Tuesday, June 10, 2008, 7:47 AM (0747)\nDESCRIPTION:NLR Member CENIC performed fiber relocation along the Layer 3 Backbone Circuit LOSA-SEAT.Outages were incurred during the maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7662&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080612T170001Z SUMMARY: 7675 NLR Layer 3 Peer AARNET Emergeny Maintenance ***Tracking*** DTEND:20080612T190001Z DESCRIPTION:TICKET NUMBER: 7675\nMAINTENANCE TYPE: Circuit\nAFFECTED: AARNET\n\nSCHEDULED START TIME: Thursday, June 12, 2008, 5:00 PM (1700)\nSCHEDULED END TIME: Thursday, June 12, 2008, 7:00 PM (1900)\nDESCRIPTION:NLR Peer AARNET may be briefly unavailable.\nTIMESTAMP: Sat Nov 7 11:03:18 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7675&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080616T090001Z SUMMARY: 7685 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20080616T110001Z DESCRIPTION:TICKET NUMBER: 7685\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Monday, June 16, 2008, 8:15 AM (0815)\nEND TIME: Monday, June 16, 2008, 8:20 AM (0820)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Auburn, NE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7685&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080623T070001Z SUMMARY: 7694 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080623T100001Z DESCRIPTION:TICKET NUMBER: 7694\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, June 23, 2008, 7:15 AM (0715)\nEND TIME: Monday, June 23, 2008, 8:23 AM (0823)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, performed maintenance along this route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7694&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080617T003001Z SUMMARY: 7687 NLR Layer 3 Peer NREN Maintenance Completed DTEND:20080617T023001Z DESCRIPTION:TICKET NUMBER: 7687\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer NREN\n\nSCHEDULED START TIME: Tuesday, June 17, 2008, 12:30 AM (0030)\nSCHEDULED END TIME: Tuesday, June 17, 2008, 2:30 AM (0230)\nDESCRIPTION:NLR Layer 3 Peer NREN migrated their Pacific Wave connection to a new cross-connect. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7687&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080622T120001Z SUMMARY: 7713 NLR Layer 3 Peer SURFnet Instability (Resolved) DTEND:20080622T180001Z DESCRIPTION:TICKET NUMBER: 7713\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Sunday, June 22, 2008, 2:20 PM (1420)\nEND TIME: Sunday, June 22, 2008, 2:36 PM (1436)\nDESCRIPTION:Peer SURFnet was unstable to the community. SURFnet Engineers report that this was due to a maintenance on their carrier circuit. Maintenance has been completed and the peering has stabilized.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7713&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080619T210001Z SUMMARY: 7695 NLR Maintenance on the Maps for Atlas Framenet and Packetnet *Tracking* DTEND:20080619T220001Z DESCRIPTION:TICKET NUMBER: 7695\nMAINTENANCE TYPE: Software\nAFFECTED: \nSCHEDULED START TIME: Thursday, June 19, 2008, 9:00 PM (2100)\nSCHEDULED END TIME: Thursday, June 19, 2008, 10:00 PM (2200)\nDESCRIPTION:Work completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7695&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080624T233001Z SUMMARY: 7709 NLR Website Maintenance Completed DTEND:20080624T013001Z DESCRIPTION:TICKET NUMBER: 7709\nMAINTENANCE TYPE: Software\nAFFECTED: Website www.nlr.net\n\nSCHEDULED START TIME: Tuesday, June 24, 2008, 11:30 PM (2330)\nSCHEDULED END TIME: Tuesday, June 24, 2008, 1:30 AM (0130)\nDESCRIPTION:The website www.nlr.net, was moved to new hardware and required a DNS update. No outage were incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7709&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080627T070101Z SUMMARY: 7689 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Cancelled DTEND:20080627T130001Z DESCRIPTION:TICKET NUMBER: 7689\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Friday, June 27, 2008, 7:01 AM (0701)\nSCHEDULED END TIME: Friday, June 27, 2008, 1:00 PM (1300)\nDESCRIPTION:***Please note this maintenance has been cancelled*** NLR fiber provider Level(3) Communications will be performing circuit maintenance in Fremont, CA during the above time frame. An outage of up to 1 hour is expected; however, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7689&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080715T040001Z SUMMARY: 7740 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080715T060001Z DESCRIPTION:TICKET NUMBER: 7740\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Tuesday, July 15, 2008, 4:05 AM (0405)\nEND TIME: Tuesday, July 15, 2008, 4:09 AM (0409)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Folkston, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7740&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080716T040001Z SUMMARY: 7730 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20080716T060001Z DESCRIPTION:TICKET NUMBER: 7730\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-KANS-CHIC-10GE-51\nNLR-CHIC-HOUS-10GE-67\n\nSTART TIME: Wednesday, July 16, 2008, 4:56 AM (0456)\nEND TIME: Wednesday, July 16, 2008, 5:17 AM (0517)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Odell, IL. Replacement card failed. A new card will be shipped out at a later date. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7730&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080611T080001Z SUMMARY: 7664 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20080611T100001Z DESCRIPTION:TICKET NUMBER: 7664\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSTART TIME: Wednesday, June 11, 2008, 8:17 AM (0817)\nEND TIME: Wednesday, June 11, 2008, 8:19 AM (0819)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Auburn, NE. The card replacement was unsuccessful and will be attempted again at another date. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7664&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080614T130001Z SUMMARY: 7665 NLR Layer 3 Peer TransPAC2 (LOSA) Maintenance Completed DTEND:20080614T150001Z DESCRIPTION:TICKET NUMBER: 7665\nMAINTENANCE TYPE: Software\nAFFECTED: Peer TransPAC2 (LOSA)\n\nSCHEDULED START TIME: Saturday, June 14, 2008, 1:00 PM (1300)\nSCHEDULED END TIME: Saturday, June 14, 2008, 3:00 PM (1500)\nDESCRIPTION:Transpac2 Core Node will recieved a code upgrade in Los Angeles, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7665&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080618T070001Z SUMMARY: 7682 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Canceled DTEND:20080618T090001Z DESCRIPTION:TICKET NUMBER: 7682\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSCHEDULED START TIME: Wednesday, June 18, 2008, 7:00 AM (0700)\nSCHEDULED END TIME: Wednesday, June 18, 2008, 9:00 AM (0900)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Dexter, MI. A brief outage is expected. However, the entire maintenance window has been reserved. ***Please note that this maintenance has been canceled***\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7682&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080616T050001Z SUMMARY: 7677 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Canceled DTEND:20080616T070001Z DESCRIPTION:TICKET NUMBER: 7677\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSCHEDULED START TIME: Monday, June 16, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Monday, June 16, 2008, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Joliet, IL. A brief outage is expected. However, the entire maintenance window has been reserved. ***Maintenance has been canceled***\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7677&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080614T093001Z SUMMARY: 7690 NLR Layer 3 Peers AMPATH & CLARA Maintenance Completed DTEND:20080614T130001Z DESCRIPTION:TICKET NUMBER: 7690\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peers AMPATH & CLARA\n\nSTART TIME: Saturday, June 14, 2008, 10:17 AM (1017)\nEND TIME: Saturday, June 14, 2008, 10:49 AM (1049)\nDESCRIPTION:NLR Layer 3 Peers AMPATH & CLARA was briefly unavailable while FLR performed circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7690&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080624T070001Z SUMMARY: 7693 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080624T100001Z DESCRIPTION:TICKET NUMBER: 7693\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, June 24, 2008, 8:08 AM (0808)\nEND TIME: Tuesday, June 24, 2008, 9:14 AM (0914)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, performed maintenance along this route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7693&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080625T040001Z SUMMARY: 7697 NLR Layer 3 Backbone Circuit CHIC-WASH Maintenance Completed DTEND:20080625T080001Z DESCRIPTION:TICKET NUMBER: 7697\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\n\nSTART TIME: Wednesday, June 25, 2008, 4:08 AM (0408)\nEND TIME: Wednesday, June 25, 2008, 4:32 AM (0432)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Comnunications Technician, replaced a card in Pittsburgh, PA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7697&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080717T113001Z SUMMARY: 7773 NLR Layer 3 Core Node SEAT Maintenance Completed DTEND:20080717T123001Z DESCRIPTION:TICKET NUMBER: 7773\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node SEAT and its Members\nand Peers\nseat.layer3.nlr.net;\nSTART TIME: Thursday, July 17, 2008, 11:48 AM (1148)\nEND TIME: Thursday, July 17, 2008, 12:04 PM (1204)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the SEAT Core Node. A few brief outages occured. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7773&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080625T090001Z SUMMARY: 7698 NLR Layer 3 Backbone Circuit HOUS-LOSA Maintenance Completed DTEND:20080625T110001Z DESCRIPTION:TICKET NUMBER: 7698\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-HOUS-LOSA-10GE-87\n\nSTART TIME: Wednesday, June 25, 2008, 9:02 AM (0902)\nEND TIME: Wednesday, June 25, 2008, 9:06 AM (0906)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in San Antonio, TX. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7698&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080721T040001Z SUMMARY: 7722 NLR Layer 3 Backbone Circuits Spanning PITT-WASH Maintenance Completed DTEND:20080721T080001Z DESCRIPTION:TICKET NUMBER: 7722\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Monday, July 21, 2008, 4:11 AM (0411)\nEND TIME: Monday, July 21, 2008, 4:39 AM (0439)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced failing cards in Cumberland, MD. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7722&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080618T210001Z SUMMARY: 7699 NLR Layer 3 Backbone Circuit CHIC-ATLA Emergency Maintenance Completed DTEND:20080619T120001Z DESCRIPTION:TICKET NUMBER: 7699\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-STAR-10GE-169\n\nSTART TIME: Thursday, June 19, 2008, 11:41 AM (1141)\nEND TIME: Thursday, June 19, 2008, 12:12 PM (1212)\nDESCRIPTION:NLR Layer 3 Backbone Circuit CHIC-ATLA was unavailable during the above time frame while provider Qwest Communications performed circuit maintenance. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7699&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080630T080001Z SUMMARY: 7704 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080630T100001Z DESCRIPTION:TICKET NUMBER: 7704\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Monday, June 30, 2008, 8:00 AM (0800)\nSCHEDULED END TIME: Monday, June 30, 2008, 10:00 AM (1000)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Rawlins, WY. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7704&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080701T040001Z SUMMARY: 7706 NLR Layer 3 Backbone Circuits Spanning PITT-WASH Maintenance Completed DTEND:20080701T100001Z DESCRIPTION:TICKET NUMBER: 7706\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-PITT-WASH-10GE-66\n\nSTART TIME: Tuesday, July 1, 2008, 8:20 AM (0820)\nEND TIME: Tuesday, July 1, 2008, 9:14 AM (0914)\nDESCRIPTION:NLR's Fiber Provider spliced fiber near Pittsburgh, PA. Maintenance has been completed\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7706&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080626T140001Z SUMMARY: 7728 NLR Layer 3 Peer CA*Net (NEWY) Emergency Maintenance Completed DTEND:20080626T220001Z DESCRIPTION:TICKET NUMBER: 7728\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net-Montreal\n\nSCHEDULED START TIME: Thursday, June 26, 2008, 2:00 PM (1400)\nSCHEDULED END TIME: Thursday, June 26, 2008, 10:00 PM (2200)\nDESCRIPTION:NLR Layer 3 Peer CA*Net-Montreal's engineers performed circuit maintenance. No outage was incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7728&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080710T103001Z SUMMARY: 7767 NLR Layer 3 Core Node DENV Maintenance Completed DTEND:20080710T110001Z DESCRIPTION:TICKET NUMBER: 7767\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node DENV and its Members\nand Peers\ndenv.layer3.nlr.net;\nSTART TIME: Thursday, July 10, 2008, 11:02 AM (1102)\nEND TIME: Thursday, July 10, 2008, 12:09 PM (1209)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Denver Core Node. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7767&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080629T030001Z SUMMARY: 7714 NLR Layer 3 Peer SURFnet Maintenance Completed DTEND:20080629T100001Z DESCRIPTION:TICKET NUMBER: 7714\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer SURFnet\n\nSTART TIME: Sunday, June 29, 2008, 8:56 AM (0856)\nEND TIME: Sunday, June 29, 2008, 10:37 AM (1037)\nDESCRIPTION:Peer SURFnet was unavailable to the community while their carrier performed fiber maintenance. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7714&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080702T070001Z SUMMARY: 7717 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080702T090001Z DESCRIPTION:TICKET NUMBER: 7717\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 2, 2008, 7:03 AM (0703)\nEND TIME: Wednesday, July 2, 2008, 7:43 AM (0743)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communication technician, replaced a failing card in Colusa, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7717&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080710T070001Z SUMMARY: 7719 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080710T130001Z DESCRIPTION:TICKET NUMBER: 7719\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Thursday, July 10, 2008, 7:08 AM (0708)\nEND TIME: Thursday, July 10, 2008, 8:21 AM (0821)\nDESCRIPTION:NLR's Fiber Provider conducted fiber maintenance near Fremont, CA. Some outages were incurred. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7719&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080630T040001Z SUMMARY: 7711 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080630T060001Z DESCRIPTION:TICKET NUMBER: 7711\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, June 30, 2008, 4:01 AM (0401)\nEND TIME: Monday, June 30, 2008, 4:03 AM (0403)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Dexter, MI. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7711&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080708T110001Z SUMMARY: 7723 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080708T130001Z DESCRIPTION:TICKET NUMBER: 7723\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, July 8, 2008, 10:59 AM (1059)\nEND TIME: Tuesday, July 8, 2008, 11:13 AM (1113)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted replacement of a failing card in Suisun City, CA. The replacement failed due to a DOA card. A brief outage was incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7723&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080707T110001Z SUMMARY: 7724 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080707T130001Z DESCRIPTION:TICKET NUMBER: 7724\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Monday, July 7, 2008, 11:00 AM (1100)\nSCHEDULED END TIME: Monday, July 7, 2008, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Palo Cedro, CA. No outages were incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7724&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080717T103001Z SUMMARY: 7772 NLR Layer 3 Core Node HOUS Maintenance Completed DTEND:20080717T233001Z DESCRIPTION:TICKET NUMBER: 7772\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node HOUS and its Members\nand Peers\nhous.layer3.nlr.net;\nSTART TIME: Thursday, July 17, 2008, 10:41 AM (1041)\nEND TIME: Thursday, July 17, 2008, 10:57 AM (1057)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the HOUS Core Node. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7772&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080702T090001Z SUMMARY: 7720 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080702T110001Z DESCRIPTION:TICKET NUMBER: 7720\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 2, 2008, 9:15 AM (0915)\nEND TIME: Wednesday, July 2, 2008, 9:23 AM (0923)\nDESCRIPTION:NLR Member CENIC performed a card replacement along the SUNN-LOSA Route. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7720&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080625T023001Z SUMMARY: 7721 NLR Peer NREN (SEAT) Emergency Maintenance Completed DTEND:20080625T030001Z DESCRIPTION:TICKET NUMBER: 7721\nMAINTENANCE TYPE: Hardware\nAFFECTED: Peer NREN\n\nSCHEDULED START TIME: Wednesday, June 25, 2008, 2:30 AM (0230)\nSCHEDULED END TIME: Wednesday, June 25, 2008, 3:00 AM (0300)\nDESCRIPTION:Peer NREN swapped Zenpaks on it's PacificWave interface. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7721&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080721T110001Z SUMMARY: 7731 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080721T130001Z DESCRIPTION:TICKET NUMBER: 7731\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, July 21, 2008, 11:18 AM (1118)\nEND TIME: Monday, July 21, 2008, 11:20 AM (1120)\nDESCRIPTION:LR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Portland, OR. A new RMA will be opened and a new window scheduled. A brief outage was incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7731&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080710T050001Z SUMMARY: 7732 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080710T110001Z DESCRIPTION:TICKET NUMBER: 7732\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Thursday, July 10, 2008, 8:23 AM (0823)\nEND TIME: Thursday, July 10, 2008, 8:42 AM (0842)\nDESCRIPTION:NLR's Fiber Provider Level(3) Communications performed fiber relocation near Gary, IN. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7732&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080722T070001Z SUMMARY: 7736 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Cancelled DTEND:20080722T090001Z DESCRIPTION:TICKET NUMBER: 7736\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSCHEDULED START TIME: Tuesday, July 22, 2008, 7:00 AM (0700)\nSCHEDULED END TIME: Tuesday, July 22, 2008, 9:00 AM (0900)\nDESCRIPTION:*Please note this maintenance has been cancelled* NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, will be replacing a failing card in Gooding, ID. A brief outage is expected. However, the entire maintenance window has been reserved.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7736&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080701T103001Z SUMMARY: 7739 NLR Layer 3 Peer MREN Maintenance Completed DTEND:20080701T113001Z DESCRIPTION:TICKET NUMBER: 7739\nMAINTENANCE TYPE: Software\nAFFECTED: Member MREN\n\nSCHEDULED START TIME: Tuesday, July 1, 2008, 10:30 AM (1030)\nSCHEDULED END TIME: Tuesday, July 1, 2008, 11:30 AM (1130)\nDESCRIPTION:Member MREN upgraded to a new version of FTOS. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7739&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080709T040001Z SUMMARY: 7752 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080709T060001Z DESCRIPTION:TICKET NUMBER: 7752\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Wednesday, July 9, 2008, 4:00 AM (0400)\nEND TIME: Wednesday, July 9, 2008, 4:03 AM (0403)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Monticello, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7752&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080716T110001Z SUMMARY: 7757 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080716T130001Z DESCRIPTION:TICKET NUMBER: 7757\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, July 16, 2008, 11:09 AM (1109)\nEND TIME: Wednesday, July 16, 2008, 11:10 AM (1110)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Rupert, ID. Brief outages were incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7757&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080709T090001Z SUMMARY: 7751 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080709T110001Z DESCRIPTION:TICKET NUMBER: 7751\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 9, 2008, 9:00 AM (0900)\nEND TIME: Wednesday, July 9, 2008, 9:08 AM (0908)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Eugene, OR. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:19 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7751&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080705T100001Z SUMMARY: 7750 NLR Layer 3 Core Node CHIC Maintenance Completed DTEND:20080705T110001Z DESCRIPTION:TICKET NUMBER: 7750\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node CHIC and its Members\nand Peers\nchic.layer3.nlr.net;\nSTART TIME: Saturday, July 5, 2008, 10:13 AM (1013)\nEND TIME: Saturday, July 5, 2008, 10:28 AM (1028)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Chicago Core Node. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7750&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080723T110001Z SUMMARY: 7758 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080723T130001Z DESCRIPTION:TICKET NUMBER: 7758\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, July 23, 2008, 11:26 AM (1126)\nEND TIME: Wednesday, July 23, 2008, 11:29 AM (1129)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Oakridge, OR. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7758&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080701T050001Z SUMMARY: 7748 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Emergency Maintenance Completed DTEND:20080701T090001Z DESCRIPTION:TICKET NUMBER: 7748\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-TULS-CHIC-10GE-97\nNLR-CHIC-HOUS-10GE-67\n\nSTART TIME: Tuesday, July 1, 2008, 5:22 AM (0522)\nEND TIME: Tuesday, July 1, 2008, 5:29 AM (0529)\nDESCRIPTION:Layer 3 Backbone Circuits Spanning CHIC-KANS underwent maintenance as NLR Layer 1 NOC Engineers, with the assistance from Level(3) Communications replaced a faulty card in Syracuse, MO. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7748&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080730T040001Z SUMMARY: 7798 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080730T060001Z DESCRIPTION:TICKET NUMBER: 7798\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Wednesday, July 30, 2008, 4:31 AM (0431)\nEND TIME: Wednesday, July 30, 2008, 6:02 AM (0602)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a card in King George, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7798&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080707T150001Z SUMMARY: 7755 NLR Layer 3 Peer KISTI Maintenance Completed DTEND:20080712T000001Z DESCRIPTION:TICKET NUMBER: 7755\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer KISTI\n\nSCHEDULED START TIME: Monday, July 7, 2008, 3:00 PM (1500)\nSCHEDULED END TIME: Saturday, July 12, 2008, 12:00 AM (0000)\nDESCRIPTION:NLR Layer 3 Peer KISTI's fiber provider performed circuit maintenance during the above time frame. No outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7755&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080714T040001Z SUMMARY: 7756 NLR Layer 3 Backbone Circuits Spanning RALE-ATLA Maintenance Completed DTEND:20080714T060001Z DESCRIPTION:TICKET NUMBER: 7756\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-RALE-10GE-63\nNLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, July 14, 2008, 4:09 AM (0409)\nEND TIME: Monday, July 14, 2008, 4:10 AM (0410)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Salisbury, NC. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7756&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080710T100001Z SUMMARY: 7766 NLR Layer 3 Core Node WASH Maintenance Completed DTEND:20080710T103001Z DESCRIPTION:TICKET NUMBER: 7766\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node WASH and its Members\nand Peers\nwash.layer3.nlr.net;\nSTART TIME: Thursday, July 10, 2008, 10:20 AM (1020)\nEND TIME: Thursday, July 10, 2008, 10:25 AM (1025)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Washington Core Node. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7766&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080707T120001Z SUMMARY: 7765 NLR Member UCAR Maintenance Completed DTEND:20080707T123001Z DESCRIPTION:TICKET NUMBER: 7765\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member UCAR (DENV)\n\nSTART TIME: Monday, July 7, 2008, 1:07 PM (1307)\nEND TIME: Monday, July 7, 2008, 1:08 PM (1308)\nDESCRIPTION:NLR Member UCAR (DENV) completed an upgrade on their connection to NLR. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7765&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080715T100001Z SUMMARY: 7768 NLR Layer 3 Core Node NEWY Maintenance Completed DTEND:20080715T110001Z DESCRIPTION:TICKET NUMBER: 7768\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node NEWY and its Members\nand Peers\nnewy.layer3.nlr.net;\nSTART TIME: Tuesday, July 15, 2008, 9:57 AM (0957)\nEND TIME: Tuesday, July 15, 2008, 10:59 AM (1059)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the NEWY Core Node. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7768&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080715T103001Z SUMMARY: 7771 NLR Layer 3 Core Node LOSA Maintenance Completed DTEND:20080715T113001Z DESCRIPTION:TICKET NUMBER: 7771\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node LOSA and its Members\nand Peers\nlosa.layer3.nlr.net;\nSTART TIME: Tuesday, July 15, 2008, 11:21 AM (1121)\nEND TIME: Tuesday, July 15, 2008, 11:40 AM (1140)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the LOSA Core Node. Brief outages were incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7771&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080709T120001Z SUMMARY: 7747 NLR Member FRGP Maintenance Completed DTEND:20080709T123001Z DESCRIPTION:TICKET NUMBER: 7747\nMAINTENANCE TYPE: Hardware\nAFFECTED: Member FRGP\n\nSCHEDULED START TIME: Wednesday, July 9, 2008, 12:00 PM (1200)\nSCHEDULED END TIME: Wednesday, July 9, 2008, 12:30 PM (1230)\nDESCRIPTION:Member Front Front Range Gigapop Engineers activated internal routing on two new routers. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7747&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080723T050001Z SUMMARY: 7775 NLR Layer 3 Backbone Circuits Spanning KANS-DENV Maintenance Completed DTEND:20080723T070001Z DESCRIPTION:TICKET NUMBER: 7775\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-DENV-HOUS-10GE-82\n\nSCHEDULED START TIME: Wednesday, July 23, 2008, 5:00 AM (0500)\nSCHEDULED END TIME: Wednesday, July 23, 2008, 7:00 AM (0700)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Grafton, NE. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7775&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080717T100001Z SUMMARY: 7792 NLR Layer 3 Core Node WASH Maintenance Completed DTEND:20080717T110001Z DESCRIPTION:TICKET NUMBER: 7792\nMAINTENANCE TYPE: Software\nAFFECTED: Core Node WASH and its Members\nand Peers\nwash.layer3.nlr.net;\nSTART TIME: Thursday, July 17, 2008, 10:09 AM (1009)\nEND TIME: Thursday, July 17, 2008, 10:25 AM (1025)\nDESCRIPTION:NLR Layer 3 Engineers performed software maintenance on the Washington Core Node. A brief outage was detected. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7792&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080725T040001Z SUMMARY: 7783 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080725T100001Z DESCRIPTION:TICKET NUMBER: 7783\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Friday, July 25, 2008, 6:02 AM (0602)\nEND TIME: Friday, July 25, 2008, 6:27 AM (0627)\nDESCRIPTION:NLR's Fiber Provider Level(3) Communications performed fiber restoration near Jacksonville, FL. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7783&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080729T040001Z SUMMARY: 7781 NLR Layer 3 Backbone Circuit ATLA-HOUS Maintenance Completed DTEND:20080729T060001Z DESCRIPTION:TICKET NUMBER: 7781\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-HOUS-10GE-70\n\nSTART TIME: Tuesday, July 29, 2008, 4:02 AM (0402)\nEND TIME: Tuesday, July 29, 2008, 4:05 AM (0405)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Monticello, GA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7781&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080728T110001Z SUMMARY: 7780 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080728T170001Z DESCRIPTION:TICKET NUMBER: 7780\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, July 28, 2008, 11:45 AM (1145)\nEND TIME: Monday, July 28, 2008, 1:11 PM (1311)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7780&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080722T100001Z SUMMARY: 7779 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080722T120001Z DESCRIPTION:TICKET NUMBER: 7779\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, July 22, 2008, 6:12 AM (0612)\nEND TIME: Tuesday, July 22, 2008, 6:35 AM (0635)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replaced a failing card in Wahsatch, UT. Replacement card failed, another card will be shipped at a later date. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7779&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080729T103001Z SUMMARY: 7828 NLR Layer 3 Peer MREN Emergency Maintenance DTEND:20080729T113001Z DESCRIPTION:TICKET NUMBER: 7828\nMAINTENANCE TYPE: Software\nAFFECTED: Peer MREN\n\nSCHEDULED START TIME: Tuesday, July 29, 2008, 10:30 AM (1030)\nSCHEDULED END TIME: Tuesday, July 29, 2008, 11:30 AM (1130)\nDESCRIPTION:Peer MREN upgraded to a new version of FTOS. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7828&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080713T120001Z SUMMARY: 7786 NLR Layer 3 Member LONI Maintenance DTEND:20080713T130001Z DESCRIPTION:TICKET NUMBER: 7786\nMAINTENANCE TYPE: Power\nAFFECTED: Member LONI\n\nSTART TIME: Sunday, July 13, 2008, 12:02 PM (1202)\nEND TIME: Sunday, July 13, 2008, 12:37 PM (1237)\nDESCRIPTION:Member LONI was unavailable to the community. LONI engineers report that this was due to a power maintenance that was not expected to be service affecting. The maintenance has been completed, and service has been restored.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7786&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080728T040001Z SUMMARY: 7797 NLR Layer 3 Backbone Circuit ATLA-WASH Maintenance Completed DTEND:20080728T060001Z DESCRIPTION:TICKET NUMBER: 7797\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-ATLA-WASH-10GE-64\n\nSTART TIME: Monday, July 28, 2008, 4:05 AM (0405)\nEND TIME: Monday, July 28, 2008, 4:06 AM (0406)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in McLean, VA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7797&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080730T110001Z SUMMARY: 7796 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080730T130001Z DESCRIPTION:TICKET NUMBER: 7796\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSCHEDULED START TIME: Wednesday, July 30, 2008, 11:00 AM (1100)\nSCHEDULED END TIME: Wednesday, July 30, 2008, 1:00 PM (1300)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted replacement of a failing card in Suisun City, CA. The replacement failed due to a DOA card. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7796&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080729T060001Z SUMMARY: 7799 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080729T080001Z DESCRIPTION:TICKET NUMBER: 7799\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Tuesday, July 29, 2008, 6:06 AM (0606)\nEND TIME: Tuesday, July 29, 2008, 6:19 AM (0619)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Boise, ID. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7799&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080716T060001Z SUMMARY: 7788 NLR Layer 3 Peer CA*Net4 (CHIC) Maintenance Completed DTEND:20080716T120001Z DESCRIPTION:TICKET NUMBER: 7788\nMAINTENANCE TYPE: Circuit\nAFFECTED: Peer CA*Net4 (CHIC)\n\nSTART TIME: Wednesday, July 16, 2008, 5:49 AM (0549)\nEND TIME: Wednesday, July 16, 2008, 6:01 AM (0601)\nDESCRIPTION:Peer CA*Net4(CHIC) via Winnipeg was unavailable to the NLR Community while fiber relocation was performed. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7788&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080726T190001Z SUMMARY: 7826 NLR Layer 3 Peer TransPAC2 Maintenance Completed DTEND:20080726T200001Z DESCRIPTION:TICKET NUMBER: 7826\nMAINTENANCE TYPE: Software\nAFFECTED: Peer TransPAC2\n\nSTART TIME: Saturday, July 26, 2008, 7:19 PM (1919)\nEND TIME: Saturday, July 26, 2008, 7:20 PM (1920)\nDESCRIPTION:Peer TransPAC2 engineers performed maintenance in Seattle. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7826&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080728T080001Z SUMMARY: 7800 NLR Layer 3 Backbone Circuits Spanning CHIC-KANS Maintenance Completed DTEND:20080728T100001Z DESCRIPTION:TICKET NUMBER: 7800\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\nNLR-CHIC-HOUS-10GE-67\nNLR-TULS-CHIC-10GE-97\n\nSTART TIME: Monday, July 28, 2008, 8:17 AM (0817)\nEND TIME: Monday, July 28, 2008, 8:18 AM (0818)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Odell, IL. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7800&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080730T070001Z SUMMARY: 7802 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080730T090001Z DESCRIPTION:TICKET NUMBER: 7802\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Wednesday, July 30, 2008, 7:11 AM (0711)\nEND TIME: Wednesday, July 30, 2008, 7:22 AM (0722)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a card in Denver, CO. Maintenance has been completed. \nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7802&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080804T040001Z SUMMARY: 7803 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080804T070001Z DESCRIPTION:TICKET NUMBER: 7803\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-65\nNLR-NEWY-CHIC-10GE-100\n\nSTART TIME: Monday, August 4, 2008, 6:15 AM (0615)\nEND TIME: Monday, August 4, 2008, 6:43 AM (0643)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, unsuccessfully replaced a card in Cleveland, OH. A new card will be shipped and installed at another time. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7803&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080722T070001Z SUMMARY: 7804 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080722T090001Z DESCRIPTION:TICKET NUMBER: 7804\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Tuesday, July 22, 2008, 7:11 AM (0711)\nEND TIME: Tuesday, July 22, 2008, 7:14 AM (0714)\nDESCRIPTION:NLR Layer 3 Backbone Circuit LOSA-SEAT was briefly unavailable while the fiber provider replaced an amplifier card in Sunnyvale, CA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7804&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080811T080001Z SUMMARY: 7818 NLR Layer 3 Backbone Circuit DENV-SEAT Maintenance Completed DTEND:20080811T100001Z DESCRIPTION:TICKET NUMBER: 7818\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-SEAT-10GE-58\n\nSTART TIME: Monday, August 11, 2008, 8:11 AM (0811)\nEND TIME: Monday, August 11, 2008, 8:36 AM (0836)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Gooding, ID. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7818&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080805T050001Z SUMMARY: 7806 NLR Layer 3 Backbone Circuit DENV-CHIC Maintenance Completed DTEND:20080805T070001Z DESCRIPTION:TICKET NUMBER: 7806\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-DENV-CHIC-10GE-36\n\nSTART TIME: Tuesday, August 5, 2008, 5:07 AM (0507)\nEND TIME: Tuesday, August 5, 2008, 5:34 AM (0534)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, attempted to replace a failing card in Lancaster, KS. Replacement card failed. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7806&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080806T110001Z SUMMARY: 7807 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080806T130001Z DESCRIPTION:TICKET NUMBER: 7807\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Wednesday, August 6, 2008, 11:01 AM (1101)\nEND TIME: Wednesday, August 6, 2008, 11:05 AM (1105)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a failing card in Kelso, WA. Maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7807&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080804T110001Z SUMMARY: 7805 NLR Layer 3 Backbone Circuit LOSA-SEAT Maintenance Completed DTEND:20080804T130001Z DESCRIPTION:TICKET NUMBER: 7805\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-LOSA-SEAT-10GE-49\n\nSTART TIME: Monday, August 4, 2008, 11:06 AM (1106)\nEND TIME: Monday, August 4, 2008, 11:08 AM (1108)\nDESCRIPTION:NLR Layer 1 NOC Engineering, with the assistance of a Level(3) Communications Technician, replaced a card in Sunnyvale, CA. A brief outage was incurred. This maintenance has been completed.\nTIMESTAMP: Sat Nov 7 11:03:20 2009 URL;VALUE=URI:http://tick.globalnoc.iu.edu/tickets/view.cgi?tick=7805&proj=77 END:VEVENT BEGIN:VEVENT SEQUENCE:1 DTSTART:20080806T040001Z SUMMARY: 7808 NLR Layer 3 Backbone Circuits Spanning CHIC-CLEV Maintenance Completed DTEND:20080806T060001Z DESCRIPTION:TICKET NUMBER: 7808\nMAINTENANCE TYPE: Circuit\nAFFECTED: NLR-CHIC-WASH-10GE-59\nNLR-CHIC-CLEV-10GE-